STREET AND THOROUGHFARE CAPITAL IMPROVEMENTS<br />

MISSION<br />

Street and Thoroughfare <strong>capital</strong> <strong>improvement</strong>s seek to enhance the overall<br />

transportation system in the <strong>City</strong> <strong>of</strong> <strong>Dallas</strong> to provide safe and efficient<br />

movement <strong>of</strong> people, goods and services throughout the <strong>City</strong>. These<br />

projects include participation with other agencies for <strong>improvement</strong>s to<br />

intersections, thoroughfares and alternative modes <strong>of</strong> transportation, as well<br />

as street resurfacing, street petitions, street reconstruction, local collectors,<br />

sidewalks, thoroughfare <strong>improvement</strong>s, alley petitions and reconstruction,<br />

and bridge repair and modification.<br />

HIGHLIGHTED ACCOMPLISHMENTS FOR FY 2011-12<br />

1. Completed 3 alley petition projects including alley between Goodwin<br />

Ave & Vanderbilt Ave from Laneri Ave to Glencoe St, alley between<br />

Nebraska Ave & Ramona Ave from Maywood Ave to Graceland Ave<br />

and alley between Thurston Dr & Wanebe Dr from Bombay Ave to<br />

Gilford St<br />

2. Completed 7 alley reconstruction projects including alley between<br />

Aberdeen Ave & Mimosa Lane - Tibbs to Edgemere, Azalea & Rex -<br />

Preston to "T" Alley1, Cromwell (11001) - Royal to Cromwell, Image<br />

La (4406 - 4530) "T" Alley to Cockrell Hill, Marquette(7207) &<br />

Centenary - Airline to Durham, Talisman Dr & Wildflower from<br />

Wildflower to Caraway and Tennant (509-517) Hampton - Jefferson<br />

to Tennant.<br />

3. Completed Barrier Free Ramp Group 01-2011 which includes<br />

approximately 300 ramps and slope-downs.<br />

4. Completed 12 Bridge Repair and Modification projects.<br />

5. Completed a paving and drainage <strong>improvement</strong>s for Danieldale from<br />

Polk to Hampton.<br />

6. Completed Sidewalk Improvement Group 06-142.<br />

7. Completed 9 Safe Route to School sidewalk projects at the following<br />

school: Albert Sydney Johnston Elementary, Anson Jones<br />

Elementary, George W. Truett Elementary, J. P. Starks Elementary,<br />

John Ireland Elementary, Oran M. Roberts Elementary, Reinhardt<br />

Elementary, Sarah Zumwalt Middle, and White Rock Elementary.<br />

8. Completed 6 Street Reconstruction projects including Crown Rd -<br />

Emerald St to Goodnight Lane, Dilworth Rd - Pagemill Rd to<br />

Hillguard Rd, Dolphin Rd - Samuell Blvd to Merrifield Rd, Lemmon<br />

Ave - Caddo St to N Haskell Av, Petal St - 11000 Block, and Samuell<br />

Blvd - Tennison Pkwy to UP RR.<br />

9. Completed 3 Streetscape/Urban Design projects including Buckner<br />

Blvd (Phase II) - Bruton to Scyene, Greenville Ave - Belmont to<br />

Ross, and Main Street from Market to Griffin.<br />

10. Completed 369 Resident Cost-Share Sidewalk Replacement<br />

projects.<br />

11. Completed 43 Fast-Fix Sidewalk Replacement projects.<br />

12. Completed 68 segments <strong>of</strong> street resurfacing for a total <strong>of</strong> 96 lane<br />

miles.<br />

<strong>13</strong>. Completed 10 Intergovernmental Partnership Projects including<br />

Lake Highlands Town Center Phase 3, Medical District Drive from<br />

Harry Hines to Maple, Harry Hines Ramps at Oak Lawns, Spring<br />

Valley/Coit Pedestrian Amenities (ARRA), Kiestwood Trail, Cedars<br />

Station - South Side Pedestrian District, IH20 at Clark Road,<br />

LBJ/Skillman Station Pedestrian Bridge, Irving at Mockingbird<br />

Intersection Improvements, and Midway at Trinity Mills Intersection<br />

Improvements..<br />

HIGHLIGHTED OBJECTIVES FOR FY <strong>2012</strong>-<strong>13</strong><br />

1. Complete 11 alley reconstruction projects.<br />

2. Complete 4 bridge repair and modification projects.<br />

3. Complete 1 Public Private Partnership project.<br />

4. Complete 6 sidewalk <strong>improvement</strong> projects.<br />

5. Complete 15 street petitions projects.<br />

6. Complete 17 street reconstruction projects.<br />