Challenges and alternatives<br />

1. The principal difficulty projected by the above given study <strong>of</strong> the sample data <strong>of</strong><br />

449 number <strong>of</strong> villages seems to the time for completion <strong>of</strong> digitization <strong>of</strong> (Spatial and<br />

non-Spatial)data. The time for completion <strong>of</strong> each khasra (Spatial & Non-Spatial) which<br />

comes to is @ 4.2 hours per Khasra No.<br />

A number <strong>of</strong> experiments were conducted to further explore the breakup <strong>of</strong> 4.2 hours<br />

into sub-processes.<br />

<br />

In preliminary work the preparation <strong>of</strong> Conclusive title register<br />

(Chaant) consumes 40% <strong>of</strong> time.<br />

The preparation <strong>of</strong> Chuminda Register and Chuminda consumes 10%<br />

<strong>of</strong> time.<br />

<br />

<br />

The demarcation <strong>of</strong> the village boundary, Govt. <strong>Land</strong>s, Common<br />

<strong>Land</strong>s in the field also consumes 40% <strong>of</strong> time.<br />

The actual shooting/measurement <strong>of</strong> lot polygon vertices consumes<br />

only 10% <strong>of</strong> the time.<br />

Thus it is deduced to speed up the process, Conclusive-Title- Analysis (Chaant),<br />

preparation <strong>of</strong> Chuminda-Register and demarcation be automated/computerized. The<br />

time taken to finish the integrated digitization <strong>of</strong> current Khasra No.’s shall be reduced to<br />

1/8 th <strong>of</strong> the time taken earlier for the same process.<br />

In order to implement the findings <strong>of</strong> above study an in-house s<strong>of</strong>tware solution has been<br />

developed to facilitate the generation <strong>of</strong> the conclusive title analysis register and<br />

Chuminda register from the data input consisting in the updated last Jamabandi entries.<br />

The s<strong>of</strong>tware is called “CHANT” and is named on the basis process it automates.<br />

NIC,Deity,MCIT,GOI DOLR,MORD,GOI 92