submitted by the applicant to <strong>Loudoun</strong> <strong>Water</strong> for execution. Deeds and/or plats are not<br />

submitted directly to <strong>Loudoun</strong> <strong>Water</strong> until they have been approved by all parties and are<br />

ready for execution.<br />

1. Residential Subdivisions -- For residential subdivisions, easements are typically<br />

conveyed as part of the application for a subdivision record plat (SBRD), a subdivision<br />

waiver (SBWV), or a family subdivision (SBFM).<br />

2. Non-Residential Site Plans. -- For multi-family residential projects and nonresidential<br />

projects, easements are typically conveyed as part of an application for site<br />

plan (STPL), as an easement plat (ESMT), or as a dedication plat (DEDI).<br />

B. Deed Language for <strong>Loudoun</strong> <strong>Water</strong> Easements<br />

The required standard deed language that must be included in all instruments processed<br />

through the Signature Deed process may be found on the website.<br />

C. Execution Process<br />

1. Signature Deed Package<br />

The signature deed package should be submitted to the Department of Land Development<br />

Programs, and must contain the following items to ensure processing:<br />

a. a completed form titled Signature Deed Request and Checklist, which is available on<br />

the website;<br />

b. the original deed, with original signatures of all parties except <strong>Loudoun</strong> County and<br />

<strong>Loudoun</strong> <strong>Water</strong>;<br />

c. one copy of the approved plat, bearing the most recent revision date;<br />

d. one copy of the County Attorney’s letter approving the deed and plat as to form;<br />

e. one copy of the County Project Manager’s request for signature deeds. This may be a<br />

printed copy of an e-mail, but it must be included in the deed package.<br />

2. Final Review and Execution<br />

Applicants should allow a minimum of 5 working days for <strong>Loudoun</strong> <strong>Water</strong> to process<br />

signature deed packages.<br />

If inconsistencies are found during final review of the deed and/or plat, the applicant will be<br />

notified, and the package will be returned for the necessary revisions. The County Project<br />

Manager and <strong>Loudoun</strong> <strong>Water</strong> will determine whether additional referral review is required<br />

prior to resubmission of the signature deed package.<br />

Once the final review has been completed and the deed and plat determined to be accurate,<br />

the deed is forwarded to the General Manager’s office for execution. The original deed with<br />

plat will be returned to the applicant for recordation.<br />

<strong>Engineering</strong> <strong>Design</strong> <strong>Manual</strong>, Appendix C<br />

September 2010 Page 4 of 4