SOP for Flood Forecasting & Early Warning - UNESCO Islamabad
SOP for Flood Forecasting & Early Warning - UNESCO Islamabad
SOP for Flood Forecasting & Early Warning - UNESCO Islamabad
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FLOOD ROUTING THROUGH MANGLA RESERVOIR<br />
(CATEGORY-I FLOODS)<br />
2 TO 5 LAC CFS<br />
Annexture -5A<br />
1. <strong>Flood</strong> built up confirmation at EL 1202 feet<br />
2. Balance inflow, outflow upto high flood limit 150,000 cfs<br />
3. Watch till elevation rises to 1203 feet<br />
4. If inflow still rising increase outflow to 250,000 cfs<br />
5. Watch till elevation rises to 1204 feet<br />
6. if inflow still rising increase outflow to 300,000 cfs<br />
7. Watch till elevation rises to 1205 feet<br />
8. If inflow still rising increase outflow to 300,000 cfs<br />
9. Watch till elevation rises to 1206 feet<br />
10. If inflow still rising increase outflow to 300,000 cfs<br />
11. If reservoir level still rising with: Continue same outflow and<br />
a) Evidence of still rising with: then start reducing gradually<br />
as the situation permits.<br />
b) Evidenc4 of further flood buildup Open the main spillway to cater <strong>for</strong> inflow /<br />
outflow<br />
Note:<br />
<strong>Flood</strong> warning station data and FFD <strong>for</strong>ecast shall be kept in view all the time. As soon as inflow hydrograph recession<br />
is confirmed the outflows should be reduced gradually <strong>for</strong> downstream relief, subject to the safety of the project.<br />
c:\documents and settings\administrator\desktop\cd material nust\international training workshop\session 5\2_sop pmd_51 pages.doc