Chapter 9: Sewage Pumping Stations<br />
4-gas portable, rechargeable gas monitor (pHDPlus or equivalent with calibration kit)<br />
brass combination locks (4 number): 2-1/4” shank for gate (Model 175LH), and 1 for each<br />
hatch (Model 177)<br />
DBI Sala Safety Harness (fall protection) (DBI Sala Model No. 1107800, Size: Large,<br />
Quantitiy:2)<br />
face shields (ratchet headgear with crown extension and clear polycarbonate lens)<br />
fire extinguishers (suitable for electrical fires in control panels; include minimum of 1<br />
extinguisher per floor level)<br />
First Aid Kit, OSHA approved (1 per floor level)<br />
ear muff hearing protectors (2 per generator room with storage cabinet mounted outside<br />
generator room door)<br />
MSDS binder with applicable information (i.e. bioxide, fuel, oil, etc.)<br />
elbow length, acid resistant gloves (2 pair)<br />
any applicable specialty tools required for SPS maintenance/repair<br />
Lockout/Tagout Station/Center (center should include minimum of the following –<br />
Equipped with 6 locks, 25+ lockout tags and fasteners, 2-1.5” multi-lockout device, 2-<br />
single pole breaker lockouts, 1 small plug lockout, 1 large plug lockout, 2 wall switch<br />
lockouts)<br />
-- end of Chapter 9 --<br />