SIBER SPIS sept 2011.pdf - IMBER
SIBER SPIS sept 2011.pdf - IMBER
SIBER SPIS sept 2011.pdf - IMBER
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>SIBER</strong><br />
Science Plan and Implementation Strategy<br />
latter will include both fixed location devices, such as oceanographic moorings, and those on<br />
mobile platforms, such as ship of opportunity measurements, oceanographic (Argo) drifters<br />
and gliders.<br />
In terms of planning future field efforts, regions that have been the focus of a number of national<br />
and international efforts (such as the AS) and have proved to be of significant interest, will<br />
continue to provide data for synthesis and modeling. Other less studied regions (such as the<br />
BoB, the equatorial waters and the open ocean areas of the southern IO) should be the focus<br />
of future coordinated field efforts.<br />
69