20.01.2015 Views

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 3<br />

Responsibilities of the FFD and Stakeholders<br />

3.1 General<br />

<strong>Flood</strong> management is a multifunctional process involving organization. The stakeholders, which<br />

play major role in the flood management , is PIDA , WAPDA, provincial relief organization,<br />

Pakistan Army, NDMA, PCIW, Emergency Relief Cell, FFC and FFD. Proper understanding of<br />

functions of these organizations is briefly described below.<br />

3.2 Responsibilities of <strong>Flood</strong> <strong>Forecasting</strong> Division (FFD)<br />

FFD of the Pakistan Meteorological Department plays a pivotal role in the entire flood mitigation<br />

process. Hydro meteorological data from the various national and international sources is received<br />

in this office which is then processed to produce flood <strong>for</strong>ecasts and warnings to be disseminated<br />

outwards to various national organizations (Annex-9)<br />

Major actions required to be taken by the FFD be<strong>for</strong>e, during and after the flood season are<br />

summarized below.<br />

<strong>Flood</strong> preparatory Measures<br />

I )<br />

Ensure serviceability of the meteorological equipment including QPM Radars Lahore,<br />

Mangla and Sialkot, Teleprinter network, FAX, APT& Internet.<br />

Ii )<br />

Ensure availability of the following items in sufficient to last <strong>for</strong> the whole of flood season:<br />

Surface and upper air meteorological charts, isohyetal maps, various <strong>for</strong>ecast <strong>for</strong>ms, data<br />

tabulation sheets stationery etc.<br />

Iii )<br />

Iv )<br />

Update the calibration of the radar and flood <strong>for</strong>ecasting models<br />

Ensure availability of sufficient staff strength to maintain round the clock roster of duties<br />

<strong>for</strong> the meteorological and hydrological work.<br />

c:\documents and settings\administrator\desktop\cd material nust\international training workshop\session 5\2_sop pmd_51 pages.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!