Table 2 - Department of Land Resources
Table 2 - Department of Land Resources
Table 2 - Department of Land Resources
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
II. Physical Measurement:<br />
1. Identify a permanent land mark in a village to fix the Basic Station<br />
with feeding into the ETS arbitrary coordinate origin (1000<br />
Easting,1000 Northing).<br />
2. Monumentation <strong>of</strong> the Basic Station with stone pillar dug down into<br />
the earth . A unique ID designate to the village is embossed on to the<br />
stone monumentation. Specification <strong>of</strong> the Stone Pillar given at para<br />
4.<br />
3. Sighting/ Shooting <strong>of</strong> a reference station at a distance <strong>of</strong> at least 100<br />
meters from the basic Station towards North. Back sighting <strong>of</strong> the<br />
basic station from the reference station to freeze the permanent<br />
reference Co-ordinates.<br />
4. Monumentation <strong>of</strong> the Reference station with the Stone pillar <strong>of</strong><br />
specification 3’-6’’ with 1’ width from all three sides. 1’<strong>of</strong> the pillar is<br />
kept above the ground and rest is dug into the earth<br />
5. Shooting <strong>of</strong> the traverse station throughout the village taking a longest<br />
possible route rounding up and closing the circuit at the basic Station.<br />
This closed circuit traverse minimizes the chance <strong>of</strong> any overlapping<br />
or shooting <strong>of</strong> wrong co-ordinates <strong>of</strong> the plot vertices.<br />
6. Shooting <strong>of</strong> the polygon from the traverse Stations on the basic<br />
traverse line already established.<br />
7. Downloading <strong>of</strong> field collected coordinate data in the computer centers<br />
after regular intervals.<br />
NIC,Deity,MCIT,GOI DOLR,MORD,GOI 73