-A3<br />
(vi)<br />
new slope features to be formed.<br />
(e)<br />
A Natural Terrain Hazard Assessment (NTHA) Report where a NTHA has been<br />
carried out. The NTHA Report shall detail the work carried out, and the findings<br />
and recommendations of the NTHA as stated in C.2(f) above. The Report shall<br />
contain all necessary photographs, tables, figures and drawings, including cross<br />
sections, to adequately illustrate the reasoning given in the text of the Report. 1n<br />
particular, the Report shall contain the following key drawings:<br />
(i)<br />
(ii)<br />
cross sections showing possible debris travel paths from the identified<br />
potential landslide source locations and boulder/rock fall locations along the<br />
route,<br />
Landslide and Boulder/Rockfall Hazard Maps at a scale of -:- AAA<br />
showing:<br />
• principal drainage courses, and all catchments and subcatchments<br />
affecting the route,<br />
• likely landslide sources,<br />
• likely boulder/rock fall locations,<br />
• debris flow paths from landslide sources with the likely limits of<br />
travel of debris,<br />
• boulder/rock fall trajectories with the likely limits of travel of<br />
boulder/rock falls.<br />
Larger scale drawings (e.g. -:5AA and -:2AA) shall be provided if particular areas<br />
of natural terrain require amplification.<br />
(f) A Geotechnical Assessment Report documenting the findings and<br />
recommendations of the work as stated in C.2(g) to C.2(n) above. The Report<br />
shall include plans and cross sections of preliminary design of the geotechnical<br />
works and hazard mitigation measures proposed for the project. 1t shall also<br />
highlight any matters in relation to the proposed geotechnical works and hazard<br />
mitigation measures, and diversion/ducting of services/utilities, that require<br />
further investigations or particular attention before or during the detailed design<br />
stage. The final Reports and Maps as stated in C.3(a) to C.3(e) above shall<br />
become the companion documents of the GA Report.<br />
C.. Programme of Implementation<br />
(a) The due date for commencement of the GA shall be .<br />
(b)<br />
A working programme, to be agreed with the Employer, shall be prepared within<br />
weeks of the commencement of the GA.<br />
(c) The due date for completion of the GA shall be .