fy 2012-13 proposed capital improvement budget - City of Dallas
fy 2012-13 proposed capital improvement budget - City of Dallas
fy 2012-13 proposed capital improvement budget - City of Dallas
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STREET AND THOROUGHFARE CAPITAL IMPROVEMENTS<br />
MISSION<br />
Street and Thoroughfare <strong>capital</strong> <strong>improvement</strong>s seek to enhance the overall<br />
transportation system in the <strong>City</strong> <strong>of</strong> <strong>Dallas</strong> to provide safe and efficient<br />
movement <strong>of</strong> people, goods and services throughout the <strong>City</strong>. These<br />
projects include participation with other agencies for <strong>improvement</strong>s to<br />
intersections, thoroughfares and alternative modes <strong>of</strong> transportation, as well<br />
as street resurfacing, street petitions, street reconstruction, local collectors,<br />
sidewalks, thoroughfare <strong>improvement</strong>s, alley petitions and reconstruction,<br />
and bridge repair and modification.<br />
HIGHLIGHTED ACCOMPLISHMENTS FOR FY 2011-12<br />
1. Completed 3 alley petition projects including alley between Goodwin<br />
Ave & Vanderbilt Ave from Laneri Ave to Glencoe St, alley between<br />
Nebraska Ave & Ramona Ave from Maywood Ave to Graceland Ave<br />
and alley between Thurston Dr & Wanebe Dr from Bombay Ave to<br />
Gilford St<br />
2. Completed 7 alley reconstruction projects including alley between<br />
Aberdeen Ave & Mimosa Lane - Tibbs to Edgemere, Azalea & Rex -<br />
Preston to "T" Alley1, Cromwell (11001) - Royal to Cromwell, Image<br />
La (4406 - 4530) "T" Alley to Cockrell Hill, Marquette(7207) &<br />
Centenary - Airline to Durham, Talisman Dr & Wildflower from<br />
Wildflower to Caraway and Tennant (509-517) Hampton - Jefferson<br />
to Tennant.<br />
3. Completed Barrier Free Ramp Group 01-2011 which includes<br />
approximately 300 ramps and slope-downs.<br />
4. Completed 12 Bridge Repair and Modification projects.<br />
5. Completed a paving and drainage <strong>improvement</strong>s for Danieldale from<br />
Polk to Hampton.<br />
6. Completed Sidewalk Improvement Group 06-142.<br />
7. Completed 9 Safe Route to School sidewalk projects at the following<br />
school: Albert Sydney Johnston Elementary, Anson Jones<br />
Elementary, George W. Truett Elementary, J. P. Starks Elementary,<br />
John Ireland Elementary, Oran M. Roberts Elementary, Reinhardt<br />
Elementary, Sarah Zumwalt Middle, and White Rock Elementary.<br />
8. Completed 6 Street Reconstruction projects including Crown Rd -<br />
Emerald St to Goodnight Lane, Dilworth Rd - Pagemill Rd to<br />
Hillguard Rd, Dolphin Rd - Samuell Blvd to Merrifield Rd, Lemmon<br />
Ave - Caddo St to N Haskell Av, Petal St - 11000 Block, and Samuell<br />
Blvd - Tennison Pkwy to UP RR.<br />
9. Completed 3 Streetscape/Urban Design projects including Buckner<br />
Blvd (Phase II) - Bruton to Scyene, Greenville Ave - Belmont to<br />
Ross, and Main Street from Market to Griffin.<br />
10. Completed 369 Resident Cost-Share Sidewalk Replacement<br />
projects.<br />
11. Completed 43 Fast-Fix Sidewalk Replacement projects.<br />
12. Completed 68 segments <strong>of</strong> street resurfacing for a total <strong>of</strong> 96 lane<br />
miles.<br />
<strong>13</strong>. Completed 10 Intergovernmental Partnership Projects including<br />
Lake Highlands Town Center Phase 3, Medical District Drive from<br />
Harry Hines to Maple, Harry Hines Ramps at Oak Lawns, Spring<br />
Valley/Coit Pedestrian Amenities (ARRA), Kiestwood Trail, Cedars<br />
Station - South Side Pedestrian District, IH20 at Clark Road,<br />
LBJ/Skillman Station Pedestrian Bridge, Irving at Mockingbird<br />
Intersection Improvements, and Midway at Trinity Mills Intersection<br />
Improvements..<br />
HIGHLIGHTED OBJECTIVES FOR FY <strong>2012</strong>-<strong>13</strong><br />
1. Complete 11 alley reconstruction projects.<br />
2. Complete 4 bridge repair and modification projects.<br />
3. Complete 1 Public Private Partnership project.<br />
4. Complete 6 sidewalk <strong>improvement</strong> projects.<br />
5. Complete 15 street petitions projects.<br />
6. Complete 17 street reconstruction projects.<br />
421