Engineering Design Manual - Loudoun Water
Engineering Design Manual - Loudoun Water
Engineering Design Manual - Loudoun Water
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TABLE OF CONTENTS<br />
PAGE<br />
Chapter 1: <strong>Loudoun</strong> <strong>Water</strong>’s Role................................................................ 1<br />
1.1 INTRODUCTION......................................................................................................................1<br />
A. Basis and Intent .............................................................................................................................1<br />
B. Limitations .....................................................................................................................................1<br />
C. Legal Authority.............................................................................................................................. 2<br />
D. Mission .......................................................................................................................................... 2<br />
E. Vision ............................................................................................................................................. 2<br />
1.2 SERVICE AREAS .................................................................................................................... 2<br />
A. Central System .............................................................................................................................. 3<br />
B. Community Systems ..................................................................................................................... 3<br />
C. Systems Not Belonging to <strong>Loudoun</strong> <strong>Water</strong> ................................................................................. 3<br />
D. Private Facilities............................................................................................................................ 3<br />
1.3 THE ENGINEERING DIVISION................................................................................................ 7<br />
1.4 POINTS OF CONTACT ............................................................................................................. 7<br />
1.5 PUBLIC INQUIRIES ................................................................................................................ 8<br />
1.6 CONNECTION PERMIT ........................................................................................................... 8<br />
A. Work Requiring <strong>Loudoun</strong> <strong>Water</strong>’s Connection Permit ..............................................................8<br />
B. Applying for a Connection Permit................................................................................................ 9<br />
C. Fees and Charges ........................................................................................................................ 10<br />
D. Installation and Inspections....................................................................................................... 12<br />
Chapter 2: Administration ........................................................................ 15<br />
2.1 EXTENSION OF PUBLIC FACILITIES .......................................................................................15<br />
2.2 OFFSITE FACILITIES.............................................................................................................15<br />
A. Construction by <strong>Loudoun</strong> <strong>Water</strong>.................................................................................................15<br />
B. Construction by Applicant.......................................................................................................... 16<br />
2.3 SPECIAL CONTRACTS............................................................................................................16<br />
2.4 SERVICE TO DEVELOPED COMMUNITIES...............................................................................16<br />
A. Direct Funding by Users ..............................................................................................................17<br />
B. Funding by a Public Body............................................................................................................17<br />
2.5 AGREEMENTS ......................................................................................................................17<br />
2.6 CONSTRUCTION PERMIT ......................................................................................................17<br />
2.7 PRECONSTRUCTION MEETING............................................................................................. 18<br />
2.8 PROGRESS MEETINGS ......................................................................................................... 18<br />
2.9 CONSTRUCTION .................................................................................................................. 18<br />
A. Notification.................................................................................................................................. 18<br />
B. Approved Construction Plans..................................................................................................... 18<br />
C. Protection of Existing Utilities ................................................................................................... 19<br />
D. Safety ........................................................................................................................................... 19<br />
E. Responsible Supervision............................................................................................................. 19<br />
F. Protection of New Work ............................................................................................................. 19<br />
G. Operations within VDOT Right of Way or Private Roadways .................................................. 19<br />
<strong>Engineering</strong> <strong>Design</strong> <strong>Manual</strong><br />
September 2010<br />
i