17.01.2015 Views

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

HIGH LIMIT SWITCH TEST<br />

2R (120V SPDT) RELAY TERM 4 CHECK<br />

S<br />

T<br />

E<br />

P<br />

17<br />

High Limit Switch Test<br />

Control should be set at least 30° higher than the tank temperature<br />

control setting.<br />

Test for 24 VAC from each high limit terminal to ground.<br />

Ignition Proving Period<br />

RESULTS<br />

If the meter: and you are then<br />

does not read 24 VAC either<br />

check wire<br />

terminal to ground<br />

connection to yellow<br />

does read 24 VAC to only one<br />

terminal<br />

does read 24 VAC from each<br />

terminal to ground<br />

certain that the control is<br />

calling for heat and the<br />

reset button has been<br />

pushed<br />

flow switch terminal.<br />

replace control.<br />

go to step 18.<br />

S<br />

T<br />

E<br />

P<br />

24b<br />

LW/LB<br />

500 &<br />

750<br />

RESULTS<br />

2R (SPDT) Relay Term 4 Check<br />

Test for 120 VAC 2R relay terminal 4 to ground.<br />

If the meter:<br />

then<br />

does not read 120 VAC,<br />

replace 2R relay.<br />

does read 120 VAC, go to Step 24c.<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

36<br />

Service Workbook<br />

Training Department<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

45<br />

Service Workbook<br />

Training Department

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!