- Page 1 and 2:
BANGLADESH POWER DEVELOPMENT BOARD
- Page 3 and 4:
BANGLADESH POWER DEVELOPMENT BOARD
- Page 5 and 6:
3. For the purpose of preparation o
- Page 7 and 8:
1. DEFINITIONS The following terms
- Page 9 and 10:
18. “Contractors” - means the C
- Page 11 and 12:
37. “Government Authority” - me
- Page 13 and 14:
62. “Permitted Outage” - In res
- Page 15 and 16:
86. “Sonali Bank” - means Sonal
- Page 17 and 18:
2.3 Development Plan The Government
- Page 19 and 20:
3.5 In order to translate this expl
- Page 21 and 22:
COD the Operating Member shall be r
- Page 23 and 24:
c. The Tariff Charges shall be spec
- Page 25 and 26:
5.7 Calculation of Capacity Payment
- Page 27 and 28:
5.9 Supplemental Payments In additi
- Page 29 and 30:
SECTION B: INSTRUCTIONS TO BIDDERS
- Page 31 and 32:
GENERAL 1. SELECTION PROCESS 1.1 Bi
- Page 33 and 34:
4. Not used c. Failure to investiga
- Page 35 and 36:
6.4.1. Proposal Letter and Bid Secu
- Page 37 and 38:
The Bidder shall propose the Refere
- Page 39 and 40:
7.6.1 Mathematical Formulae a. Calc
- Page 41 and 42:
23. EVALUATION OF PROPOSALS 23.1 BP
- Page 43 and 44:
Annex A Responsiveness Checklist Th
- Page 45 and 46:
5.0 Additional Supportive Data Yes
- Page 47 and 48:
Annex C Plant Functional Specificat
- Page 49 and 50:
2.0 PROJECT INFORMATION AND SCOPE 2
- Page 51 and 52:
• generator step-up; startup, sta
- Page 53 and 54:
2.4.2.3 Cooling Water Method of coo
- Page 55 and 56:
2.4.6 Start-up Capability The Compa
- Page 57 and 58:
3.2.4 Operating and Control Require
- Page 59 and 60:
ASTM American Society for Testing a
- Page 61 and 62:
4.2.5 Wastewater Treatment Plant 4.
- Page 63 and 64:
4.3.5 Excitation System A continuou
- Page 65 and 66:
Separate summators shall be provide
- Page 67 and 68:
(i) (ii) (iii) (iv) (v) (vi) (vii)
- Page 69 and 70:
5.3 TESTS DURING MANUFACTURE In gen
- Page 71 and 72: 5.5.2 Other Tests Required Under th
- Page 73 and 74: 6.2 DESCRIPTION OF THE PLOT 6.2.1 S
- Page 75 and 76: Figure 2.1 Preliminary Remote Termi
- Page 77 and 78: Annex D Bidder’s Proposal and Sup
- Page 79 and 80: 2. Having examined and being fully
- Page 81 and 82: EXHIBIT I ATTACHMENT I-2 FORM OF BI
- Page 83 and 84: EXHIBIT I ATTACHMENT I-3 SUMMARY IN
- Page 85 and 86: B. BIDDER’S PROPOSED TARIFF CHARG
- Page 87 and 88: Notes to Table B.2: 1. Columns 4, 5
- Page 89 and 90: B.4.5 B.4.6 Total Reference Tariff
- Page 91 and 92: 1.0 FINANCING PLAN EXHIBIT III FINA
- Page 93 and 94: 2.0 DOCUMENTATION In support of the
- Page 95 and 96: TECHNICAL DATA 1.0 Guaranteed Data
- Page 97 and 98: 5.0 Detailed Technical Information
- Page 99 and 100: Description 5.5 Black Start Diesel
- Page 101 and 102: 8.7.6 Describe the equipment procur
- Page 103 and 104: Emission Percent Removal Efficiency
- Page 105 and 106: Table 11.3: Contracted Capacity Yea
- Page 107 and 108: (a) For the purposes of this Schedu
- Page 109 and 110: 1. Legal Form and Organization of B
- Page 111 and 112: 2. Not used 3. Information regardin
- Page 113 and 114: Table 4: Project Reference of Const
- Page 115 and 116: Table 6: Project Reference of O&M C
- Page 117 and 118: Table 8: Reference for Main Equipme
- Page 119 and 120: 7. Information regarding Financial
- Page 121: EXHIBIT VII BIDDER’S PROJECT SCHE