Thus the state has developed a fairly strong experience base for accomplishing Cadastral<br />

Survey through ETS. At this point in time we have ample technically equipped survey<br />

staff who are second to none to any <strong>of</strong> such pr<strong>of</strong>essionals throughout the world.<br />

The progress achieved in the Survey till date is reflected as<br />

• Total Villages 7055<br />

• Villages Surveyed 2317<br />

• Percentage completed 33%<br />

ETS Survey and Integrated <strong>Land</strong> Record Database<br />

The construction <strong>of</strong> integrated Digitized <strong>Land</strong> Records database can be bracketed under<br />

three headings.<br />

<br />

<br />

<br />

Pre-Survey preparation (preliminary Settlement work)<br />

Field Survey/Measurement<br />

One after the Physical measurement.<br />

I. Pre-Survey work:<br />

Physical survey cannot be started until some basic information is<br />

prepared/updated. The Settlement organization has prepared and issued a set <strong>of</strong><br />

detailed guidelines in this regard. A logical analysis for the purpose <strong>of</strong> this<br />

document is given as;<br />

1. Tasdeeq Tamheedi:-<br />

NIC,Deity,MCIT,GOI DOLR,MORD,GOI 71