Annual Report 2010 Publisher full - Offaly County Council
Annual Report 2010 Publisher full - Offaly County Council
Annual Report 2010 Publisher full - Offaly County Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3 National Secondary Safety Measures<br />
There was a substantial increase in this initial allocation from<br />
€200,000 in 2009 to €957,000 in <strong>2010</strong>. The details of the <strong>2010</strong><br />
schemes are outlined below: -<br />
Rd. Description of Works <strong>2010</strong> (I)<br />
€<br />
<strong>2010</strong> (F)<br />
€<br />
N52 Arden Road Tullamore 5,000 5,000<br />
N52<br />
Kilcormac Pedestrian 80,000 80,000<br />
Improvements<br />
N52<br />
Kilcruttin Pedestrian 30,000 nil<br />
Improvements, Tullamore<br />
N62<br />
Blackbull Junction and 305,0000 450,000<br />
adjoining lay-by<br />
N62 Birr Road, Cloghan 60,000 60,000<br />
N62 Chapel Lane, Birr 15,000 15,000<br />
N80 Derrybeg, Tullamore 10,000 10,000<br />
N80 Woodfield Clara 10,000 10,000<br />
N80 Scrub Cross, Killeigh 240,000 240,000<br />
N80 Traffic Calming, Tubber 202,000 404,000<br />
*N6<br />
2<br />
Doon Cross Traffic Calming nil 118,000<br />
I = Initial Allocation F = Final Allocation<br />
• Additional Scheme<br />
957,000 1,392,000<br />
Tober Village<br />
The <strong>2010</strong> allocations enabled <strong>Offaly</strong> <strong>County</strong> <strong>Council</strong> carry out the following<br />
works: -<br />
• Assessment of the N52 pavement on Arden Road Tullamore.<br />
• Road improvements, road markings, pedestrian crossing & construct<br />
new footpaths where narrow or non-existent on the Tullamore<br />
approach to Kilcormac.<br />
• Provision of a right turning lane, widening of carriageway,<br />
drainage works, lining and signing at Blackbull junction on N62.<br />
• Re-alignment of junction to improve visibility and turning<br />
movements of large vehicles at Birr Road, Cloghan.<br />
• Raise road pavement on Chapel Lane, Birr at junction with N62<br />
to improve visibility.<br />
• Improve visibility at junction of Derrybeg Road with the N80<br />
Tullamore/Killeigh road.<br />
Page 35 | <strong>Offaly</strong> <strong>County</strong> <strong>Council</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2010</strong>