20.01.2015 Views

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V )<br />

Liaison with PTC’s Coordination officer provide 24 hours maintenance services <strong>for</strong> the<br />

teleprinters, Internet & the office and residential telephones of all the flood related<br />

functionaries.<br />

Vi ) Conduct a familiarization training of the senior cadre and junior cadre government ,<br />

functionaries actively involved in the process of flood mitigation. Senior cadre training<br />

may be limited to one day only and must include such functionaries as the Relief<br />

Commissioner, Director General ( Relief) , Chief Engineer, Hydrology WAPDA, Chief<br />

Engineer FFC , Chief Engineer, Hydrology and drainage PIDA, Director <strong>Flood</strong> PIDA ,<br />

Director PDMA.<br />

Training <strong>for</strong> the junior cadrs may extend to a period of one week <strong>for</strong> the persons from<br />

various provincial and federal departments actually posted on flood duties.<br />

3.2.1 Functions during the <strong>Flood</strong> Season<br />

Chief Met, FFD is personally responsible <strong>for</strong> the issuance of timely and reliable flood<br />

<strong>for</strong>ecast/warning to af<strong>for</strong>d pre-flood imitation measures to reduce damage to the life and<br />

property due to floods. He is required to remain in touch with his office even outside the<br />

working hours to maintain a close watch on the flood generating weather situations. In case<br />

situation <strong>for</strong> Category-II or category-III floods develop he is to give advance verbal<br />

briefings to R.C. Punjab, Chairman FFC, DG Engineers ( Army), DG Met, Chairman<br />

NDMA and Member (water) WAPDA. Such briefings should be over and above the<br />

written qualitative <strong>for</strong>ecasts issued when the approaching monsoon low/ depressions draws<br />

closer. In order to avoid undue public panic, flood <strong>for</strong>ecasts to the public should be given,<br />

only when the possibility of floods has positively developed, in which case suitably tailored<br />

flood <strong>for</strong>ecast must be provided to the press and the electronic media in time. The benefit<br />

of the improved flood <strong>for</strong>ecasting system must reach the public by way of more reliable<br />

and more advance flood in<strong>for</strong>mation to them. It is also important that the necessary trust be<br />

c:\documents and settings\administrator\desktop\cd material nust\international training workshop\session 5\2_sop pmd_51 pages.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!