EXHIBIT II<br />

PROPOSED REFERENCE TARIFF AND LEVELIZED TARIFF CHARGE<br />

(TO BE INCLUDE IN ENVELOPE II)<br />

A. BASIS OF PROPOSED REFERENCE TARIFF<br />

The Bidder warrants that the proposed Reference Tariff to be inserted in the tables below, is<br />

based on the requirements of the RFP, and includes but not limited to the following specific<br />

items:<br />

All costs, without exception, required to deliver the specified electric energy, taking into<br />

consideration degradation of equipment in output and heat rate and based on the<br />

Reference Site Conditions defined in Schedule 1 of the PPA.<br />

Minimum requirement for equity investment will be (a) 20 (twenty) percent and (b) the<br />

equity investment in the Facility that in the reasonable judgment of the Lead<br />

Arranger/financial advisor is adequate to satisfy the requirement of Lenders to obtain<br />

debt financing for the Facility.<br />

Explanation of components of Reference Tariff provided in Article 7.3, Section B of the<br />

RFP and Section 13 of the PPA.<br />

Constraints on the Reference Tariff and its components listed in Section B, Article 7.<br />

Assumptions for evaluation of Reference Tariff listed in Section B, Article 7.<br />

For purposes of evaluation, the components which are to be adjusted for Exchange Rate,<br />

Foreign Index, Local Index and HFO Price will remain in constant, Bid Date values; that<br />

is, based on the values of the Bid Exchange Rate and Bid HFO Price as prescribed in the<br />

respective definitions in Section A, Article 1.<br />

Benefits of Implementation Agreement enumerated in the draft Project Agreements<br />

provided in the RFP and Private Sector Power Generation Policy of Bangladesh<br />

(provided in the Data Room).<br />

The terms and conditions of the draft Implementation Agreement and Power Purchase<br />

Agreement provided in the RFP.<br />

Financial Data in Support of Project, Exhibit III, and Bidder’s Project Schedule provided<br />

by Bidder, Exhibit VII.<br />

The Bidder shall complete the schedules and charts in the following pages by providing the<br />

required data where applicable. The Bidder shall not be allowed to make any changes in format of<br />

the schedules and charts.<br />

Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 84