17.01.2015 Views

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

GAS PRESSURE REQUIREMENTS<br />

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

Product Update: Legend Boilers LB/LW-1000<br />

The field repair kit for Legend 1 MBH has been released. This kit is not only<br />

recommended for units experiencing hard starts, but is also recommended for units<br />

with periodic lock-out problems.<br />

Spacer Kit At Includes:<br />

• Burner Spacer Assembly<br />

• Revised Air Shutter<br />

• Blower Support Bracket<br />

• Gas Line Shim<br />

• Instructions<br />

After Burner Spacer Kit has been installed. The service agent needs to repeat the<br />

start-up procedures.<br />

• Blower pressure should be set between 4.5" and 5" w.c.<br />

• Gas manifold pressure should be set between 3" w.c. and 3.5" w.c.<br />

• CO 2 readings should be:<br />

8.0 to 9.5% for Natural Gas<br />

8.5 to 10.0% for Propane<br />

Ref: Operation information table on page 19.<br />

The supply gas pressure is measured at the tap indicated. This reading must be<br />

measured with ‘flowing’ gas.<br />

The manifold gas pressure is measured at the manifold pressure tap as indicated.<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

11<br />

Service Workbook<br />

Training Department<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

69<br />

Service Workbook<br />

Training Department

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!