2.4.6 Start-up Capability<br />

The Company shall provide the following tele-control facilities required at the<br />

LDC:<br />

Control of the 132 kV circuit switches and reset of trip relays.<br />

Control of generator active MW and reactive MVAr.<br />

Indications of 132 kV switches and trip relays activated.<br />

Measurement of 132 kV circuit MW, MVAr, and voltage quantities.<br />

Alarm facilities in the event of any 132 kV circuit tripping and<br />

protection-operated and communication equipment failure.<br />

The Facility shall include a black start capability. It is anticipated that normal<br />

start-up power will be brought in through the main transformers. The Company<br />

may propose other schemes.<br />

3.0 DESIGN PHILOSOPHY AND PRINCIPLES<br />

3.1 DESIGN REQUIREMENTS<br />

The Facility shall be of proven design (as specified in Article 2.1), built to appropriate<br />

internationally recognized standards, and complying with all the applicable statutory<br />

codes and regulations.<br />

Facility reliability, availability, and maintainability consistent with high efficiency, are of<br />

paramount importance.<br />

The Facility shall be designed and equipment should be sized to permit reliable base load<br />

operation over the complete range of anticipated ambient conditions without limiting the<br />

plant output.<br />

Please see Article 2.1, Article 4.2 and Article 4.2.1 for a description of the minimum<br />

plant configuration requirement.<br />

3.2 PERFORMANCE REQUIREMENTS<br />

3.2.1 Operating Regime<br />

The Facility shall be capable of both base load and peaking operation. For tariff<br />

evaluation purposes, overall average annual net capacity factors will be assumed<br />

as follows (see Figure 3.1):<br />

For Years 1 through 15, Plant Factor = 80%<br />

Equation C-1<br />

Annual Net Capacity Factor (Plant Factor)<br />

=<br />

Net Power Output (MWh) for the<br />

Annual Average Dependable Capacity (MW)<br />

year<br />

× Hours Per Year<br />

“Hours Per Year” in Equation C-1 means 8760 hours.<br />

The Facility should be capable of automatic operation and control at loads<br />

between 100% and 25% of Dependable Capacity.<br />