Chapter 6: Reclaimed <strong>Water</strong><br />

2. All lines shall be thoroughly flushed through the blow-offs and/or hydrants provided in<br />

accordance with AWWA C600 for final acceptance by <strong>Loudoun</strong> <strong>Water</strong>. <strong>Water</strong> used will<br />

be estimated by <strong>Loudoun</strong> <strong>Water</strong> and its cost charged to the developer.<br />

3. <strong>Water</strong> pipes shall be tested by the procedure outlined in AWWA C600, with the exception<br />

that test pressure shall be conducted at 150 percent of normal operation pressure, as<br />

specified by <strong>Loudoun</strong> <strong>Water</strong>.<br />

4. <strong>Loudoun</strong> <strong>Water</strong> will sample for cleanliness and sterilization of the waterlines before<br />

permitting connection for service. Prior to disinfection, all waterlines shall be flushed<br />

unless the tablet method of disinfection is used. All valves and hydrants shall be operated<br />

during this operation. Flushing velocities should not be less than 2.5 feet per second.<br />

The sterilization will be in accordance with the latest revisions of AWWA Standard C651,<br />

Disinfecting <strong>Water</strong> Pipes. At least 2 consecutive (24-hour interval) satisfactory<br />

bacteriological samples, to be taken at regular intervals not to exceed 2,000 feet, must be<br />

obtained from the distribution system before the system can be placed into service.<br />

Corporation stops shall be provided for sterilization at location designated by <strong>Loudoun</strong><br />

<strong>Water</strong>.<br />

5. Continuity of tracer wires will be tested.<br />

6. Cathodic protection systems will be tested by a NACE Certified Engineer, and reports<br />

submitted in accordance with Appendix E of this <strong>Manual</strong>.<br />

7. Where potable water pipe is being converted of reclaimed water distribution, conduct dye<br />

test in accordance with <strong>Loudoun</strong> <strong>Water</strong>’s Cross Connection/Backflow Prevention<br />

Program.<br />

-- end of Chapter 6 --<br />

<strong>Engineering</strong> <strong>Design</strong> <strong>Manual</strong><br />

September 2010 89