-A5<br />

Notes: (1) The above programme for GA is prepared for a proposed new road approximately 1 km long, with a<br />

study area comprising approximately 40 hectares of natural terrain.<br />

(2) The NTHA may be carried out separately.<br />

(3) The programme for GI is indicative.<br />

(4) Additional time may be required for checking land status and obtaining access permission for carrying<br />

out GI works.<br />

Figure Cl Example of a Programme for the Geotechnical Assessment of a <strong>Highway</strong> Project