Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
LEGEND HEATERS<br />
SERVICE WORKBOOK<br />
BLOWER TEST<br />
LEGEND HEATERS<br />
SERVICE WORKBOOK<br />
RELAY 3R (24 VAC SPDT) CHECK<br />
TERMINAL 2<br />
Dia Scan-Interface<br />
o o o o o o<br />
o<br />
X<br />
o o o o o<br />
(1R)<br />
X<br />
X<br />
1 2<br />
3 4<br />
X<br />
X<br />
0 1<br />
2 4 6 8<br />
X X X X<br />
0<br />
X<br />
1 2<br />
3 4<br />
5 6<br />
5 6<br />
X<br />
X<br />
7 8<br />
7 8<br />
X<br />
X<br />
0<br />
(2R)<br />
10A<br />
(3R)<br />
X<br />
X<br />
X<br />
0<br />
YELLOW<br />
0<br />
2A<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
X<br />
X<br />
X<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
X<br />
TERMINAL 3<br />
X<br />
10<br />
RAM HSI Control<br />
LW/LB - 1000<br />
9 8 7 6 5 4 3 2 1<br />
1. Inducer<br />
2. Ignitor - 1<br />
3. 120V - Hot<br />
4. 120V - RTN<br />
5. Ignitor - 2<br />
6. Ground<br />
7. Valve<br />
8. Pressure SW<br />
9. Thermostat<br />
10. 24 Vac Hot<br />
X<br />
Dia Scan-Interface<br />
o o o o o o<br />
X<br />
o<br />
X<br />
o o o o o X<br />
(1R) X<br />
X<br />
X<br />
0 1<br />
X<br />
2 4 6 8<br />
X X X X<br />
0<br />
0<br />
X<br />
X<br />
1 2<br />
3 4<br />
5 6<br />
7<br />
X 8<br />
BLACK<br />
1 2<br />
3 4<br />
5 6<br />
7 X 8<br />
X<br />
X<br />
(2R) 0 (3R) 0<br />
10A<br />
2A<br />
TERMINAL 5<br />
GROUND<br />
Ref: Page 58 Wiring Diagram<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
X<br />
X<br />
X<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
X<br />
X<br />
10<br />
RAM HSI Control<br />
LW/LB - 1000<br />
9 8 7 6 5 4 3 2 1<br />
1. Inducer<br />
2. Ignitor - 1<br />
3. 120V - Hot<br />
4. 120V - RTN<br />
5. Ignitor - 2<br />
6. Ground<br />
7. Valve<br />
8. Pressure SW<br />
9. Thermostat<br />
10. 24 Vac Hot<br />
X<br />
S<br />
T<br />
E<br />
P<br />
RESULTS<br />
15<br />
Blower Test<br />
Blower should be running at full RPM<br />
If the:<br />
then<br />
blower is not operating • check blower wiring to 2R<br />
terminal 2 and white wire to<br />
terminal 3 of upper terminal<br />
strip.<br />
• replace blower.<br />
blower is operating correctly go to Step 16.<br />
During 20 Second Proving Period<br />
Ignitor Is Heating<br />
S<br />
T<br />
E<br />
P<br />
25a<br />
LW/LB<br />
1000<br />
RESULTS<br />
Relay 3R (24 VAC SPDT) Check<br />
Test for 120 VAC 3R relay terminal 5 to ground.<br />
If the meter:<br />
then<br />
does not read 120 VAC<br />
check wiring to HSI control<br />
terminal 2.<br />
does read 120 VAC go to Step 25b.<br />
A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />
Irving, Texas © 1997<br />
34<br />
Service Workbook<br />
Training Department<br />
A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />
Irving, Texas © 1997<br />
47<br />
Service Workbook<br />
Training Department