17.01.2015 Views

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

S T E P 1 - AO Smith Water Heaters

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

2R RELAY TEST – SUPPLY POWER<br />

LEGEND HEATERS<br />

SERVICE WORKBOOK<br />

2R RELAY (120V SPDT) TERMINAL 4 CHECK<br />

Ref. Wiring Diagrams Pages 57 and 58.<br />

S<br />

T<br />

E<br />

P<br />

Test of 2R (120V SPDT) Relay (Located in junction box<br />

with Rheostat on 500 and 750 model heaters. Located<br />

in the large electrical box on the 1000 models.)<br />

13 Test for 120 VAC from Terminal 6 to Ground.<br />

TERMINAL 4<br />

GROUND<br />

During 20 Second Proving Period<br />

Ignitor is Heating-Blower is at Slow Speed<br />

S<br />

T<br />

E<br />

P<br />

25c<br />

LW/LB<br />

1000<br />

only<br />

o o o o o o<br />

o<br />

X<br />

o o o o o<br />

(1R)<br />

X<br />

X<br />

1 2<br />

3 4<br />

5 6<br />

7<br />

X 8<br />

X<br />

(2R)<br />

Dia Scan-Interface<br />

X<br />

X<br />

0 1<br />

2 4 6 8<br />

X X X X<br />

0<br />

0<br />

10A<br />

X<br />

1 2<br />

3 4<br />

5 6<br />

7 X 8<br />

X<br />

(3R)<br />

X<br />

X<br />

X<br />

0<br />

YELLOW<br />

0<br />

2A<br />

2R Relay (120V SPDT) Terminal 4 Check<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

X<br />

X<br />

X<br />

X<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

Test for 120 VAC between 2R (120V SPDT) relay terminal 4 and<br />

ground.<br />

X<br />

10<br />

RAM HSI Control<br />

LW/LB - 1000<br />

9 8 7 6 5 4 3 2 1<br />

1. Inducer<br />

2. Ignitor - 1<br />

3. 120V - Hot<br />

4. 120V - RTN<br />

5. Ignitor - 2<br />

6. Ground<br />

7. Valve<br />

8. Pressure SW<br />

9. Thermostat<br />

10. 24 Vac Hot<br />

X<br />

RESULTS<br />

If the meter:<br />

then<br />

does not read 120 VAC<br />

check wire connections<br />

between terminal 6 on 1R<br />

relay and terminal 6 on 2R<br />

relay.<br />

does read 120 VAC go to Step 14.<br />

RESULTS<br />

If the: and then<br />

blower does not read 120 VAC the wiring replace the 2R relay.<br />

does read 120 VAC<br />

connection from<br />

the blower red<br />

wire to 2R relay<br />

term 4 is correct go to Step 25d.<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

32<br />

Service Workbook<br />

Training Department<br />

A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />

Irving, Texas © 1997<br />

49<br />

Service Workbook<br />

Training Department

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!