drum by the circulating pump. The circulating pump shall take suction from<br />

the drum and shall discharge through the evaporator back to the drum.<br />

Each drum shall be provided with two local level gauges and two level<br />

transmitters. A level transmitter shall send a signal to the level controller<br />

and to a recorder.<br />

3.3.4 Existing Condensate System<br />

The existing condenser is located underside or alongside the turbine, with<br />

an integral hot well located under condenser shell.<br />

Three (3) x 60% capacity condensate pumps take their suction from the hot<br />

well. Condensate also to be used <strong>for</strong> the following secondary use:<br />

- Spray water <strong>for</strong> the condensate receiver and flash chamber.<br />

- Vacuum pump seals.<br />

- Turbine exhausts hood spray.<br />

- Chemical injection units.<br />

- Gland seal emergency spray.<br />

- Auxiliary cooling water make-up<br />

- Bypass steam de-superheater spray<br />

- Condenser sparging de-superheater spray.<br />

- Condenser ball cleaning (tube cleaning) system.<br />

Pressure transmitters to be used to provide condensate pump discharge pressure<br />

indication. A pressure switch shall be used to switch to the standby condensate<br />

pump when the operation pump or its motor has failed.<br />

In order to ensure a minimum flow through the gland seal condenser, the condensate<br />

flow to be measured by a flow nozzle and differential pressure transmitter,<br />

which in turn controls the re-circulation flow to the condenser through a<br />

control valve.<br />

The condenser hot well level to be controlled by level transmitters located on<br />

the hot well. The control signals from these controllers shall be programmed so<br />

that condensate shall be dumped to the make-up water tank to prevent high<br />

level in the hot well.<br />

3.3.5 Existing Cooling System<br />

Once through cooling system are used in the existing 210 MW Power plant<br />

The pumps shall be installed in the pit below minimum water level <strong>of</strong> river.<br />

A circulating water pump house shall be provided.<br />

A manual operated butterfly valve shall be provided at each circulating water<br />

pump discharge and suction.<br />

Motor operated vent valves shall be provided at the top <strong>of</strong> condenser waterbox<br />

to vent and shut the air automatically.<br />

A motor operated reversing valve shall be provided <strong>for</strong> condenser backwash<br />

purpose. A chain hoist is provided in circulating water pump house.<br />

Three (3) x 60% intake pumps are installed in the river water pump house<br />

to supply water to the condenser. A portion <strong>of</strong> which will be used <strong>for</strong> GT<br />

and GBC cooling system.<br />

Re-Powering <strong>Ghorasal</strong> 210 MW 3 rd <strong>Unit</strong> (Vol-2A <strong>of</strong> 2) 36