page 100 Appendices
Literature Citations Caughdenoy Dam Study, Oswego County, NY, D212290 – Term Agreement Assignment #6, TAMS Consultants, Inc. February, 1999. Cross <strong>Lake</strong> / Seneca River Flood Damage Reduction Measures, Final Detailed Project Report <strong>and</strong> Environmental Assessment, US Army Corps of Engineers, January 1999. Operational Audit <strong>for</strong> the New York State Canal System: Oswego River Basin, Baker Engineering, NY, September 1997. Review of Project Operation <strong>and</strong> Local Flooding, Federal Energy Regulatory Commission, Phoenix Hydroelectric Project FERC No. 4113, December 1996. <strong>Oneida</strong> <strong>Lake</strong>, Oswego <strong>and</strong> <strong>Oneida</strong> Counties, New York, Reconnaissance Report, Section 205 of the 1958 Flood Control Act, as amended, April 1989. <strong>Oneida</strong> <strong>Lake</strong>, Beach Road Flood Study, Town of Cicero, Onondaga County, New York, Calocerinos <strong>and</strong> Spina Consulting Engineers, October 1985. <strong>Oneida</strong> <strong>Lake</strong> N.Y. (Final Feasibility Report), Oswego River Basin, N.Y., <strong>Management</strong> Plan Analysis, US Army Corps of Engineers, January 1984. Preliminary Institutional Studies, Oswego River Watershed, New York, Volume 1, Main Report, Acres American Incorporated, (<strong>for</strong> Department of Army, Buffalo District, Corps of Engineers), December 1979.