<strong>SRK</strong> <strong>Consulting</strong>: Project No: 447122 MNC De-Bottlenecking Project Page 21<br />

Category<br />

Comments/issues raised by<br />

stakehol<strong>de</strong>rs<br />

Summarised response<br />

Noise<br />

Company Conduct<br />

and policy<br />

Socio-economic<br />

Stakehol<strong>de</strong>rs living close to the mine<br />

i<strong>de</strong>ntified noise coming from the<br />

mining operations as a serious<br />

problem.<br />

Stakehol<strong>de</strong>rs challenged MPM’s<br />

conduct in previous projects (in<br />

particular the Alchemy Project) as<br />

well as the integrity of the<br />

stakehol<strong>de</strong>r engagement process for<br />

the <strong>de</strong>-bottlenecking project.<br />

Concerns were expressed that<br />

comments and issues raised during<br />

the public meeting will not be<br />

addressed or sent through to<br />

authorities.<br />

Comments were received related to<br />

the high unemployment levels in the<br />

area and MPMs contribution to the<br />

socio-economic <strong>de</strong>velopment of the<br />

area.<br />

MPM does ensure that all machines<br />

working on the mine conforms to the<br />

DMR standards regarding noise<br />

levels and will continually look at<br />

minimising noise impacts from<br />

machines. The noise levels due to<br />

the <strong>de</strong>-bottlenecking project should<br />

not increase but it will be confirmed<br />

in the impact assessment phase.<br />

The comments received during the<br />

public meeting will be ma<strong>de</strong><br />

available in a Comment and<br />

Response Report format and<br />

distributed to the communities. It will<br />

also be inclu<strong>de</strong>d in the Draft<br />

EIA/EMP Amendment Report to be<br />

submitted to the Department of<br />

Mineral Resources (DMR), local<br />

communities and other commenting<br />

authorities.<br />

Local employment is one of MPM’s<br />

priorities. MPM employ local<br />

communities Local employment is<br />

one of MPM’s priorities. MPM<br />

employ unskilled labour in local<br />

communities through the labour<br />

<strong>de</strong>sk. The labour <strong>de</strong>sk employment<br />

process is controlled by the local<br />

communities. Skilled labour is<br />

advertised.<br />

5.5 Submission of Scoping Report to Authorities<br />

The Scoping Report was distributed to competent and commenting authorities and <strong>de</strong>tails are<br />

reflected in Table 8. (Issue receipts are attached in Appendix J). On 10 October 2012 the DMR<br />

approved the Scoping Report – see letter attached in Appendix K.<br />

Table 10: Submission of Scoping Report to Authorities<br />

Authority Date submitted Authority Date submitted<br />

DMR 29 August 2012 Waterberg District<br />

Municipality<br />

LEDET 29 August 2012 Mogalakwena Local<br />

Municipality<br />

4 September 2012<br />

29 August 2012<br />

ROTL/DEEL MNC De-Bottlenecking Project: Stakehol<strong>de</strong>r Engagement Report November 2012