part 1 of the african peace facility evaluation - European ...
part 1 of the african peace facility evaluation - European ...
part 1 of the african peace facility evaluation - European ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
aiming at allowing a fast and effective response to this matter, I ask your approval for a systematic<br />
reduction to 5 working days <strong>of</strong> delay for <strong>the</strong> inter-service consultation, for all <strong>the</strong> decisions regarding<br />
<strong>the</strong> help to <strong>the</strong> Haitian state’.<br />
Regarding <strong>the</strong> communication system within ISC, all documents for <strong>the</strong> ISC are loaded in an on-line<br />
system called CIS-NET and an e-mail directly linked to <strong>the</strong> ISC is automatically sent to relevant<br />
services. EC <strong>of</strong>ficers comment and directly send <strong>the</strong> revised versions <strong>of</strong> <strong>the</strong> documents on-line. All <strong>the</strong><br />
documents are available 24/7 in <strong>the</strong> system, including supporting information and details <strong>of</strong> everyone<br />
involved in <strong>the</strong> exercise. Meetings are held only for fast-track ISC, when <strong>the</strong>re is no time to exchange<br />
comments in writing and wait for <strong>the</strong> answers.<br />
Regarding adoption by <strong>the</strong> College <strong>of</strong> Commissioners, a<strong>part</strong> from <strong>the</strong> written procedure used for APF<br />
decisions, EC legislation also provides for:<br />
‣ The empowerment procedure: one <strong>of</strong> <strong>the</strong> Commissioners is empowered by <strong>the</strong> College to<br />
adopt an individual decision (but <strong>the</strong> ACP envelope within EDF is not covered by this<br />
procedure);<br />
‣ The sub-delegation procedure: <strong>the</strong> Commissioner delegates authority to <strong>the</strong> Director General<br />
concerned.<br />
A change from <strong>the</strong> general written procedure to <strong>the</strong> empowerment or sub-delegation procedures (<strong>the</strong><br />
latter may only be used for decisions under €10m) would require an internal decision <strong>of</strong> <strong>the</strong> College <strong>of</strong><br />
Commissioners. For APF, special competence would concern <strong>the</strong> Commissioner for Development or<br />
DEVCO Director General.<br />
In any case, on November 21 st 2010, <strong>the</strong> College took <strong>the</strong> decision to apply <strong>the</strong> empowerment<br />
procedure as a general rule, unless decided o<strong>the</strong>rwise. This also means that no translation is needed<br />
and <strong>the</strong> procedure should save 5 working days: it should be applied to APF from now on. The<br />
<strong>evaluation</strong> commends this decision.<br />
ERM<br />
Every single APF contract (no matter how short) requires an EC financing decision, which normally<br />
requires a full clearance and approval process with 30 signatures. The <strong>evaluation</strong> considers this<br />
complexity might be reduced, and <strong>the</strong> ERM shows that this is possible, but it would require<br />
amendment to <strong>the</strong> current legal framework. The ERM can obtain clearance in 2 weeks, a remarkable<br />
improvement (but limited to small mediation-type missions not exceeding 6 months).<br />
According to most interlocutors, ERM has been innovative, and provides hope for fur<strong>the</strong>r flexibility in<br />
EDF procedures. The <strong>evaluation</strong> considers that <strong>the</strong> accelerated ERM procedures work well for <strong>the</strong><br />
purpose, as <strong>the</strong>y are quite fast and flexible.<br />
III.2.3<br />
DECISION-MAKING PROCEDURES IN ACCORDANCE WITH THE CURRENT EDF<br />
LEGAL FRAMEWORK<br />
EC-AU JOINT FORMULATION<br />
APF experience has shown that EC involvement with AU and RECs, including PSO expertise in<br />
military, policy and civilian interventions is needed at <strong>the</strong> request formulation level and should be<br />
formalised as <strong>part</strong> <strong>of</strong> <strong>the</strong> APF procedure.<br />
Page 31 <strong>of</strong> 49