20.01.2015 Views

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SOP for Flood Forecasting & Early Warning - UNESCO Islamabad

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FLOOD ROUTING THROUGH MANGLA RESERVOIR<br />

(CATEGORY-I FLOODS)<br />

2 TO 5 LAC CFS<br />

Annexture -5A<br />

1. <strong>Flood</strong> built up confirmation at EL 1202 feet<br />

2. Balance inflow, outflow upto high flood limit 150,000 cfs<br />

3. Watch till elevation rises to 1203 feet<br />

4. If inflow still rising increase outflow to 250,000 cfs<br />

5. Watch till elevation rises to 1204 feet<br />

6. if inflow still rising increase outflow to 300,000 cfs<br />

7. Watch till elevation rises to 1205 feet<br />

8. If inflow still rising increase outflow to 300,000 cfs<br />

9. Watch till elevation rises to 1206 feet<br />

10. If inflow still rising increase outflow to 300,000 cfs<br />

11. If reservoir level still rising with: Continue same outflow and<br />

a) Evidence of still rising with: then start reducing gradually<br />

as the situation permits.<br />

b) Evidenc4 of further flood buildup Open the main spillway to cater <strong>for</strong> inflow /<br />

outflow<br />

Note:<br />

<strong>Flood</strong> warning station data and FFD <strong>for</strong>ecast shall be kept in view all the time. As soon as inflow hydrograph recession<br />

is confirmed the outflows should be reduced gradually <strong>for</strong> downstream relief, subject to the safety of the project.<br />

c:\documents and settings\administrator\desktop\cd material nust\international training workshop\session 5\2_sop pmd_51 pages.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!