sy24inst2 - The Initiative Group
sy24inst2 - The Initiative Group
sy24inst2 - The Initiative Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Rendamax<br />
4 Delivery and transport<br />
4.1 Delivery<br />
<strong>The</strong> unit comes standard fully assembled, tested and packaged.<br />
After delivery and removal of the protective covering, check the appliance for damage.<br />
Check that the equipment delivered is in accordance with the order and the delivery note.<br />
On delivery, check the data plate for the correct boiler type and gas supply pressure.<br />
4.2 Packaging<br />
<strong>The</strong> unit is supplied in cardboard packaging on a pallet.<br />
For transport, consult the technical details for dimensions and weight.<br />
4.3 Transport<br />
xw<br />
Remove the packaging preferably after transportation and positioning in the boiler room or<br />
remove the panels before transporting the appliance. This is to prevent damage to the casing<br />
panels.<br />
Moving the appliance<br />
A pallet truck or fork lift truck used at the front or side of the unit.<br />
Standard door width<br />
<strong>The</strong> dimensions of the unit are such that after removing the pallet, all types will fit through a<br />
standard width door opening of 80 cm (remove the outside panels of type R307).<br />
Positioning<br />
Once the boiler has been installed, it can be adjusted horizontally using the adjusting feet.<br />
Subsequently, the water, gas, condensate and electrical connections can be made.<br />
w<br />
Protection against frost<br />
If the unit is out of use during the winter months there is a danger of freezing. Drain the water<br />
from the installation using the filling/drainage valves.<br />
Doc586/50CV22C 11