Water Services Capital Schemes<br />

The Capital Schemes Programme consists of new or substantial<br />

upgrades to existing Water Supply and Wastewater schemes in the<br />

<strong>County</strong>. Schemes are generally funded through either the<br />

I. Water Services Investment Programme (WSIP)<br />

II. Rural Water Small Schemes Programme (RWP)<br />

III. Special Development Contribution Schemes (SDC).<br />

The Major Capital Schemes are set out in the Department of<br />

Environment, Heritage and Local Government Water Services<br />

Investment Programme (WSIP) <strong>2010</strong>-2012. (Appendix 1)<br />

This programme was published in April <strong>2010</strong> with the omission of<br />

several schemes that were on the previous WSIP. The focus of the<br />

Current WSIP is on the main towns and Water network rehabilitation.<br />

While most Water Services Capital Schemes require in the order of<br />

30% Local funding, network rehabilitation only requires 10% Local<br />

funding and is therefore extremely good value to the Local Authority.<br />

Construction of the following Schemes were completed or<br />

commenced in <strong>2010</strong>:<br />

Scheme Cost Source of<br />

Funding<br />

Daingean WSS Improvements €100k SS<br />

Effluent Quality Improvement<br />

Measures in Moneygall, Rhode,<br />

Cloghan & Kilcormac<br />

Water Quality Improvement(Monitors<br />

& Telemetry)<br />

Water Main Upgrades in Sharavogue<br />

(Shinrone WSS)<br />

Edenderry WSS Upgrade-New<br />

Borehole (Complete)<br />

Tullamore Wastewater Treatment<br />

Plant Upgrade<br />

(In Progress)<br />

Ballinagar Wastewater Treatment<br />

Plant Upgrade (commenced<br />

December <strong>2010</strong>)<br />

€130k SS<br />

€50k SS<br />

€60k SS<br />

€25k SS<br />

€20m WSIP<br />

€750k SDC<br />

The upgrade of Tullamore Wastewater Treatment Plant under the<br />

WSIP commenced construction in <strong>2010</strong>. The upgrade of Tullamore<br />

WSS, consisting of the upgrade of Clonaslee WTP and a new source<br />

at Arden are awaiting DEHLG approval.<br />

Detailed Design and Contract Documents for the following WSIP<br />

Schemes were progressed in <strong>2010</strong>:<br />

I. Tullamore Sewerage Scheme Collection System<br />

II. Tullamore Water Supply Scheme-Clonaslee Upgrade<br />

III. Edenderry Sewerage Scheme<br />

IV. Birr WSS<br />

V. Birr SS<br />

VI. Clara Wastewater Treatment Plant Upgrade.<br />

Rural Water Programme<br />

Allocation for <strong>2010</strong> was:<br />

Interim Works on ECJ Schemes: € 40,000.00<br />

Connect to Public Main: € 0.00<br />

Take Over by Local Authority: € 80,000.00<br />

Upgrade: € 400,000.00<br />

Small Public Schemes: € 450,000.00<br />

€ 970,000.00<br />

Funding in <strong>2010</strong> for Group Water Schemes was mainly granted for<br />

upgrade works and for completion of existing schemes. No funding<br />

was received for any new group water schemes. 8 schemes have<br />

been grant aided in respect of upgrade/refurbishment works. The<br />

works consisted of, site purchase for reservoirs, pipeline extensions<br />

and replacement and source improvements.<br />

Group Water Schemes Activity <strong>2010</strong><br />

There was a very significant improvement in Private Group Scheme<br />

Water Quality in 2009. At the start of the Year, 1 GWS was on a “Boil<br />

Notice” because of non-compliance with Bacteriological Parameters.<br />

At the end of the year, all Private GWS were <strong>full</strong>y compliant with<br />

Drinking Water Quality Standards and all restrictions have been<br />

removed.<br />

Page 50 | <strong>Offaly</strong> <strong>County</strong> <strong>Council</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2010</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!