EXHIBIT I<br />
ATTACHMENT I-3<br />
SUMMARY INFORMATION OF THE TECHNICAL PROPOSAL<br />
(A) Name of Lead Member ____________________________<br />
(B) Names of Consortium Members ____________________________<br />
____________________________<br />
____________________________<br />
(C) Contracted Facility Capacity (1) Offered MW<br />
(at Reference Site Condition: 35 deg C, 1.013 bar, RH 98%)<br />
(D) No. of Units ____________________________<br />
(E) Capacity of each Units ____________________________<br />
(F) Annual Availability ____________________________<br />
(G)<br />
Project Development Schedule<br />
Sl. No. Item RFP Requirement Bidder’s Proposal<br />
(From Project Effective<br />
Date)<br />
1 Financial Closing 90 days from Project<br />
Effective Date<br />
2 Commercial Operation<br />
Date of the Facility<br />
12 Months from<br />
Project Effective Date<br />
(H) Any exceptions taken to RFP in Exhibit VI? YES: ____NO: _______<br />
(I) Any technical exceptions taken to RFP in Exhibit VI? YES: _____NO:_______<br />
(J) Any exceptions taken to Project Agreements in Exhibit VI? YES: _____NO:_______<br />
Note: (1) Contracted Initial Capacity (1) is defined at 100% continuous load at Reference Site Condition,<br />
at a power factor 0.85 at Delivery Point, using HFO as fuel at the Commercial Operation Date for Item C.<br />
Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 83