Proactive Partnership Strategy - Global Road Safety Partnership
Proactive Partnership Strategy - Global Road Safety Partnership
Proactive Partnership Strategy - Global Road Safety Partnership
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2.6 Data Analysis<br />
With regard to quality of life issues in general and human life in particular, fatal<br />
and serious crashes are the most damaging in a community. They absorb an<br />
inordinate amount of community resources – human and financial.<br />
Activity<br />
Suggest any additional ways that<br />
data can be analyzed. Provide a<br />
rationale for any suggestion.<br />
The Data Analysis Team interrogates the data (Fatal and Serious Crashes<br />
plus other linked data) to primarily identify which are the local major risk<br />
factors (speed, alcohol, helmet use, restraint wearing, infrastructure, vehicle<br />
safety, trauma management). and then secondarily, all local main / relevant<br />
risk factors, that on an overall basis have led locally to fatalities or serious<br />
injuries, on a 30 days basis. Examples of all main / relevant risk factors are<br />
inadequate visibility, drug impaired driving, mobile phones, hazards from<br />
roadside objects.<br />
It is important not to analyze just the Police records, but also other linked<br />
data related to, for example, emergency services, and hospital data. All the<br />
captured data will then include items such as who is involved in each Fatal and<br />
Serious Crash (For example, pedestrians, drivers, motorcyclists, passengers,<br />
males, females, age group, driving experience). The Data Analysis Team then<br />
generates reports, including Risk Factor Tables, Graphs, FSC Maps and other<br />
information for the PPS Team.<br />
The analysis using “what happened, why, when, where and who” is necessary<br />
for the overall analysis / report.<br />
Once the data reports are shared and understood then programmes<br />
(directly linked to local key risk factors), projects and systems can be<br />
designed, developed and implemented to effectively target the local key risk<br />
factors, other local relevant / main risk factors, geographical locations and<br />
community groups.<br />
37 <strong>Proactive</strong> <strong>Partnership</strong> <strong>Strategy</strong>