A Management Strategy for Oneida Lake and its ... - CNY RPDB Home
A Management Strategy for Oneida Lake and its ... - CNY RPDB Home
A Management Strategy for Oneida Lake and its ... - CNY RPDB Home
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Literature Citations<br />
Caughdenoy Dam Study, Oswego County, NY, D212290 – Term Agreement Assignment #6,<br />
TAMS Consultants, Inc. February, 1999.<br />
Cross <strong>Lake</strong> / Seneca River Flood Damage Reduction Measures, Final Detailed Project Report<br />
<strong>and</strong> Environmental Assessment, US Army Corps of Engineers, January 1999.<br />
Operational Audit <strong>for</strong> the New York State Canal System: Oswego River Basin, Baker Engineering,<br />
NY, September 1997.<br />
Review of Project Operation <strong>and</strong> Local Flooding, Federal Energy Regulatory Commission,<br />
Phoenix Hydroelectric Project FERC No. 4113, December 1996.<br />
<strong>Oneida</strong> <strong>Lake</strong>, Oswego <strong>and</strong> <strong>Oneida</strong> Counties, New York, Reconnaissance Report, Section 205 of<br />
the 1958 Flood Control Act, as amended, April 1989.<br />
<strong>Oneida</strong> <strong>Lake</strong>, Beach Road Flood Study, Town of Cicero, Onondaga County, New York,<br />
Calocerinos <strong>and</strong> Spina Consulting Engineers, October 1985.<br />
<strong>Oneida</strong> <strong>Lake</strong> N.Y. (Final Feasibility Report), Oswego River Basin, N.Y., <strong>Management</strong> Plan<br />
Analysis, US Army Corps of Engineers, January 1984.<br />
Preliminary Institutional Studies, Oswego River Watershed, New York, Volume 1, Main Report,<br />
Acres American Incorporated, (<strong>for</strong> Department of Army, Buffalo District, Corps of Engineers),<br />
December 1979.