Chapter 3: Application and Plan Preparation<br />

3.1 Purpose<br />

Chapter 3: Application and Plan Preparation<br />

<strong>Loudoun</strong> <strong>Water</strong> reviews the construction plans for all projects that will extend its water,<br />

wastewater, or water reuse systems. Conformance to the procedures and standards outlined<br />

in this <strong>Manual</strong> will expedite the review process. This application and review process ensures<br />

that projects are built to conform to <strong>Loudoun</strong> <strong>Water</strong>’s standards.<br />

3.2 <strong>Loudoun</strong> County Planning and Land Development Referrals<br />

Prior to submission of construction plans and profiles to <strong>Loudoun</strong> <strong>Water</strong>, the corresponding<br />

land use application(s) must first be approved by <strong>Loudoun</strong> County. Such applications<br />

include rezoning, special exception, and preliminary plat of subdivision. <strong>Loudoun</strong> <strong>Water</strong><br />

participates in the County’s referral system as an outside agency. Review of the application<br />

typically results in the following responses from <strong>Loudoun</strong> <strong>Water</strong>.<br />

Comment is provided on general location and configuration of proposed water and sewer<br />

system.<br />

Need for special studies to determine feasibility of providing service is identified.<br />

Transmission mains, trunk sewers, and other facilities traversing or needed to serve the<br />

proposed development are identified.<br />

Areas for easement and/or line extensions necessary to provide access to water and sewer<br />

lines to adjacent properties are identified.<br />

3.3 Application Procedures<br />

The applicant is required to submit construction plans to <strong>Loudoun</strong> County, VDOT, etc. in<br />

accordance with the requirements of those agencies. <strong>Loudoun</strong> <strong>Water</strong>’s approval of<br />

construction plans requires a separate submittal from that made to other agencies. <strong>Loudoun</strong><br />

<strong>Water</strong>’s review occurs on an independent track.<br />

A. Initial Application<br />

Initial submission must include the following:<br />

1. Utility Extension Request Form (UER) found in Appendix A of this <strong>Manual</strong><br />

2. Review Fee<br />

3. CAD files as described in Section 3.6 of this Chapter<br />

4. construction plans – one full set<br />

<strong>Engineering</strong> <strong>Design</strong> <strong>Manual</strong><br />

September 2010 23