2.4.6 Start-up Capability<br />
The Company shall provide the following tele-control facilities required at the<br />
LDC:<br />
Control of the 132 kV circuit switches and reset of trip relays.<br />
Control of generator active MW and reactive MVAr.<br />
Indications of 132 kV switches and trip relays activated.<br />
Measurement of 132 kV circuit MW, MVAr, and voltage quantities.<br />
Alarm facilities in the event of any 132 kV circuit tripping and<br />
protection-operated and communication equipment failure.<br />
The Facility shall include a black start capability. It is anticipated that normal<br />
start-up power will be brought in through the main transformers. The Company<br />
may propose other schemes.<br />
3.0 DESIGN PHILOSOPHY AND PRINCIPLES<br />
3.1 DESIGN REQUIREMENTS<br />
The Facility shall be of proven design (as specified in Article 2.1), built to appropriate<br />
internationally recognized standards, and complying with all the applicable statutory<br />
codes and regulations.<br />
Facility reliability, availability, and maintainability consistent with high efficiency, are of<br />
paramount importance.<br />
The Facility shall be designed and equipment should be sized to permit reliable base load<br />
operation over the complete range of anticipated ambient conditions without limiting the<br />
plant output.<br />
Please see Article 2.1, Article 4.2 and Article 4.2.1 for a description of the minimum<br />
plant configuration requirement.<br />
3.2 PERFORMANCE REQUIREMENTS<br />
3.2.1 Operating Regime<br />
The Facility shall be capable of both base load and peaking operation. For tariff<br />
evaluation purposes, overall average annual net capacity factors will be assumed<br />
as follows (see Figure 3.1):<br />
For Years 1 through 15, Plant Factor = 80%<br />
Equation C-1<br />
Annual Net Capacity Factor (Plant Factor)<br />
=<br />
Net Power Output (MWh) for the<br />
Annual Average Dependable Capacity (MW)<br />
year<br />
× Hours Per Year<br />
“Hours Per Year” in Equation C-1 means 8760 hours.<br />
The Facility should be capable of automatic operation and control at loads<br />
between 100% and 25% of Dependable Capacity.<br />
Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 55