For simplicity, this <strong>case</strong> study focuses on<br />

the construction and technical specifications<br />

(including sustainability features) <strong>for</strong> the <strong>Code</strong><br />

Level 3 and 6 units. However, the sections on<br />

scheme implementation and lessons learnt<br />

include in<strong>for</strong>mation on all five units. The<br />

technical specifications <strong>for</strong> all the units<br />

are available on the Miller Homes website:<br />

www.miller<strong>homes</strong>.co.<strong>uk</strong>/millerzero/<br />

CONSTRUCTION AND<br />

BUILD SYSTEM<br />

Despite the near identical appearance of the<br />

units, different construction and build systems<br />

were used on all the units. This included thin<br />

joint masonry <strong>for</strong> the <strong>Code</strong> Level 3 and 4 <strong>homes</strong>,<br />

structural insulted panels (SIPs) on the <strong>Code</strong><br />

Level 5 home and storey height aircrete panels<br />

<strong>for</strong> the <strong>Code</strong> Level 6 home. The specific<br />

construction and build systems <strong>for</strong> the <strong>Code</strong><br />

Level 3 and <strong>Code</strong> Level 6 <strong>homes</strong> are described<br />

in more detail below:<br />

<strong>Code</strong> Level 6: The new build unit has been<br />

constructed using storey height aircrete panels<br />

and 200mm of external wall insulation. The<br />

internal walls have been finished using wet<br />

plaster to improve airtightness. The whole unit<br />

has been externally rendered and in some<br />

places cedar cladding has been used.<br />

The floors were constructed 300mm thick<br />

aircrete pre-cast flooring system with 110mm<br />

thick urethane insulation and a screed finish.<br />

The unit has underfloor heating with the<br />

pipework laid in the screed finish. The first floor<br />

also has under floor heating within joist void.<br />

The mono- pitched roof was constructed using<br />

timber joists, with 280mm rigid urethane<br />

insulation with low emissivity foil insulation laid<br />

in three layers, as well an insulating plasterboard<br />

layer to the internal side of the roof construction.<br />

Biomass boiler supplying the <strong>Code</strong> Level 5<br />

and 6 <strong>homes</strong><br />

<strong>Code</strong> Level 3: The new build unit has been<br />

constructed using thin joint masonry walls<br />

containing a 90mm cavity which has been<br />

injected with glass mineral wool insulation,<br />

with the internal walls finished using standard<br />

plasterboard on dabs. The whole unit has been<br />

externally rendered and in some places cedar<br />

cladding has been used.<br />

The floors were constructed using beam<br />

and block pre-cast floor system, covered by a<br />

100mm thick polystyrene insulating board with<br />

a screed finish. The mono-pitched roof was<br />

constructed using timber joists, with 160mm<br />

rigid urethane insulation with low emissivity<br />

foil laid in two layers in order to achieve the<br />

required U-value.<br />

36 | CODE FOR SUSTAINABLE HOMES | CASE STUDY 8