SOP for Flood Forecasting & Early Warning - UNESCO Islamabad
SOP for Flood Forecasting & Early Warning - UNESCO Islamabad
SOP for Flood Forecasting & Early Warning - UNESCO Islamabad
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
placed in the <strong>for</strong>ecasts issued by Chief Met FFD and under no circumstances the <strong>for</strong>ecast<br />
issued by him allowed to be amended without his consent. This is because the flood<br />
<strong>for</strong>ecasting is the sole prerogative of the Chief Met FFD and no one else in the present setup<br />
has the necessary technical means or the know-how to make any change.<br />
Under a serious pre-flood situation Chief Meteorologist FFD may invite director <strong>Flood</strong>s of<br />
irrigation Department, Chief Engineer (H & WM) of WPADA and necessary flood related<br />
actions. Additionally, daily press briefings may be commenced in consultation with the<br />
Relief Commissioner Punjab.<br />
In case of category-III flood situation a <strong>for</strong>ecast of PMF in respect of Mangla / Tarbela be<br />
issued in yes/ no terms and Member (water) WAPDA be personally in<strong>for</strong>med of it by Chief<br />
Meteorologist, FFD Lahore.<br />
3.3 Stakeholders<br />
3.3.1 Provincial Irrigation and Drainage Authority (PIDA)<br />
PIDA plays a front line role in the process of flood <strong>for</strong>ecasting as well as flood mitigation.<br />
Major flood related functions include.<br />
I )<br />
Ii )<br />
Iii )<br />
Iv )<br />
Flow measurements at the specific sites at rivers , canals and nullahs<br />
Planning , design construction and maintenance of flood protection works.<br />
Maintenance of data communication network to provide the river flow data to FFD.<br />
Supervision of the flood warning center ( on behalf of Relief Commissioner ) to<br />
ensure timely dissemination of the flood <strong>for</strong>ecasts / warning.<br />
Vi )<br />
Occasional updating of the divisional flood fighting plans and execution of such<br />
plans during flood emergency.<br />
Vii )<br />
Implementation of the divisional flood fighting plan and ezxecution of such plans<br />
during flood emergency.<br />
3.3.2 National Disaster Management Authority ( NDMA)<br />
c:\documents and settings\administrator\desktop\cd material nust\international training workshop\session 5\2_sop pmd_51 pages.doc