Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
LEGEND HEATERS<br />
SERVICE WORKBOOK<br />
2R RELAY TEST – SUPPLY POWER<br />
LEGEND HEATERS<br />
SERVICE WORKBOOK<br />
2R RELAY (120V SPDT) TERMINAL 4 CHECK<br />
Ref. Wiring Diagrams Pages 57 and 58.<br />
S<br />
T<br />
E<br />
P<br />
Test of 2R (120V SPDT) Relay (Located in junction box<br />
with Rheostat on 500 and 750 model heaters. Located<br />
in the large electrical box on the 1000 models.)<br />
13 Test for 120 VAC from Terminal 6 to Ground.<br />
TERMINAL 4<br />
GROUND<br />
During 20 Second Proving Period<br />
Ignitor is Heating-Blower is at Slow Speed<br />
S<br />
T<br />
E<br />
P<br />
25c<br />
LW/LB<br />
1000<br />
only<br />
o o o o o o<br />
o<br />
X<br />
o o o o o<br />
(1R)<br />
X<br />
X<br />
1 2<br />
3 4<br />
5 6<br />
7<br />
X 8<br />
X<br />
(2R)<br />
Dia Scan-Interface<br />
X<br />
X<br />
0 1<br />
2 4 6 8<br />
X X X X<br />
0<br />
0<br />
10A<br />
X<br />
1 2<br />
3 4<br />
5 6<br />
7 X 8<br />
X<br />
(3R)<br />
X<br />
X<br />
X<br />
0<br />
YELLOW<br />
0<br />
2A<br />
2R Relay (120V SPDT) Terminal 4 Check<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
X<br />
X<br />
X<br />
X<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
Test for 120 VAC between 2R (120V SPDT) relay terminal 4 and<br />
ground.<br />
X<br />
10<br />
RAM HSI Control<br />
LW/LB - 1000<br />
9 8 7 6 5 4 3 2 1<br />
1. Inducer<br />
2. Ignitor - 1<br />
3. 120V - Hot<br />
4. 120V - RTN<br />
5. Ignitor - 2<br />
6. Ground<br />
7. Valve<br />
8. Pressure SW<br />
9. Thermostat<br />
10. 24 Vac Hot<br />
X<br />
RESULTS<br />
If the meter:<br />
then<br />
does not read 120 VAC<br />
check wire connections<br />
between terminal 6 on 1R<br />
relay and terminal 6 on 2R<br />
relay.<br />
does read 120 VAC go to Step 14.<br />
RESULTS<br />
If the: and then<br />
blower does not read 120 VAC the wiring replace the 2R relay.<br />
does read 120 VAC<br />
connection from<br />
the blower red<br />
wire to 2R relay<br />
term 4 is correct go to Step 25d.<br />
A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />
Irving, Texas © 1997<br />
32<br />
Service Workbook<br />
Training Department<br />
A.O. <strong>Smith</strong> <strong>Water</strong> Products Co.<br />
Irving, Texas © 1997<br />
49<br />
Service Workbook<br />
Training Department