95<br />

may affect the proposed highway corridor(s)/alignment(s) and liaise with<br />

the highway engineers on improvements to the corridor(s)/alignment(s), if<br />

necessary,<br />

(ii)<br />

(iii)<br />

identify any specific contractual or construction management issues<br />

related to the likely geotechnical works and hazard mitigation measures<br />

(e.g. contract form, supervision, design review, traffic constraints and<br />

safety of road users, blasting control, access provision, etc.), and<br />

provide preliminary estimates of the costs, programming and geotechnical<br />

personnel requirements for the investigation, design and construction of<br />

the geotechnical works and hazard mitigation measures and preliminary<br />

estimates of the recurrent maintenance requirements.<br />

(f)<br />

For road improvement projects:<br />

(i)<br />

(ii)<br />

(iii)<br />

determine the safety standard for all of the existing man-made slope<br />

features based on the anticipated use of the highway,<br />

determine the date of construction of the features where possible and<br />

check records to determine whether there is documentary evidence to<br />

confirm if their stability is up to current safety standard, and<br />

outline the necessary investigation and assessment of the stability and/or<br />

the likely landslide preventive works required to upgrade the features to<br />

the current safety standard.<br />

(g)<br />

Based on the available information:<br />

(i)<br />

(ii)<br />

rank the alternative corridors/alignments based on the magnitude of the<br />

geotechnical hazards present along each proposed corridor/alignment, and<br />

recommend the appropriate rating to be used for the geotechnical factors<br />

in the overall highway corridor/alignment evaluation process.<br />

B.3 Deliverables<br />

The Consultants shall produce:<br />

(a)<br />

A Geotechnical Review Report documenting the work done, the information<br />

examined, the findings and recommendations, and including schematic plans and<br />

cross sections at critical locations of the geotechnical works and hazard<br />

mitigation measures proposed for the project. The GR Report shall include:<br />

(i) a Geotechnical Feature and Hazard Map at a scale of 1:1 000 or 1:5 000,<br />

showing the corridor(s)/alignment(s) considered and all catchments, the<br />

source and areal extent of all geotechnical hazards identified, the locations