3.0 Has financial data been submitted which verifies Facility financability?<br />

Yes No Remarks<br />

3.1 Evidence (commitment letter(s) from financing institutions) of<br />

availability of necessary debt financing for the Facility?<br />

3.2 Evidence of necessary commitments of equity from the Bidder /<br />

consortium (commitment from the Chief Executive Officer or<br />

Treasurer/Controller) has been provided?<br />

3.3 Does financing structure meets maximum 80:20 debt: equity ratio?<br />

3.4 Is the Debt Service Coverage Ratio (DSCR) in any Contract Year<br />

is equal to or greater than 1.20?<br />

4.0 Has technical data been submitted which demonstrates compliance with<br />

Technical Performance Requirements?<br />

4.1 Is the proposed Contracted Facility Capacity in the range of<br />

50±10% MW (net)?<br />

4.2 Is the proposed Contracted Facility Capacity matches with the<br />

declared capacity in Part-1 (Qualification Document)?<br />

4.3 Has the Bidder proposed the engine generators, each capacity of at<br />

least 5 MW?<br />

4.4 Has the Bidder proposed new machines?<br />

4.5 Does the Facility design satisfy the minimum configuration<br />

requirements in Annex C, Article 4.2?<br />

4.6 Confirmation that degradation of efficiency is included in the<br />

Guaranteed Heat Rate proposal?<br />

4.7 Preliminary designs and descriptions provided?<br />

4.8 Experience reference for major Facility components provided?<br />

4.9 Has the Bidder provided the end user certificate in support of the<br />

experience for major Facility components?<br />

4.10 Has the Bidder confirmed that environmental standards will be<br />

met?<br />

4.11 Evidence provided showing major Facility components are well<br />

proven equipment/technology?<br />

4.12 Has the Bidder stated that the Facility will be designed to provide a<br />

22 years operating life and provided satisfactory details as to how<br />

this will be achieved?<br />

4.13 Is there provision for Black Start?<br />

Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 44