2.3 Development Plan<br />

The Government has prepared the Power System Master Plan to realize its vision for the<br />

Bangladesh power sector. According to the plan, installed capacity will rise to 16,643 MW by the<br />

year 2020. In this period transmission and distribution line will reach 12,000 km and 4,77,558 km<br />

respectively. The development plan of the Government up to the year 2020 is stated below:<br />

Table: Plan of Power Sector Development<br />

Sl. No.<br />

Items<br />

FY 2009<br />

(Actual)<br />

FY 2013 FY 2020<br />

1. Installed Capacity, MW 5,719 8,865 16,643<br />

2. Maximum Demand, MW 4,162 8,364 13,993<br />

3. Net Generation, MkWh 26,416 33,000 72,222<br />

4. Transmission Line, ckt. km 8,329 9,553 12,000<br />

5. Grid Substation Capacity, MVA<br />

(a) 230 KV<br />

(b) 132 KV<br />

6,625<br />

9,567<br />

12,910<br />

13,990<br />

19,075<br />

27,367<br />

6. Distribution Line, km 2,83,494 3,30,000 4,77,558<br />

7. Number of Consumers (million) 11.25 140.00 207.67<br />

8. Number of Village Electrified 51,136 56,000 80,000<br />

9. Per Capita Generation, kWh 182 218 450<br />

10. Access to Electricity 47% 60% 90%<br />

2.4 Power Generation Program<br />

The Government has prepared Power System Master Plan (updated in 2006) to realize the goals.<br />

According to the reference forecast of Power System Master Plan, 2006 the maximum demand in<br />

2010, 2012 and 2015 would be about 6608, 7732 and 9786 MW respectively. The demand is<br />

expected to be 13,993 MW in 2020 and 14,924 MW in 2021. To meet the demand with<br />

reasonable reliability, installed capacity will be increased to 16,643 MW and 17,455 MW by the<br />

year 2020 and 2021, respectively. In this period, transmission and distribution lines will also be<br />

increased to 12,500 km and 4,87,558 km, respectively. To meet this demand of electricity, short,<br />

mid and long term generation, distribution and transmission lines expansion projects are in<br />

various stages of implementation. According to the existing generation expansion program, a total<br />

of 3,547 MW of new generation will be added to the national grid by FY 2014. Moreover, 3300<br />

MW of newly initiated generation plants will be implemented by FY 2014.<br />

Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 17