29.12.2014 Views

part 1 of the african peace facility evaluation - European ...

part 1 of the african peace facility evaluation - European ...

part 1 of the african peace facility evaluation - European ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aiming at allowing a fast and effective response to this matter, I ask your approval for a systematic<br />

reduction to 5 working days <strong>of</strong> delay for <strong>the</strong> inter-service consultation, for all <strong>the</strong> decisions regarding<br />

<strong>the</strong> help to <strong>the</strong> Haitian state’.<br />

Regarding <strong>the</strong> communication system within ISC, all documents for <strong>the</strong> ISC are loaded in an on-line<br />

system called CIS-NET and an e-mail directly linked to <strong>the</strong> ISC is automatically sent to relevant<br />

services. EC <strong>of</strong>ficers comment and directly send <strong>the</strong> revised versions <strong>of</strong> <strong>the</strong> documents on-line. All <strong>the</strong><br />

documents are available 24/7 in <strong>the</strong> system, including supporting information and details <strong>of</strong> everyone<br />

involved in <strong>the</strong> exercise. Meetings are held only for fast-track ISC, when <strong>the</strong>re is no time to exchange<br />

comments in writing and wait for <strong>the</strong> answers.<br />

Regarding adoption by <strong>the</strong> College <strong>of</strong> Commissioners, a<strong>part</strong> from <strong>the</strong> written procedure used for APF<br />

decisions, EC legislation also provides for:<br />

‣ The empowerment procedure: one <strong>of</strong> <strong>the</strong> Commissioners is empowered by <strong>the</strong> College to<br />

adopt an individual decision (but <strong>the</strong> ACP envelope within EDF is not covered by this<br />

procedure);<br />

‣ The sub-delegation procedure: <strong>the</strong> Commissioner delegates authority to <strong>the</strong> Director General<br />

concerned.<br />

A change from <strong>the</strong> general written procedure to <strong>the</strong> empowerment or sub-delegation procedures (<strong>the</strong><br />

latter may only be used for decisions under €10m) would require an internal decision <strong>of</strong> <strong>the</strong> College <strong>of</strong><br />

Commissioners. For APF, special competence would concern <strong>the</strong> Commissioner for Development or<br />

DEVCO Director General.<br />

In any case, on November 21 st 2010, <strong>the</strong> College took <strong>the</strong> decision to apply <strong>the</strong> empowerment<br />

procedure as a general rule, unless decided o<strong>the</strong>rwise. This also means that no translation is needed<br />

and <strong>the</strong> procedure should save 5 working days: it should be applied to APF from now on. The<br />

<strong>evaluation</strong> commends this decision.<br />

ERM<br />

Every single APF contract (no matter how short) requires an EC financing decision, which normally<br />

requires a full clearance and approval process with 30 signatures. The <strong>evaluation</strong> considers this<br />

complexity might be reduced, and <strong>the</strong> ERM shows that this is possible, but it would require<br />

amendment to <strong>the</strong> current legal framework. The ERM can obtain clearance in 2 weeks, a remarkable<br />

improvement (but limited to small mediation-type missions not exceeding 6 months).<br />

According to most interlocutors, ERM has been innovative, and provides hope for fur<strong>the</strong>r flexibility in<br />

EDF procedures. The <strong>evaluation</strong> considers that <strong>the</strong> accelerated ERM procedures work well for <strong>the</strong><br />

purpose, as <strong>the</strong>y are quite fast and flexible.<br />

III.2.3<br />

DECISION-MAKING PROCEDURES IN ACCORDANCE WITH THE CURRENT EDF<br />

LEGAL FRAMEWORK<br />

EC-AU JOINT FORMULATION<br />

APF experience has shown that EC involvement with AU and RECs, including PSO expertise in<br />

military, policy and civilian interventions is needed at <strong>the</strong> request formulation level and should be<br />

formalised as <strong>part</strong> <strong>of</strong> <strong>the</strong> APF procedure.<br />

Page 31 <strong>of</strong> 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!