17.01.2015 Views

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

BLOWER TEST<br />

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

RELAY 3R (24 VAC SPDT) CHECK<br />

TERMINAL 2<br />

Dia Scan-Interface<br />

o o o o o o<br />

o<br />

X<br />

o o o o o<br />

(1R)<br />

X<br />

X<br />

1 2<br />

3 4<br />

X<br />

X<br />

0 1<br />

2 4 6 8<br />

X X X X<br />

0<br />

X<br />

1 2<br />

3 4<br />

5 6<br />

5 6<br />

X<br />

X<br />

7 8<br />

7 8<br />

X<br />

X<br />

0<br />

(2R)<br />

10A<br />

(3R)<br />

X<br />

X<br />

X<br />

0<br />

YELLOW<br />

0<br />

2A<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

X<br />

X<br />

X<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

X<br />

TERMINAL 3<br />

X<br />

10<br />

RAM HSI Control<br />

LW/LB - 1000<br />

9 8 7 6 5 4 3 2 1<br />

1. Inducer<br />

2. Ignitor - 1<br />

3. 120V - Hot<br />

4. 120V - RTN<br />

5. Ignitor - 2<br />

6. Ground<br />

7. Valve<br />

8. Pressure SW<br />

9. Thermostat<br />

10. 24 Vac Hot<br />

X<br />

Dia Scan-Interface<br />

o o o o o o<br />

X<br />

o<br />

X<br />

o o o o o X<br />

(1R) X<br />

X<br />

X<br />

0 1<br />

X<br />

2 4 6 8<br />

X X X X<br />

0<br />

0<br />

X<br />

X<br />

1 2<br />

3 4<br />

5 6<br />

7<br />

X 8<br />

BLACK<br />

1 2<br />

3 4<br />

5 6<br />

7 X 8<br />

X<br />

X<br />

(2R) 0 (3R) 0<br />

10A<br />

2A<br />

TERMINAL 5<br />

GROUND<br />

Ref: Page 58 Wiring Diagram<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

X<br />

X<br />

X<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

X<br />

X<br />

10<br />

RAM HSI Control<br />

LW/LB - 1000<br />

9 8 7 6 5 4 3 2 1<br />

1. Inducer<br />

2. Ignitor - 1<br />

3. 120V - Hot<br />

4. 120V - RTN<br />

5. Ignitor - 2<br />

6. Ground<br />

7. Valve<br />

8. Pressure SW<br />

9. Thermostat<br />

10. 24 Vac Hot<br />

X<br />

S<br />

T<br />

E<br />

P<br />

RESULTS<br />

15<br />

Blower Test<br />

Blower should be running at full RPM<br />

If the:<br />

then<br />

blower is not operating • check blower wiring to 2R<br />

terminal 2 and white wire to<br />

terminal 3 of upper terminal<br />

strip.<br />

• replace blower.<br />

blower is operating correctly go to Step 16.<br />

During 20 Second Proving Period<br />

Ignitor Is Heating<br />

S<br />

T<br />

E<br />

P<br />

25a<br />

LW/LB<br />

1000<br />

RESULTS<br />

Relay 3R (24 VAC SPDT) Check<br />

Test for 120 VAC 3R relay terminal 5 to ground.<br />

If the meter:<br />

then<br />

does not read 120 VAC<br />

check wiring to HSI control<br />

terminal 2.<br />

does read 120 VAC go to Step 25b.<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

34<br />

Service Workbook<br />

Training Department<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

47<br />

Service Workbook<br />

Training Department

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!