10.11.2014 Views

Brandon - Hillsborough Community College

Brandon - Hillsborough Community College

Brandon - Hillsborough Community College

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Hillsborough</strong> <strong>Community</strong> <strong>College</strong>: <strong>Brandon</strong> Campus<br />

- Sabrina Peacock, Business Technologies<br />

- Ellen Cangi, Associate of Arts<br />

- Richard Zaborosky, Facilities<br />

- Joe Bentrovato, Student Services<br />

- Maria Muniz, Campus President’s Office<br />

- Edwin Kelley, Campus Services<br />

The conversation focused on the changes observed since the adoption of the 2005 Master Plan for<br />

the campus. The primary focus areas discussed by the Master Planning Committee included<br />

Student Enrollment and Space Utilization, New Facilities and Reorganization, and Academic<br />

Programs.<br />

3.9.2.1 Student Enrollment and Space Utilization<br />

Growth in the campus headcount has required optimizing utilization of current space on campus.<br />

Utilization of the existing facilities is very high, and enrollments for the upcoming semester are<br />

higher than expected. The campus is considering hiring more adjunct faculty and staggering class<br />

times in order to accompany more students while minimizing traffic congestion. The campus does<br />

experience a lull in the mid afternoons, while the campus is at full capacity in the morning and the<br />

evening.<br />

3.9.2.2 New Facilities / Reorganization<br />

Since 2005, the Student Services Building has been completed, and has made a big impact on the<br />

ability to deliver services. The building is functioning well, and the campus is happy with the space.<br />

Other changes to be addressed during this Master Plan preparation include:<br />

- Head Start program has been removed from campus, and the property it occupied needs to<br />

be considered for reprogramming.<br />

- The HCC <strong>Brandon</strong> Campus has also ended its lease of the Pinebrooke Business Park<br />

Facilities<br />

- Continuing Education Programs are to be moved to the Ybor Campus<br />

- Building A6 from 2005 Master Plan is too large for funding mechanisms anticipated to be<br />

available.<br />

- Building A3 will no longer be a utilized as a community center; that use has been moved to<br />

a new facility on Bloomingdale.<br />

3.9.2.3 Academic Programs<br />

The Campus Committee identified some programming changes that will need to be noted in the<br />

Campus Master Plan. These include the following:<br />

- Addition of a new Biotechnology Program<br />

- Engineering Manufacturing has been Changed to Engineering Technology<br />

- Continuing Education Programs are moving to HCC Ybor Campus<br />

2010 Master Plan 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!