Rendamax<br />

Adjusting the gas valve R301 - R307<br />

Two screws are located at the gas valve which can be used to adjust the gas volume (CO 2 value).<br />

Run the boiler at full load and check the CO 2 value. Adjust if necessary using the flat screw<br />

(types 1 and 2) or the inbus screw (types 3 to 7).<br />

Run the boiler at minimum load and check the CO 2 value. Adjust if necessary using the torcx<br />

screw.<br />

Adjusting the air-pressure switch R301 - R307<br />

<strong>The</strong> air-pressure switch is set at 80% of the fan speed when pre-ventilating.<br />

For example:<br />

Pre-ventilating takes place at 80 rps.<br />

<strong>The</strong> air-pressure switch is set to 0.8 x 80 = 64 rps.<br />

<strong>The</strong> actual switching moment can be read on the display.<br />

If the appliance is checked in the manner indicated, and corrected as necessary, the following<br />

pressures, at full capacity, must be recorded for reference on the commissioning report note:<br />

P vent<br />

P bb<br />

P vent -P bb (measure separately!)<br />

P vh<br />

∆T.<br />

8 Maintenance<br />

8.1 Safety<br />

During maintenance activities, always wear suitable clothing and shoes. Consider your own<br />

safety, particularly in respect of jewellery and loose clothing.<br />

8.2 General<br />

In order to ensure continued good and safe operation of the appliance, this must be inspected at<br />

least once per year.<br />

<strong>The</strong> following activities must be carried out (for an extensive description of these activities, see<br />

8.3):<br />

- Renew the ignition and ionisation electrodes<br />

- Clean the fan blades<br />

- Clean the condensate receptacle<br />

- Clean the condensate trap and the drainage pipe from the appliance<br />

- Inspect all pressure measurement pipes and nipples<br />

- After removing the panels from the left hand side of the appliance, ignition and burning can be<br />

observed via a sight glass<br />

- Test the unit at the flue gas side for CO 2 and CO and correct these at both full and minimum<br />

capacity if necessary<br />

- Check all the safety functions, and make any necessary adjustments<br />

- Measure the water temperature difference ∆T as a measure of the flow rate<br />

- Check the water pressure<br />

- Check the water quality: hardness and chloride content<br />

- Record all data<br />

- Clean the outside of all the panels and ensure that these all have a smart appearance.<br />