1 National Secondary Major Schemes<br />
Route Description of Works 2009 € <strong>2010</strong> €<br />
N52 Tullamore Bypass 29,250,000 2,855,000<br />
N52 Kilbeggan to Tullamore 150,000 300,000<br />
N52 Tullamore to Kilbeggan Link<br />
Work on the preliminary design, ground investigation and<br />
environmental assessment of the proposed dual carriageway link<br />
between Tullamore and Kilbeggan continued during <strong>2010</strong>. An<br />
Environmental Impact Statement is currently being prepared and is<br />
due to be completed by May 2011. Approval from the NRA to<br />
proceed to CPO/Statutory Process will be sought at that time.<br />
TOTAL 29,400,000 3,155,000<br />
Tullamore By-Pass<br />
The Bypass opened on October 23rd 2009. The construction contract<br />
makes provision for a 3 year maintenance and defects period. The<br />
most significant defect to date was the failure of sections of the<br />
pavement surfacing to comply with specified skid resistance<br />
criteria. Extensive remedial work was carried out during <strong>2010</strong> and<br />
further testing will be carried out during 2011 in order to confirm that<br />
surfacing meets the specification.<br />
2 National Secondary Pavement and Minor<br />
Improvement & Bridge Rehabilitation<br />
The following table indicates the percentage of Minor Improvement<br />
Works (Overlays) carried out between 2006 and <strong>2010</strong> on the National<br />
Secondary Road Network: -<br />
Year Length (Km) % of N.S. Allocation €<br />
Resurfacing of the following roads were carried out and funded from<br />
the residual network improvement grant in <strong>2010</strong>:<br />
• 1200m of pavement overlay at Bunaterin<br />
• 900m of pavement overlay on the Charleville Road<br />
• 1350m of pavement overlay on the Clara Road<br />
• 1000m of pavement overlay on the Daingean Road (west and<br />
east of the bypass)<br />
• 500m of pavement overlay on the Tinnycross Road<br />
• 2000m of surface dressing in the townland of Lynally<br />
2006 6.50 5.00 2,375,000<br />
2007 9.60 8.00 2,523,000<br />
2008 4.55 3.76 970,000<br />
2009 Localised Repairs 500,000<br />
<strong>2010</strong> 13.90 (6.10 Kms of<br />
repairs + 7.80 Kms<br />
O/L Schemes)<br />
10.00 1,273,000<br />
(Final Allocation<br />
€2,237,600)<br />
The <strong>2010</strong> initial allocation of €1,273,000 was divided between pavement<br />
surfacing and pavement repairs. The repair work was carried out<br />
on pavements that suffered structural damage due to the previous<br />
winter severe weather conditions.<br />
Page 32 | <strong>Offaly</strong> <strong>County</strong> <strong>Council</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2010</strong>