3.0 Power Plant Arrangement<br />
3.1 General<br />
The arrangement <strong>of</strong> the plant equipment shall be generally as described<br />
below:<br />
Gas Turbine Power Plant (Simple Cycle) with a continuous total net<br />
generating capacity <strong>of</strong> 65% (+ 5% variation is allowed) <strong>of</strong> combined cycle<br />
net output shall be accommodated in the location proposed.<br />
The Combined Cycle (GT+ Existing ST) Power Plant with a continuous total<br />
generating capacity at site conditions (35 0 C, 1.013 bar, 98% relative<br />
humidity) <strong>of</strong> Re-Powered project <strong>of</strong> <strong>Ghorasal</strong> 3 rd <strong>Unit</strong> with inclusion <strong>of</strong> GTG<br />
and HRSG shall be accommodated in the location proposed with required<br />
number <strong>of</strong> auxiliary system as per drawing attached. The power plant<br />
general arrangement shall be as per attached drawing.<br />
This specification covers the complete design, engineering, manufacturing,<br />
inspection, testing, supply, delivery to the Site, construction, erection, installation,<br />
testing, commissioning, commercial service and supervision <strong>for</strong><br />
the first twenty four (24) months after satisfactory per<strong>for</strong>mance tests <strong>of</strong> a<br />
combined cycle power plant <strong>of</strong> Re-Powered project <strong>of</strong> <strong>Ghorasal</strong> 3 rd <strong>Unit</strong><br />
with inclusion <strong>of</strong> GTG and HRSG at site conditions (35°C, 1.013 bar, 98%<br />
relative humidity) in two (2) identical units <strong>of</strong> gas turbine generating plant<br />
and one (1) unit <strong>of</strong> existing steam turbine generating plant suitable at the<br />
Site.<br />
The combined cycle power plant concept shall be based on using the exhaust<br />
heat from the gas turbines <strong>for</strong> heat recovery steam generator, which<br />
supply steam to the existing steam turbine.<br />
The major equipment <strong>of</strong> combined cycle plant shall include the two (2) identical<br />
simple cycle Gas turbine generating sets, Two (2) Heat Recovery<br />
Steam Generator, and one (1) Existing 210 MW Steam Turbine Generating<br />
<strong>Unit</strong>, and a comparable array <strong>of</strong> auxiliaries. The Existing Steam Turbine<br />
Generating unit shall used to accommodate steam from the heat recovery<br />
steam generator with exhaust heat collected from Gas turbine(s).<br />
The plant arrangement shall be in multi-shaft type i.e. gas turbine drives its<br />
own generator and exhausts into a heat recovery steam generator. The<br />
steam output from the heat recovery steam generator shall be combined in<br />
a header system (<strong>for</strong> 2:2:1 combination) and directed to a existing steam<br />
turbine. Depending on the station operation mode desired, exhaust gas diverter<br />
dampers shall be able to control flow to either the bypass stack <strong>for</strong><br />
simple cycle operation <strong>of</strong> the gas turbine generating set, or to the heat recovery<br />
steam generator <strong>for</strong> combined cycle operation, as and when needed<br />
as per system requirement. All <strong>of</strong> these components shall be selected to<br />
provide low capital and operating costs <strong>for</strong> mid-range or base-load application.<br />
The unfired heat recovery steam generator shall be pre-assembled in<br />
modules to reduce field erection works. The turbine shall be chosen so that<br />
the maximum plant efficiencies can be obtained.<br />
Re-Powering <strong>Ghorasal</strong> 210 MW 3 rd <strong>Unit</strong> (Vol-2A <strong>of</strong> 2) 32