-A3<br />

(vi)<br />

new slope features to be formed.<br />

(e)<br />

A Natural Terrain Hazard Assessment (NTHA) Report where a NTHA has been<br />

carried out. The NTHA Report shall detail the work carried out, and the findings<br />

and recommendations of the NTHA as stated in C.2(f) above. The Report shall<br />

contain all necessary photographs, tables, figures and drawings, including cross<br />

sections, to adequately illustrate the reasoning given in the text of the Report. 1n<br />

particular, the Report shall contain the following key drawings:<br />

(i)<br />

(ii)<br />

cross sections showing possible debris travel paths from the identified<br />

potential landslide source locations and boulder/rock fall locations along the<br />

route,<br />

Landslide and Boulder/Rockfall Hazard Maps at a scale of -:- AAA<br />

showing:<br />

• principal drainage courses, and all catchments and subcatchments<br />

affecting the route,<br />

• likely landslide sources,<br />

• likely boulder/rock fall locations,<br />

• debris flow paths from landslide sources with the likely limits of<br />

travel of debris,<br />

• boulder/rock fall trajectories with the likely limits of travel of<br />

boulder/rock falls.<br />

Larger scale drawings (e.g. -:5AA and -:2AA) shall be provided if particular areas<br />

of natural terrain require amplification.<br />

(f) A Geotechnical Assessment Report documenting the findings and<br />

recommendations of the work as stated in C.2(g) to C.2(n) above. The Report<br />

shall include plans and cross sections of preliminary design of the geotechnical<br />

works and hazard mitigation measures proposed for the project. 1t shall also<br />

highlight any matters in relation to the proposed geotechnical works and hazard<br />

mitigation measures, and diversion/ducting of services/utilities, that require<br />

further investigations or particular attention before or during the detailed design<br />

stage. The final Reports and Maps as stated in C.3(a) to C.3(e) above shall<br />

become the companion documents of the GA Report.<br />

C.. Programme of Implementation<br />

(a) The due date for commencement of the GA shall be .<br />

(b)<br />

A working programme, to be agreed with the Employer, shall be prepared within<br />

weeks of the commencement of the GA.<br />

(c) The due date for completion of the GA shall be .