4.4.6 Design Loadings<br />

The design for each facility shall incorporate the worst load combination taking<br />

into account the following criteria where applicable:<br />

(a) Dead Loads - all load arising from the mass of materials making up the<br />

permanent works.<br />

(b) Live Loads - all superimposed loads arising from station operations,<br />

testing, traffic, cranes, storage of liquids and the like. These shall be<br />

derived from approved standards and shall represent a minimum load to<br />

be taken.<br />

(c) Wind loads shall be calculated in accordance with the Bangladesh<br />

National Building Code.<br />

(d) Road Loading - the design of the roads shall be satisfactory for the<br />

maximum load anticipated during both the construction and operational<br />

period of the project.<br />

(e) Seismic Loading - the design seismic lateral forces shall be calculated<br />

either by the Equivalent Static Force method, or by the Dynamic<br />

Response Method, based on the requirements of the Bangladesh National<br />

Building Code as a minimum, or other approved, internationally<br />

recognized standard.<br />

4.4.7 Materials<br />

Materials shall be durable and fit for purpose. Materials for external surfaces<br />

shall be selected for aesthetic qualities and proven durability to withstand all<br />

climatic conditions likely to be experienced, ease of maintenance and economy<br />

of cost. Every endeavor shall be made to create as pleasant a working<br />

environment as is practical for the staff working in the buildings of the Facility.<br />

4.4.8 Workmanship<br />

All workmanship shall be in accordance with accepted international practice to<br />

ensure work is fit for the purpose and shall be serviceable for the design life of<br />

the Facility.<br />

4.5 ENVIRONMENTAL REQUIREMENTS<br />

The Project shall comply with the environmental requirements of the GOB (Environment<br />

Conservation Rule 1997) and the World Bank Group environmental requirements or any<br />

Internationally accepted Environmental Guideline for Stack emission Limits as in effect<br />

thirty (30) days prior to the Bid Date, under all ambient conditions. Relevant supporting<br />

documents is to be provided with the proposal for the proposed standards as in effect<br />

thirty (30) days prior to the Bid Date.<br />

Prior to Financial Close, the Project Sponsor must prepare and submit to the Ministry of<br />

Environment and Forest an Intermediate Environmental Evaluation (IEE) or<br />

Environmental Impact Assessment (EIA), as appropriate, which demonstrates that the<br />

Facility will produce impacts that are minimal and within an acceptable range, as well as<br />

meeting all Bangladesh and World Bank Group environmental regulatory requirements or<br />

any Internationally accepted Environmental Guideline for Stack emission. The EIS shall<br />

include, but not be limited to:<br />

Request for Proposal (<strong>Chittagong</strong> 50±10% MW HFO Fired Project) Page 66