25.01.2015 Views

Tourisme vert à Montréal

Tourisme vert à Montréal

Tourisme vert à Montréal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.2. Public transit<br />

3.2.3. Projects – Tramway project<br />

• Building an initial 13.2-kilometre tramway route<br />

linking Côte des Neiges to downtown<br />

• Completion date: 2016<br />

• The complete network will be 22 km long<br />

Project details:<br />

• Improve public transit service to that area<br />

• Encourage development in adjacent areas with<br />

development or redevelopment potential<br />

• Support recreational and tourism development<br />

in adjacent areas<br />

• Connect institutional, commercial, cultural and<br />

tourism hubs<br />

Three lines<br />

• Côte-des-Neiges Line<br />

• Du Parc Line<br />

• Downtown Line<br />

Source:<br />

- Michel Labrecque, “La Stratégie de la STM pour mieux respirer <strong>à</strong> <strong>Montréal</strong>,” Presentation given at the <strong>Montréal</strong> 2011 Ecocity World<br />

Summit.<br />

79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!