Engineering Design Manual - Loudoun Water
Engineering Design Manual - Loudoun Water
Engineering Design Manual - Loudoun Water
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TABLE OF CONTENTS<br />
PAGE<br />
5.6 PRETREATMENT ................................................................................................................. 64<br />
A. Definitions ...................................................................................................................................64<br />
B. Guidelines and Review Process for Interceptors and Reclamation Systems...........................65<br />
C. <strong>Design</strong> Requirements..................................................................................................................66<br />
D. Significant Industrial Users........................................................................................................67<br />
5.7 GRINDER PUMPS ................................................................................................................ 67<br />
A. Definitions and Conditions of Service........................................................................................67<br />
B. Installations to Meet <strong>Loudoun</strong> <strong>Water</strong> Intent and Policy Standards ........................................68<br />
C. <strong>Design</strong> Approval Required..........................................................................................................69<br />
D. Financial Considerations ............................................................................................................69<br />
E. Notice Provision and Covenants.................................................................................................70<br />
F. Laterals ........................................................................................................................................70<br />
5.8 INSTALLATION REQUIREMENTS ...........................................................................................71<br />
A. Excavation, Bedding and Backfill............................................................................................... 71<br />
B. Acceptance Tests .........................................................................................................................73<br />
Chapter 6: Reclaimed <strong>Water</strong> ..................................................................... 75<br />
6.1 SCOPE .................................................................................................................................75<br />
A. Intent............................................................................................................................................75<br />
B. Minimums ...................................................................................................................................75<br />
6.2 HYDRAULIC REQUIREMENTS ...............................................................................................75<br />
A. Capacity........................................................................................................................................75<br />
B. Distribution Piping......................................................................................................................76<br />
C. Hydraulic Models ........................................................................................................................76<br />
6.3 RECLAIMED WATERLINE LAYOUT ........................................................................................77<br />
A. Plan View ..................................................................................................................................... 77<br />
B. Profile...........................................................................................................................................79<br />
C. Easements................................................................................................................................... 80<br />
6.4 FLUSHING HYDRANTS..........................................................................................................81<br />
A. Plan View ..................................................................................................................................... 81<br />
B. Profile...........................................................................................................................................82<br />
6.5 SERVICE CONNECTIONS AND METERS ................................................................................. 82<br />
A. Reuse Service Connection...........................................................................................................82<br />
B. Reuse Meters ...............................................................................................................................83<br />
C. Sizing Reuse Meters ....................................................................................................................84<br />
6.6 CROSS CONNECTION AND BACKFLOW PREVENTION............................................................. 85<br />
6.7 IDENTIFICATION ................................................................................................................. 85<br />
A. Labeling and Marking of Underground Facilities .....................................................................85<br />
B. Labeling and Marking Above-Ground or Indoors.....................................................................86<br />
C. Conversion of Piping to Reclaimed Service ...............................................................................86<br />
6.8 INSTALLATION REQUIREMENTS .......................................................................................... 86<br />
A. Excavation, Bedding and Backfill...............................................................................................87<br />
B. Acceptance Tests ........................................................................................................................ 88<br />
<strong>Engineering</strong> <strong>Design</strong> <strong>Manual</strong><br />
September 2010<br />
iv