STREET AND THOROUGHFARE CAPITAL IMPROVEMENTS<br />

Target Neighborhood Improvement <strong>of</strong> substandard residential streets to<br />

current <strong>City</strong> standards without requiring street petition. Property owners will<br />

be assessed for a portion <strong>of</strong> the cost.<br />

Thoroughfares Roadway projects that improve the capacity <strong>of</strong> a segment <strong>of</strong><br />

Roadway by constructing it to the standard identified on the Thoroughfare<br />

Plan or CBD Streets and Vehicular Circulation Plan.<br />

Traffic Devices - Illuminated Crosswalks Installation <strong>of</strong> mid-block<br />

pedestrian crosswalks with illuminated pavement markers for increased<br />

pedestrian safety.<br />

Traffic Signal Control Equipment Upgrades Replace traffic control<br />

equipment citywide (signal controllers and conflict monitors) that have<br />

exceeded their design life. As electronic equipment ages, the number <strong>of</strong><br />

failures increases. Equipment reliability effects traffic safety and congestion.<br />

Traffic Signal Upgrades Replacement <strong>of</strong> traffic signal hardware that is<br />

structurally deficient, prone to being damaged by vehicles, and/or requires<br />

operational <strong>improvement</strong> such as the addition <strong>of</strong> left turn signals or<br />

pedestrian signals. In the Central Business District, signal poles will be<br />

replaced by a streetscape-style hardware that have higher signal display<br />

mounting heights providing better visibility.<br />

Trinity River Transportation Related Projects Engineering studies, design,<br />

initial right-<strong>of</strong>-way acquisition and construction <strong>of</strong> transportation related<br />

<strong>improvement</strong>s in the Trinity River Corridor.<br />

Develop Bond Program for November <strong>2012</strong> Election Update the Needs<br />

Inventory and prioritize projects for inclusion in the bond program.<br />

424