Chittagong - BPDB
Chittagong - BPDB
Chittagong - BPDB
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
B.2 Bidder’s Proposed Reference Tariff (HFO)<br />
Table B.2: Reference Tariff<br />
(To complete Table B.2 and Table B.3 bidders should follow the instructions of Section B, Article 7 of this RFP, and Section 13<br />
and Schedule 6 of draft PPA.)<br />
Contract<br />
Year<br />
Reference<br />
Non-<br />
Escalable<br />
Capacity<br />
Price<br />
Reference<br />
Foreign<br />
Escalable<br />
Capacity Price<br />
Reference<br />
Local<br />
Escalable<br />
Capacity<br />
Price<br />
Reference<br />
Capacity<br />
Price<br />
Fuel Cost<br />
Reference<br />
Foreign<br />
Variable<br />
Operation and<br />
Maintenance<br />
Price<br />
Reference Local<br />
Variable<br />
Operation and<br />
Maintenance<br />
Price<br />
Reference<br />
Energy Price<br />
Total<br />
Reference<br />
Tariff<br />
(Dollar/kW-<br />
Month)<br />
(Dollar/kW-<br />
Month)<br />
(Taka/kW-<br />
Month)<br />
(Dollar/kWh) (Taka/kWh) (Dollar/kWh) (Taka/kWh) (Dollar/kWh) (US<br />
Cents/kWh)<br />
(RNECP n ) (RECP(US) n ) (RECP(Tk) n ) (RCP n ) (RVOMP(US) n ) (RVOMP(Tk) n ) (REP n ) (RT n )<br />
Column 1 2 3 4 5 6 7 8 9<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 86