49. “Letter of Intent” – means the letter issued by <strong>BPDB</strong> to signify the selection of the<br />

Project Sponsor to develop the Project and granting the right to develop the Project on the<br />

terms specified in this RFP and in their Proposal;<br />

50. “Levelized Tariff Charge” or “LTC” – means the single value of Tariff Charge in Taka<br />

or US cents per kWh for each of the Contract Years over the Term of the PPA, which<br />

would have the same present value as the present value of the annual Tariff Charges in<br />

the Proposal of a Bidder, as calculated in accordance with Section B, Article 7 and Annex<br />

A, Exhibit II.<br />

51. “Maintenance Outage” – means an interruption or reduction of the generating capacity<br />

of the Facility that: (1) is not a Scheduled Outage; and (2) has been scheduled and<br />

allowed by <strong>BPDB</strong> in accordance with Article 9.4 of the PPA; and (3) is for the purpose of<br />

performing work on specific components of the Facility, which work should not, in the<br />

reasonable opinion of Company, be postponed until the next Scheduled Outage.<br />

52. “Maintenance Outage Energy” – means the sum of the products of (a) the reduction in<br />

Facility’s generating capacity (from the Contracted Facility Capacity) as a result of each<br />

Maintenance Outage occurring during the relevant Contract Year, expressed in MW,<br />

multiplied by (b) the number of hours that such Maintenance Outage was in effect during<br />

the relevant Contract Year.<br />

53. “MW” – means MegaWatts.<br />

54. “MWh” – means MegaWatt-hours.<br />

55. “Ministry” or “MPEMR” – means the Power Division, Ministry of Power, Energy and<br />

Mineral Resources (MPEMR) of the People’s Republic of Bangladesh.<br />

56. “Net Energy Output (NEO)” – means the net electrical energy expressed in kWh that is<br />

generated by the Facility and delivered to the Delivery Point as measured by the Metering<br />

System or the Back-Up Metering System, as the case may be.<br />

57. “O&M Agreement” – means the agreement (if any) entered into by the Company and<br />

the O&M Contractor for the operation and maintenance of the Facility.<br />

58. “O&M Contractor” – means an operating company or an entity, and any successor<br />

thereto, appointed by the Company for the operation and maintenance of the Facility.<br />

59. “Operating Member” – means the Bidder itself if it is a single firm, or a member of the<br />

Bidder consortium designated by the Bidder and pre-qualified by <strong>BPDB</strong> as a member<br />

having experience in the operation and maintenance of power plants.<br />

60. “Operations Security Deposit” – has the meaning as ascribed thereto in the draft PPA.<br />

61. “Performance Security Deposit” – means the unconditional bank guarantee in an<br />

amount equal to (a) thirty six thousand Dollars (US$ 36,000.00) multiplied by (b) the<br />

Contracted Facility Capacity, issued by a scheduled bank in Bangladesh or by a foreign<br />

bank which has been authenticated by a scheduled bank in Bangladesh and shall by its<br />

terms be encashable at a bank in Dhaka, Bangladesh, provided by the Company as<br />

security for the Company’s obligations under the PPA, including its obligations to<br />

achieve financial closing, deliver the Operations Security Deposit and to pay liquidated<br />

damages to thereunder.<br />

Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!