INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>INTEGRATED</strong> <strong>WATER</strong><br />
<strong>RESOURCE</strong> <strong>MANAGEMENT</strong> <strong>II</strong><br />
ANNUAL REPORT<br />
YEAR 3<br />
(JANUARY - DECEMBER 2011)<br />
REPORT NO 27<br />
February 2012<br />
This report is made possible by the support of the American People through the United States Agency for International<br />
Development (USAID). It was prepared by International Resources Group (IRG).<br />
TITLE 1
<strong>INTEGRATED</strong> <strong>WATER</strong><br />
<strong>RESOURCE</strong> <strong>MANAGEMENT</strong> <strong>II</strong><br />
ANNUAL REPORT<br />
YEAR 3<br />
(JANUARY– DECEMBER 2011)<br />
REPORT NO. 27<br />
Contract No. EPP-I-00-04-00024-00 Task Order No. 06<br />
February 2012<br />
DISCLAIMER<br />
The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for<br />
International Development or the United States Government.
TABLE OF CONTENTS<br />
1. SUMMARY OF ACTIVITIES 1<br />
2. ACCOMPLISHMENTS DURING THE REPORTING PERIOD 8<br />
3. ACTIVITIES PLANNED FOR NEXT QUARTER 23<br />
4. PROBLEMS AND ISSUES 27<br />
ANNEX A:MONITORING AND EVALUATION PLAN UPDATE 30<br />
ANNEX B: ANNUAL FINANCIAL STATUS REPORT 36<br />
ANNEX C: TABLE OF REPORTS 40<br />
ANNEX D: TECHNICAL ASSISTANCE TABLE 41<br />
ANNEX E: YEAR 3 ANNUAL TRAINING REPORT 42<br />
ANNEX F: <strong>LIFE</strong>-OF-PROJECT PROCUREMENT REPORT 49
ACRONYMS<br />
AUC<br />
APRP<br />
ARC<br />
BCWUA<br />
CDIAS<br />
CFI<br />
COP<br />
CTO<br />
DWAT<br />
EEAA<br />
EIA<br />
EPADP<br />
EPIQ<br />
FARA<br />
GDA<br />
GD<br />
GOE<br />
GIS<br />
GPS<br />
GTZ<br />
GW<br />
HCWW<br />
HO<br />
HVCs<br />
IAS<br />
ICAPP<br />
<strong>II</strong>IMP<br />
<strong>II</strong>P<br />
IQC<br />
IMS<br />
IR<br />
IRG<br />
IRU<br />
IS<br />
IWMD<br />
IWMU<br />
American University Cairo<br />
Agricultural Policy Reform Program<br />
Ministry of Agriculture and Land Reclamation Agriculture Research Center<br />
Branch Canal Water User Association<br />
Central Directorate of Irrigation Advisory Service<br />
Chamber of Food Industries<br />
Chief of Party<br />
Cognizant Technical Officer<br />
District Water Advisory Team<br />
Egyptian Environmental Affairs Agency<br />
Environmental Impact Assessment<br />
Egyptian Public Authority for Drainage Projects<br />
Environmental Policy and Institutional Governance (Indefinite Quantity Contract)<br />
Fixed Amount Reimbursable Agreement<br />
Global Development Alliance<br />
General Director<br />
Government of Egypt<br />
Geographic Information System<br />
Global Positioning System<br />
Gesellschaft für Technische Zusammenarbeit (the German International<br />
Development Agency)<br />
Groundwater<br />
The Holding Company for Water and Wastewater<br />
Home Office<br />
High Value Crops<br />
Irrigation Advisory Service<br />
International Co. for Agricultural Production & Processing<br />
Integrated Irrigation Improvement and Management Project<br />
Irrigation Improvement Project<br />
Indefinite Quantity Contract<br />
Information Management System<br />
Internal Regulations<br />
International Resource Group<br />
Institutional Reform Unit of MWRI<br />
Irrigation Sector<br />
Integrated Water Management District<br />
Integrated Water Management Unit<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)<br />
v
IWRM I USAID/Egypt funded <strong>LIFE</strong> Integrated Water Resource Management Project (2004-<br />
2008)<br />
IWRM <strong>II</strong> USAID/Egypt funded Integrated Water Resources Management <strong>II</strong> (2009-2012)<br />
JICA Japan International Cooperation Agency<br />
<strong>LIFE</strong> Livelihoods and Income from the Environment<br />
LOE Level of Effort<br />
LOP Life of Project<br />
LTTA Long-Term Technical Assistance<br />
LWOP Leave Without Pay<br />
M&E Monitoring and Evaluation<br />
MALR Ministry of Agriculture and Land Reclamation<br />
MIC Ministry Information Center<br />
MISD Matching Irrigation Supply and Demand Program<br />
MOH Ministry of Housing<br />
MOU Memorandum of Understandings<br />
MSEA Ministry of State for Environmental Affairs<br />
MWRI Ministry of Water Resources and Irrigation<br />
O&M Operation And Maintenance<br />
OJT On-the-job training<br />
PMP Performance Monitoring Plan<br />
PPP<br />
Private–public partnership<br />
PSD Office of Productive Sector Development<br />
PS<br />
Planning Sector<br />
PWM Participatory Water Management<br />
RA<br />
Regional Advisor<br />
RDNQ Renewal And Rehabilitation Of North Qena Drains<br />
RFTOP Request for Task Order Proposal<br />
RO<br />
Regional Office<br />
RWMO Regional Water Management Organization<br />
STTA Short-Term Technical Assistance<br />
SWERI Soil, Water and Environment Research Institute<br />
TA<br />
Technical Assistance<br />
TNA Training Needs Assessment<br />
TOT training of Trainers<br />
UPEHC Union of Producers & Exporters of Horticultural Crops<br />
US<br />
United States<br />
USAID United States Agency for International Development<br />
WADA Water & Development Alliance<br />
WCT Water Conservation Practices and Technologies<br />
WCU Water Communication Unit<br />
WQU Water Quality Unit<br />
WUA Water User Associations<br />
vi ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)<br />
vii
1. SUMMARY OF ACTIVITIES<br />
International Resource Group (IRG), under the USAID/Egypt Integrated Water Resources<br />
Management <strong>II</strong> Project (IWRM <strong>II</strong>), Contract No. EPP-I-00-04-00024-00 Task Order No. 06, is<br />
responsible for assisting the Government of Egypt (GOE) in promoting integrated water resources<br />
management. The period of performance of the project is from January 25, 2009 to September 30,<br />
2012.<br />
The purpose of this report is to present the status and performance of IWRM <strong>II</strong> for Year 3 covering<br />
the period from January to December 2011. This Annual Report summarizes the previous year’s<br />
activities and accomplishments against the respective Annual Work Plan indicators, and serves as the<br />
tool by which USAID/Egypt can monitor project performance. The report includes status of<br />
personnel and project activities, and summarizes services delivered and progress towards achieving<br />
results identified in the Project Monitoring Plan (PMP). It documents both successes and failures of<br />
the project interventions, and discusses reasons for shortcomings and recommends actions to<br />
overcome them. The Annual Report has the following content: summary; accomplishments during<br />
the year; planned activities for the following quarter (January – March 2012); and a section on<br />
problems, issues, and lessons learned.<br />
The following items have been included as annexes: Annex A: Monitoring and Evaluation (M&E)<br />
Plan Update, Annex B: Annual Financial Status Report, Annex C: List of Project Reports, Annex D:<br />
Status of Technical Assistance, Annex E: Training Report, and Annex F: Procurement Status Report.<br />
A summary of the activities and accomplishments for the Project Year 3 (January to December 2011)<br />
follows:<br />
Due to political unrest in Egypt, USAID declared an Ordered Departure for non-essential<br />
USAID/Egypt Contractors on February 2, 2011. The IRG IWRM <strong>II</strong> Chief of Party (COP) was<br />
considered essential and remained in Cairo. The IRG Cairo office remained open throughout with<br />
the exceptions of January 30 & 31, when it was deemed risky for staff to travel within Cairo. The<br />
Regional Offices in Zagazig and Mansoura remained open throughout. Although the offices<br />
remained open, progress was diminished due to interruption of travel at times and due to changes in<br />
government discussed below.<br />
As a result of a cabinet reshuffle, H.E. Minister Dr. Mohamed Nasr Allam, resigned on January 31.<br />
Dr. Hussein El-Atfy, Ministry of Water Resources and Irrigation (MWRI) Senior Undersecretary, was<br />
appointed as the new Minister. Eng. Fathy Abdel Maksoud El Gouielly, Head of Irrigation Sector,<br />
was appointed the new Chairman of Irrigation Department. Dr. Hussam El-Din Safwat Fahmy,<br />
Chairman of Drainage Authority (EPADP), was appointed the Head of the USAID/MWRI Steering<br />
Committee on 22 February. Dr. Mohamed Abdel Motaleb, Head of Planning sector was appointed as<br />
the IWRM <strong>II</strong> Coordinator.<br />
USAID initiated a Mid-Term Evaluation of the project in early January and it was mutually agreed to<br />
delay finalizing the Year 3 Work Plan until after the evaluation results were available. The evaluation<br />
team’s initial findings were presented verbally in separate meetings to HE Minister MWRI and<br />
MWRI Steering Committee Members and IRG staff on January 20. A draft report was issued on<br />
February 23. IRG submitted a written response to the Mid-Term Evaluation on March10. IRG’s<br />
Technical Assistance (TA) team held a meeting with USAID on March 20 to discuss the Mid-Term<br />
Evaluation draft report. IRG received the final Mid-Term Evaluation report on May 18. The<br />
Evaluation recommendations included de-scoping (no further activity) Tasks 1.2, 1.4, and 2.1. The<br />
Evaluation also recommended freezing Task 2.4 and not considering any additional candidates.<br />
MWRI and IRG accepted the recommendations and IRG adjusted the project implementation plan<br />
accordingly. The de-scoping did not have a significant impact on the budget. Task 1.4 was already<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 1
far along and budget allocated to the Tasks 1.2 and 1.4 was nominal to begin with, and some had<br />
been used at the time of de-scoping. A contract modification to reflect the revised scope of work<br />
has not been issued by USAID to date.<br />
On April 5 a USAID delegation visited West Belbeis Integrated Water Management District<br />
(IWMD). The delegation included John Crocker (Political Officer, U.S. Embassy Cairo), Catherine<br />
Picard (Environment and Natural Resource Officer), and David Roberts (Nile Program, Foreign<br />
Affairs Officer), in addition to John Pasch (Water Team Leader) and Eng. Wafaa Faltaous (COTR).<br />
Eng. Nabil Fawzi (IRG) accompanied the delegation.<br />
A Ministerial Decree was issued on April 14 reforming the IWRM <strong>II</strong> Steering Committee to include<br />
the following members: Head of Egyptian Public Authority for Drainage Projects (Chairman), Head<br />
of Irrigation Department, Head of Planning Sector (Project Coordinator), Head of Groundwater<br />
Sector, Head of the Minister's Technical Office, Head of Irrigation Sector, Undersecretary of Water<br />
Advisory Services, USAID representative (COTR), and IRGs Chief of Party.<br />
Long-Term Technical Assistance (LTTA), Senior Strategic Communication and Public Awareness<br />
Specialist Ms. Cheryl Groff’s one-year assignment was extended through June 2011. She completed<br />
her LTTA assignment and returned to the United States on June 30.<br />
In a second government reshuffle, H.E. Minister Dr. Hussein El-Atfy, resigned in July. Dr. Hesham<br />
Kandil, MWRI Head of the Nile Sector, was appointed as the new Minister on July 18. HE Minister<br />
Kandil issued a ministerial decree on August 9 appointing Dr. Khaled Toubar to the IWRM <strong>II</strong><br />
Steering Committee. Another decree was issued on August 16 assigning Dr. Toubar as the Project<br />
Coordinator in addition to his position as General Director for Design and Barrage Safety under the<br />
Reservoir and Grand Barrage Sector.<br />
The project started the year employing six MWRI engineers on Leave Without Pay (LWOP) working<br />
full time – two in the Cairo office and two each in the Zagazig and Mansoura Regional Offices. Dr.<br />
Moamen El Sharkawy and Eng. Amira Abdel Hady were assigned to the Cairo office. Eng. Ayman<br />
Shedid, Water Management Specialist and Eng. Soha Mostafa, Water Information Specialist, were<br />
assigned to the Zagazig Regional Office. Eng. Elbayoumi Ali Ez Eldeen, Water Management<br />
Specialist and Eng. Akmal Badie Henein, Water Information Specialist were assigned to the<br />
Mansoura Regional Office. The LWOP decree expired at the end of June and MWRI recalled all of<br />
them on July 14. This left the staff very short-handed. MWRI issued new LWOP decrees for Dr.<br />
Moamen and Engrs. Amira in August, and for Ayman and Akmal in September and all four returned<br />
to work as project staff. The other two field positions were filled by Eng. Tamer Gomaa in Zagazig<br />
in mid-October and Eng. Mohamed Bakry in Mansoura in mid-November. The project has been<br />
fully staffed since mid-October after 4 months of being short staffed.<br />
Andrew Tczap, IRG Home Office (HO) Senior Manager, completed a 15-day assignment (March 30<br />
–April 16) to prepare a management assessment of the project, assist with preparing Year 3 Work<br />
Plan, and assist with a budget review.<br />
Dr. Craig Anderson, Expat Institutional Development Specialist, completed a 22-day short-term<br />
technical assistance (STTA) assignment (March 30–April 28) to assist with preparing Year 3 Work<br />
Plan, assist with Task 1.3 Improvements in Water Productivity and Efficiency, and review the<br />
Updated Communications Plan.<br />
Firras Traish, IRG Project Coordinator/Procurement Officer completed a 12-day STTA assignment<br />
(May 19 –June 2) to review procurement and purchasing files.<br />
Dr. J. Fredericks (COP) was reassigned to the Home Office by IRG and he departed Egypt on May<br />
12. Andrew Tczap arrived Cairo on May 9 to take up the position of COP vacated by Dr.<br />
Fredericks.<br />
2 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
USAID requested a presentation on the draft Year 3 Work Plan and the project staff made the<br />
presentation on May 17.<br />
A staff meeting, including Regional Office staff, was held on May 18. Prof. Dr. Mohamed Abdel<br />
Motaleb, Head of MWRI Planning Sector, and IWRM <strong>II</strong> Project Coordinator attended part-time and<br />
discussed his expectations regarding the working relationships going forward.<br />
A Steering Committee meeting was held on 19 May. The entire committee was in attendance except<br />
for USAID, whose member was notified of the meeting with one day’s notice and had a previous<br />
commitment. The Committee approved the Year 3 Work Plan contingent on some minor<br />
modifications being made. The modifications were made and the final Work Plan was distributed.<br />
During the period May 24 – 26, Eng. Wafaa Faltaous, USAID (COTR) visited Port Said, Dekerness<br />
and East Elbohirat IWMDs and attended BCWUA meetings and the Branch Canal Water User<br />
Association (BCWUA)’s Women Board Members Orientation for Ismailia GD & IWMDs. Andrew<br />
Tczap, IRG Chief of Party, joined for the first day at Port Said, Eng. Nabil Fawzi attended the entire<br />
trip and Mr. Mohamed Anas, Economist, Ministry of International Cooperation; Department of<br />
Cooperation joined the trip on May 26.<br />
A monthly coordinating meeting was held on June 6, with John Pasch and Wafaa Faltaous of<br />
USAID, Dr. Motaleb, Eng. Mohamed El Fetyani and Eng. Nabila Bahaa of MWRI, and Andrew<br />
Tczap of IRG in attendance.<br />
USAID and IRG met on June 9 to discuss the proposed $4.9 million in-kind grants to BCWUAs.<br />
John Irons (USAID), John Pasch (USAID), Eng. Wafaa (USAID), Eng Andrew Tczap (IRG), Eng.<br />
Nabil Fawzi (IRG), and Dr. Wadie (IRG) attended this meeting. Several more meetings related to the<br />
proposed grant program were held, several with MWRI and USAID decided to abandon the<br />
proposed grants program in early August.<br />
MWRI/IRG met on June 9 to discuss the need and benefit of adding geographic information<br />
system (GIS) training to the project activities. Eng. Andrew Tczap (IRG), Eng. Nabil (IRG), Eng.<br />
Hesham Shebab (MWRI/ID), and Eng. Tarek Saied (MWRI/PS) attended. Engrs. Hesham and<br />
Tarek followed up the meeting by canvassing districts and directorates to assess capabilities and<br />
requirements. The final conclusion was that GIS was not appropriate at the district level at this time.<br />
MWRI (Central Directorate of Irrigation Advisory Service or CDIAS)/IRG met on June 14 & 22 to<br />
discuss the potential for cooperation between Livelihoods and Income from the Environment<br />
(<strong>LIFE</strong>) IWRM <strong>II</strong> project and MWRI Central Directorate of Irrigation Advisory Service (CDIAS).<br />
Eng. Andrew Tczap (IRG), Eng. Nabil Fawzi (IRG), Dr. Moamen (IRG), and Eng. Atef Elkashef<br />
(CDIAS) attended.<br />
MWRI/CDIAS and IRG personnel met on July 3 and 7 to continue investigating the potential for<br />
cooperation. Eng. Tczap (IRG), Eng. Nabil (IRG), Eng. Mohamed Elfetyani (Planning Sector), Dr.<br />
Moamen (IRG), and Eng. Atef Elkashef (CDIAS) attended these meetings. Eng. Atef suggested a<br />
training needs assessment (TNA) be conducted by CDIAS staff in the IWRM <strong>II</strong> area and the project<br />
offered their support. CDIAS began by visiting a sample of IWRM districts (50%) to conduct a<br />
TNA. Project staff from the regional offices attended most of these sessions. The CDIAS visits<br />
were completed on August 4.<br />
CDIAS and IRG met on August 10 and 17 to discuss the findings of TNA for the IWRM <strong>II</strong> Water<br />
Advisory Teams and the potential for cooperation between the IWRM <strong>II</strong> project and CDIAS. Eng.<br />
Tczap (IRG), Eng. Nabil (IRG), Eng. Mohamed Elfetyani (Planning Sector), Dr. Moamen (IRG),<br />
Eng. Nagwa (who replaced Eng. Atef Elkashef), Eng. Ahmed and Eng. Ezzat (CDIAS) attended<br />
both meetings. Eng. Wafaa (USAID) attended the August 17 th meeting. The main conclusion<br />
reached by the TNA was that refresher training was needed in some districts and would be beneficial<br />
in all districts.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 3
Dr. Tom Sheng conducted an STTA assignment to review the status of Task 2.3 (21 July to 5<br />
August).<br />
Dr. Mark Svendsen conducted an STTA assignment to review the status of the M&E data collection<br />
and to prepare a plan for monitoring two new indicators related to organizational performance of the<br />
integrated districts and the BCWUAs (13 to 29 July).<br />
A monthly project coordination meeting was held on July 5 with Eng. Wafaa (USAID COTR), Dr.<br />
Mohamed Motaleb (Project Coordinator), and Andrew Tczap (IRG COP) and Eng. Mohamed El<br />
Fetyani in attendance. Main topics discussed included: potential FARA for canal maintenance, status<br />
of Ministry of Agriculture and Land Reclamation (MALR) staff on LWOP, possible use of the<br />
MWRI training center, upcoming study tours, and the July training schedule.<br />
USAID and IRG met on July 5 to discuss the results of the coordination meeting. Eng. Wafaa<br />
(USAID), Eng. Tczap (IRG), Eng. Nabil Fawzi (IRG), and Dr. Wadie (IRG) attended this meeting.<br />
MWRI and IRG met on July 28 to be briefed on Dr. Svendsen’s activities during his mission,<br />
including his conclusions and future plans. They also discussed Dr. Sheng’s preliminary conclusions<br />
based on review of the project’s Information Management System (IMS) activities and his visits to<br />
Mansoura Regional Office (RO) and to the West Belbeis and Eltollombat IWMDs (as well as to Abo<br />
Kebeer, an IWMD supported in IWRM I). Dr. Sheng’s planned activities during the remainder of his<br />
assignment were discussed as well. Dr. Motaleb, Eng. Tczap, Eng. El Fetyani, Eng. Nabil, Dr. Wadie,<br />
and Dr. Moamen attended the meeting, together with Drs. Svendsen and Sheng.<br />
Staff coordination meetings were held on July31, and August 9 and 18. The RO staff attended the<br />
July 31 and August 18 meetings.<br />
MWRI and IRG staff met on August 4 to discuss the status of the IWMD digital maps (11 layers)<br />
and the possibility of developing a course to demonstrate how GIS technology can integrate<br />
information from different sources and perform geospatial analysis to support water management<br />
decision making at the district and directorate levels. Engs. Tczap, Nabil, Hesham (Irrigation<br />
Department), Tarek (Planning Sector), and Dr. Sheng attended the meeting.<br />
Mr. Tczap and Eng. Nabil made an inspection visit to Shoubra IWMD on August 15.<br />
MWRI and IRG staff met on August 21 to discuss project status. Dr. Khaled Toubar (MWRI<br />
Coordinator), Mr. Tczap, and Eng. Nabil attended this meeting.<br />
The IWRM <strong>II</strong> COP, Mr. Tczap, departed on leave on August 22 and returned to the office on<br />
September 4.<br />
An IRG staff coordination meeting was held on September 4 to begin preparing for the Year 4<br />
Work Plan workshop.<br />
A meeting was held on September 6 to brief Dr. Khaled Tobar (the new IWRM <strong>II</strong> Project<br />
Coordinator), on the project’s various activities. Eng. Tczap, Eng. Nabil, Dr. Wadie, and Dr.<br />
Moamen attended the meeting.<br />
A USAID/MWRI/IRG coordination meeting was held on September 11. Eng. Wafaa Faltaous,<br />
USAID (COTR), Dr. Khaled Toubar (Project Coordinator), Mr. Andrew Tczap (COP), Eng. Nabila<br />
Bahaa (ID), Eng. Tarek Awwad (IS), Eng. Nabil, and Dr. Wadie attended the meeting.<br />
MWRI (Groundwater (GW) Sector) and IRG staff met on September 15 to discuss conducting a<br />
GW database training course (Directorate Vision). Dr. Madeha (Head of GW), Eng. Ahmed Abd<br />
Elmaksoud (GW), Dr. Hanan (GW), Eng. Tczap and Eng. Nabil attended the meeting.<br />
Arrangements were agreed to and the course was conducted by the GW Sector staff in the last<br />
quarter of Year 3.<br />
4 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
An MWRI (Planning Sector) project coordination meeting was held on September 18. Dr. Mohamed<br />
Motaleb (Head of Planning Sector), Dr. Khaled Toubar (Project Coordinator), Mr. Tczap, Eng.<br />
Nabil, Dr. Wadie, and Eng. Elfetyani (PS) attended the meeting.<br />
A coordination meeting for USAID and IRG staff was held on September 22. Eng. Wafaa Faltaous,<br />
USAID (COTR), Mr. Andrew Tczap (COP) and Eng. Nabil attended the meeting.<br />
The project initiated negotiations with El Zanaty & Associates on September 18 to conduct a<br />
farmers’ survey in the project area. Negotiations were completed and a fixed price purchase order<br />
was issued on September 29. The work has progressed according to schedule and the draft report<br />
was completed in mid-December. Review of the draft report is ongoing at the writing of this report.<br />
The head of the ID issued the decree No. 365 dated 28 September granting Eng. Mohamed Anwar<br />
Elbakry LWOP up to July 31, 2012 to work with the consultant in Mansoura RO as Water<br />
Resources Management Specialist. Eng. Mohamed started his assignment on LWOP on November<br />
20, 2011.<br />
Eng. Wafaa Faltaous, USAID (COTR), and Mr. Foaad Ellathy (USAID planning section) visited<br />
Elmataria IWMD on September 29. They attended a meeting with the district staff and with the<br />
BCWUAs in the Elmataria BCWUA No. (1) Office. They also visited a bridge located at Km 1.50 on<br />
branch canal No. 1 and a feeder to that canal from the Elganabia Elkhamsa canal, constructed by the<br />
BCWUA with IWMD supervision. Eng. Zenab Elraies, the head of the Central Directorate for Water<br />
Resources & Irrigation, Eng. Saad Elsaied Elsalam, General Director, Eng. Nabil, Eng. Elsaied Nagy<br />
and Eng. Akmal joined the trip.<br />
A Steering Committee meeting was held on October 2. The entire committee was in attendance<br />
except the head of the GW sector due to schedule conflict.<br />
Mr. Russell Misheloff, IRG HO Project Manager, started his assignment on October 1 and left Cairo<br />
on October 20. He assisted in preparing the Year 4 Work Plan and other reports that were in<br />
preparation.<br />
IRG staff coordination meeting was held on October 4 to prepare for the Year 4 Work Plan. The<br />
Regional Advisors (RAs) didn’t attend the meeting.<br />
The draft Year 4 Work Plan was distributed for review on October 17.<br />
The head of the ID issued the decree No. 449 dated October 19 granting Eng. Tamer Ibrahim<br />
Gomaa LWOP up to July 31, 2012 to work with the consultant in Zagazig RO as Water<br />
Management Specialist. Eng. Tamer started his assignment on LWOP on October 19, 2011.<br />
An IRG staff coordination meeting, including Regional Office staff, was held on October 24.<br />
A meeting between MWRI (Ministry Information Center – MIC) and IRG was held on October 24<br />
to discuss their capability in revising the IWMDs Digital Maps. Mr. Andy, Dr. Hesham, the head of<br />
the MIC, Eng. Nabil, and Eng. Sanaa attended the meeting. MIC indicated they have the capability<br />
and resources to assist with the digital maps and agreed to review one map to determine the effort<br />
required.<br />
Eng. Wafaa Faltaous, USAID COTR, attended the Qualubia October monthly meeting on October<br />
25, the undersecretary, the district’s directors, Eng. Nabil, Eng. Maher, and Eng. Abeer Salama<br />
attended the meeting.<br />
A Steering Committee meeting was held on October 31 to follow up the last meeting’s comments,<br />
Year 4 Work Plan and Workshop and other matters. The entire committee was in attendance except<br />
the head of the planning sector who was on travel outside Egypt. Review comments on the draft<br />
Work Plan were provided to the project.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 5
MWRI and IRG met on November 1 to discuss the Year 4 Work Plan comments. Dr. Khaled, Eng.<br />
Nabila, Mr. Andy, Eng. Nabil, and Dr. Wadie attended the meeting.<br />
MWRI (MIC) and IRG held a second meeting on November 13 to discuss the status of MIC’s<br />
efforts to review the sample digital map. Progress was disappointing and led to concerns about the<br />
practicality of appointing MIC to undertake the digital map review. Mr. Andy, Dr. Hesham Mustafa,<br />
and Eng. Nabil attended the meeting.<br />
MWRI (CDIAS) and IRG met on November 14 to discuss the future cooperation between IWRM <strong>II</strong><br />
project and MWRI CDIAS during Year 3 Quarter 4 and Year 4. Mr. Andy, Eng. Nabil, Dr. Moamen,<br />
Eng. Nagwa, and Eng. Abeer attended the meeting. It was decided that CDIAS would observe the<br />
next Task 1.1 training to be given by the project and then implement the last course to be held in the<br />
first quarter of 2012.<br />
The head of the Irrigation Department issued decree No. 214 dated November 22, 2011 extending<br />
LOWP to Eng. Ayman Abd Elsalam Shedeed and Eng. Akmal Aziz Badie from November 14, 2011<br />
up to April 30, 2012 to work with consultant in Zagazig and Mansoura ROs respectively.<br />
The head of the Irrigation Department issued decree No. 213 dated November 22, 2011 granting<br />
Eng. Nabil Nassif Faragalla five months LOWP to work with the consultant as Water Resources<br />
Management Specialist. Eng. Nabil started his assignment on LWOP on November 23, 2011.<br />
MWRI (CDIAS) and IRG met on November 22 to discuss the procedure for involving the CDIAS<br />
in the ongoing Task 1.1 training courses, related to IWRM <strong>II</strong>, during Year 3 Quarter 4 and Year 4 in<br />
addition to IWRM I. Mr. Andy, Dr. Khaled, Eng. Nagwa, and Eng. Nabil attended the meeting.<br />
The Year 4 Work Plan workshop was held from November 16 to 18. The Steering Committee<br />
members, USAID representatives, minister’s office representatives, East Delta Region head of<br />
Central Directorates & General Directorates of Water Resources and Irrigation, IRG representatives<br />
and field Engineers from West Belbeis, Elmollak, Deyarb Negm, Elbohirat IWMDs and the head of<br />
Qena technical office of Central Directorate of Water Resources & Irrigation attended the workshop.<br />
The Year 4 Work Plan has been approved.<br />
A project staff meeting was held on December 7 to discuss status, issues, and constraints to progress<br />
and actions to overcome constraints. The entire technical staff from Cairo and both field offices<br />
attended. A summary of issues and constraints identified in the meeting was written and shared with<br />
the Project Coordinator.<br />
Mr. Tczap and Eng. Nabil met with Dr. Khaled, Project Coordinator, on December 8 to discuss the<br />
findings that came out of the December 7 project staff meeting.<br />
Giza Systems company, a local vendor of water monitoring equipment, made a presentation to the<br />
project on December 12 on the flow measurement equipment they provide. In addition to project<br />
staff, three members of the MRWI Telemetry staff and Eng. Abeer Salama attended.<br />
Mr. Tczap met with Eng. Wafaa, USAID COTR to discuss project status, budget realignment, and<br />
various other project activities.<br />
The project distributed the final versions of the Year 4 Work Plan and the Year 4 Workshop report<br />
on December 13.<br />
The project staff met with CDIAS on December 14. It had previously been decided that CDIAS<br />
would give the last remaining Task 1.1 training course and the meeting established the details and<br />
logistics of the upcoming course. The responsibilities of CDIAS and the project were clearly<br />
defined.<br />
Eng. Nagwa (CDIAS), Mr. Tczap, Eng. Nabil, Dr. Wadie, and Ms. Dahlia attended.<br />
6 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
Under Training, 18 courses were implemented, consisting of 118 events. The Year 3 training<br />
included 163 training days for 4,112 Trainees (22% women). The Year 4 Annual Work Plan<br />
workshop was held in Movenpick Resort El Sokhna for 52 persons from November 16-18, 2011.<br />
The Year 3 Annual Report and three quarterly progress reports were submitted to USAID.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 7
2. ACCOMPLISHMENTS DURING<br />
THE REPORTING PERIOD<br />
TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />
CANAL <strong>WATER</strong> USER ASSOCIATIONS<br />
Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the IRG coordinator<br />
for this task. Dr. Moamen El Sharkawy and Eng. Amira Abdel Hady provided technical support and<br />
Dr. Stan Peabody (IRG), Sociologist, provided expatriate STTA support. Activities carried out during<br />
Year 3 include:<br />
• BCWUA activation Process was ongoing throughout the year. Memorandum of<br />
Understandings (MOU) and Internal Regulations (IR) were completed by BCWUA’s<br />
chairpersons and board members in all 622 associations. The MOUs’ and IRs’ signature and<br />
endorsement by Irrigation Undersecretaries were finalized for 45/45 IWMDs.<br />
• The BCWUAs Activation Follow-up & Development of Integrated Maintenance Plan<br />
Workshop was completed (7/7 events).<br />
• BCWUA Chairpersons IDs were completed and issued to all 622 chairpersons.<br />
• IWMDs and BCWUAs participatory maintenance needs assessments and maintenance<br />
priorities completed for all 622 BCWUAs.<br />
• BCWUA Chairperson Activation Workshops were completed, 9/9 events.<br />
• Action plans were completed for all 622 BCWUAs.<br />
• BCWUAs Women Board Members Orientation was completed 7/7 events.<br />
• BCWUA summer seasonal meeting in Naga Hammadi IWMD (W. Qena general directorate)<br />
was conducted on May 3, attended by Eng. Nabil Fawzi (IRG).<br />
• IRG staff attended the BCWUA’s women board member monthly meetings in East Faquos<br />
and North Aga IWMDs on June 28 & 29 respectively.<br />
• BCWUA women board members attended meetings with IWMD water advisory women<br />
staff and received training in their roles and responsibilities and water quality related<br />
awareness activities. Within the 45 IWMDs and 622 BCWUAs, ١٩٩ meetings were held with<br />
BCWUA women board members. These were attended by 309 of 449 women board<br />
members. An additional (non-board members) 222 women attended those meetings from<br />
the BCWUAs residential areas. Most importantly, many BCWUAs conducted new elections<br />
for their Boards of Directors resulting in 78 women being elected to boards in 42 BCWUAs<br />
that did not have women board members previously.<br />
• Participatory Water Management Phase I training workshops were completed (seven events).<br />
• MWRI (CDIAS) conducted a TNA for the IWRM <strong>II</strong> Water Advisory Teams in the East<br />
Delta region.<br />
8 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
Directorate<br />
• The BCWUAs’ Participatory Water Management (PWM) implementation training course<br />
conducted seven events. Eng. Nagwa Elkhsshab and Eng. Ezzat Elshafey (CDIAS) attended<br />
the East Dakahlia event.<br />
• 45 of 45 Winter Seasonal Meetings were held with BCWUAs Chairpersons.<br />
• 622 of 622 BCWUAs Board meetings were held to assign board members PWM training and<br />
subsequent activities.<br />
• Water Advisory Team coordination meetings held (27 events)<br />
IWMDs<br />
MWRI<br />
Area (d)<br />
BCs<br />
Status of BCWUAs End of Year 3<br />
BCWUA<br />
Users<br />
BCWUAs<br />
Formed<br />
Elected<br />
Board<br />
Members<br />
&<br />
Decrees<br />
MOU<br />
Internal<br />
Reg.<br />
Needs<br />
Assessment<br />
Maint.<br />
Priorities<br />
Damietta 2 59,243 61 24,567 27 27 27 27 27 27 27 27<br />
Elsalam 4 221,130, 97 17,598 56 56 56 56 56 56 56 56<br />
E. Dakahlia 8 355,124 329 137,328 141 141 141 141 141 141 141 141<br />
S. Dakahlia 5 198,795 127 299,302 88 88 88 88 88 88 88 88<br />
Ismailia 6 302,500 61 20,864 51 51 51 51 51 51 51 51<br />
Salhia 7 457,558 99 201,951 82 82 82 82 82 82 82 82<br />
E. Sharkia 5 211,233 187 72,542 83 83 83 83 83 83 83 83<br />
Qualubia 8 357,748 259 530,200 94 94 94 94 94 94 94 94<br />
Total 45 2,163,331 1220 1,304,352 622 622 622 622 622 622 622 622<br />
ID<br />
Cards<br />
Action<br />
Plan<br />
Task 1.1 PMP Indicators and Targets<br />
Year 1 Year 2 Year 3<br />
Task Indicator Units Baseline Target Actual Target Actual Target Actual<br />
1.1 Formation and Development of Branch Canal Water Users’ Associations (BCWUAs)<br />
1.1.a Number of IWMDs with staffed Water<br />
Advisory Teams<br />
Number 0 45 45 45 45 45 45<br />
1.1.b Number of GDs with staffed Water<br />
Advisory Teams<br />
Number 0 8 8 8 8 8 8<br />
1.1.c Percent of planned BCWUAs<br />
established by ministerial decree<br />
Percent 0 50 0 100 100 100 100<br />
1.1.d Percent of BCWUAs with maintenance<br />
priorities and action plans<br />
Percent 0 0 0 50 0 100 100<br />
1.1.e Percent of BCWUAs monitoring and<br />
reporting on branch canal water Percent 0 0 0 50 0 25 25<br />
supply<br />
TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />
DRAIN MAINTENANCE<br />
Very little activity was ongoing in January when the USAID Mid-Term Evaluation was underway and<br />
this task was put on hold until recommendations of the Evaluation became known. The Evaluation<br />
recommended, and MWRI concurred, to cease activity on this task and the project complied.<br />
TASK 1.3: IMPROVEMENTS IN <strong>WATER</strong> PRODUCTIVITY AND<br />
EFFICIENCY<br />
Dr. Wadie Fahim Mankarious (LTTA Senior Organization/Institutional Development Specialist) is<br />
the IRG coordinator for this task. He is supported by several local consultants, including Dr. Ahmed<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 9
Behery, On Farm Irrigation Specialist; Dr. Walid Sallam, Agricultural Economist; and Dr. Abd El<br />
Wahab, Crops Agricultural Specialist. Activities carried out during Year 3 include:<br />
• Support to farmers who participated in the previously conducted pilot continued for winter<br />
and summer crops in the two pilot areas in Abu Kebeer IWMD (West Sharkia) and W.<br />
Belbeis IWMD (Qualubia).<br />
• The project encouraged BCWUAs to work independently on marketing their crops. As a<br />
result, the BCWUAs in West Belbeis contracted directly with the following buyers for fruits,<br />
vegetables, and spices: the United Brothers Co. for Strawberry Trade and Nurseries'<br />
Distribution; Al Awady for Trade and Supplies in Al Obour Market; Hebeish Sons also<br />
known as Sammour; and Spicy Land Co. The estimated total area cultivated with winter<br />
crops is 123 feddans in the two pilot areas as shown in the table below.<br />
District BCWUA Crop Area (fd) Contract TA<br />
W. Belbeis<br />
Moustafa Afendy<br />
Meet Yazid<br />
El Makaser<br />
Peas 8 Yes Yes<br />
Onion 5 No No<br />
Fennel 3 Yes Yes<br />
Strawberry 21 Yes No<br />
Onion 16 Yes No<br />
Garlic 17 Yes Yes<br />
Peas 2 No No<br />
Tomato * 1 No No<br />
Abo Kebeer El Manshar Vegetables 50 N/A No<br />
Total 123<br />
* new variety brought by farmers<br />
• Dr. Walid Sallam and Dr. Mohamed Abd El Wahab visited the two pilot districts and<br />
provided guidance on winter crops.<br />
• As a result of the activity in the pilot areas, Spice Land Co. sent 500 kg of basil seeds to the<br />
BCWUAs/farmers in West Belbeis to encourage them to grow basil in summer 2011. The<br />
seeds were delivered free and the company provided TA. The following table shows the<br />
HVCs planted in West Belbeis IWMD in summer 2011 after completion of the pilot.<br />
No. Crop Area in year 2010 Area in year 2011<br />
1 Basil 50 67<br />
2 Sesame 130 2000<br />
3 Vegetables 28 4500<br />
4 Corn 36,998 35701<br />
5 Cotton 467 2126<br />
.<br />
• A report “Introducing High Value/Low Water Consumption Crops to East Delta Farmers:<br />
Findings and Lessons Learned from Pilots Summer Season 2010” was issued.<br />
• On March 6, a meeting with Ehab Emara, Agri-Business Manager of the International Co.<br />
for Agricultural Production & Processing (ICAPP) – AMERICANA, was held at USAID.<br />
Eng. Wafaa Faltaous (COTR), Dr. Abu El Wafa, (USAID Agriculture Specialist); J.<br />
Fredericks (IRG); Dr. Wadie Fahim (IRG); and Dr. Walid (IRG Consultant) attended. The<br />
meeting generated interest by these firms to work with farmers in the project area.<br />
10 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
• Dr. Walid, IRG consultant, and Ehab Emara, ICAPP, visited W. Belbeis on March 30. They<br />
met with six farmers and one Agricultural Extension agent. The possibility of contracting<br />
with farmers to grow okra and green beans this summer (May) on an area of 10 feddan was<br />
discussed. ICAPP will provide seeds to farmers. The contract terms were accepted and<br />
implemented by the farmers.<br />
• For raising awareness on cultivation of high value, low water consuming crops, Dr. Wadie<br />
Fahim attended three MWRI Undersecretary/General Directors monthly meetings in<br />
Mansoura, Dakahlia (March 14), Zagazig, Sharkia (March 15) and Benha, Qualubia (March<br />
17). Senior Agricultural staff also attended the meetings. The concept of high value crops<br />
and water conservation technologies was presented at the meetings.<br />
• The project arranged for six farmers from three BCWUAs in W. Belbeis IWMD to receive<br />
training offered by MACRO Market on high value crops (HVCs).<br />
• Dr. Walid, and Dr. Abd El Wahab conducted a training workshop on growing and marketing<br />
sesame to the farmers of West Belbies at their request. There were 40 attendees (18<br />
farmers, 13 MALR/Ag. Extension/ Ag. Cooperatives and nine MALR/IWMD).<br />
• The training workshops for MWRI/MALR staff on capacity building for HVCs and water<br />
conservation practices and technologies (WCT) were completed in the selected six<br />
directorates: Sharkia, Qaluobia, East Dakahlia, South Dakahlia, Damietta, and El Salam.<br />
Total number of staff attended from both Ministries was 207 (116 participants from MWRI<br />
and 91 from MALR). Undersecretaries of Qualubia, East Dakahlia, Damietta Central<br />
Directorates, and General Directors of the six Directorates (MWRI) attended the training.<br />
In one of the events in East Dakahlia, Eng. Ibrahim El Gamasy, Undersecretary (US)<br />
Dakahlia, attended and discussed his personal experience and benefits of using the improved<br />
(drip) irrigation system He stated that productivity increased by 40 percent and saving on<br />
fertilizer use was more than 35 percent.<br />
• Workshops for BCWUAs for dissemination of information on HVCs and WCTs were<br />
completed in Sharkia, Qaluobia, Damietta, El Salam, East Dakahlia, and South Dakahlia.<br />
Total number of participants was 635 farmers representing 308 BCWUAs. MALR<br />
collaborated and supported the activity by participation of Dr. El Garhy, Head, Ag.<br />
Extension Sector (MALR); Dr. Aliya Goda, Undersecretary, Central Directorate of Ag.<br />
Extension (MALR); Eng. Hamdy Younis, Undersecretary, Deputy, Chairperson of Ag.<br />
Extension Sector (MALR); Eng. Mohsen Abdo, Undersecretary, Central Directorate of Ag.<br />
Services; and Dr. Abu El Kasem M. Zahra, Deputy, Chairperson of Ag. Extension Sector.<br />
• Eng. Wafaa, COTR and Eng. Fouad Elleithy, Program Office, USAID, attended the training<br />
sessions for BCWUAs, MWRI/WATs and MALR/Ag Extension staffs of Port Saied and<br />
Materia IWMDs, El Salam Directorate on 28 September. Ms. Naglaa M. Hassan, Director of<br />
Technical Support of the MUCIA Project attended as an observer.<br />
• A mini-library containing MALR publications on HVCs and WCTs was distributed to<br />
BCWUAs at the dissemination of information and orientation workshops.<br />
• A newsletter and marketing material on HVCs was produced and distributed to BCWUAs,<br />
IWMDs, Ag. Extension Offices, and IWM Directorates in East Delta.<br />
• For strengthening the collaboration between MWRI and MALR, Dr. Wadie had a meeting<br />
on May 16 with Dr. Abd El Ghany El Gendy, Coordinator, MALR, to discuss the possibility<br />
of having a demo site for different types of irrigation improved systems. Dr. El Gendy<br />
requested to visit the site before final decision. Based on that meeting, Dr. M. Abd El<br />
Motaleb, Head of the Planning Sector, MWRI; Dr. El Gendy, MALR Coordinator; Dr.<br />
Behery and Dr. Wadie visited West Belbies IWMD and investigated a possible location for<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 11
the demo site for types of irrigation improvement systems. Dr. El Gendy promised to<br />
discuss the financial mechanism with the MALR Team. Due to unrest and changes of<br />
MALR leaders the process stopped.<br />
• The project had a meeting with Dr. Mohamed El Garhy, Head of Ag. Extension Sector,<br />
MALR. Dr. El Garhy accepted to enroll the BCWUAs in the SMS and Call Center services<br />
of MALR. Quick Service/Vodafone is the responsible firm for this service with MALR. A<br />
meeting with Quick Service/Vodafone Chairperson was conducted and arrangements to<br />
enroll the 620 BCWUAs board members in the Ag. Extension services were discussed. The<br />
project guided Vodafone for direct contact with the BCWUAs through the Ag. Cooperatives.<br />
• The project received an unsolicited request from El Maksar BCWUA to conduct a seminar<br />
on Water Conservation technologies and new irrigation systems. The seminar was scheduled<br />
to be on 25 October. Originally scheduled for one BCWUA to attend the seminar, another<br />
five BCWUAs from West Belbeis IWMD requested to participate and were accommodated.<br />
The seminar was conducted in Cairo and the project arranged for participants to visit the<br />
SAHARA Agricultural Exhibit that was going on in Nasr City.<br />
• USAID hosted a meeting involving IWRM <strong>II</strong>/IRG and MUCIA to discuss the possibility of<br />
collaboration and reduction of duplication. Eng. Wafaa and Dr. Abu El Wafa from USAID,<br />
Mr. Andy Tczap and Dr. Wadie from IRG, and Dr. Mohamed Samy, COP MUCIA,<br />
participated. IRG sent MUCIA the information on BCWUAs in East Delta Governorates<br />
requested during the meeting.<br />
• Year 4 Work Plan was prepared and presentations given at the annual workshop in Ain<br />
Sukhna. West Belbeis District Manager presented findings of the pilot activity and its impact<br />
on cropping pattern change and water savings.<br />
• A video on HVCs was produced and copies distributed to Directorates, IWMDs, and Ag.<br />
Districts.<br />
• It was planned to have a workshop for Buyers, Suppliers, and Bankers to be held in Cairo.<br />
The project started making arrangements by meeting with Eng. Yousri Tinawy, General<br />
Manager, Chamber of Food Industries (CFI) concerning the participants from CFI<br />
companies and a meeting at MALR with Dr. Assem Shaltout, Chairman of Union of<br />
Producers & Exporters of Horticultural Crops (UPEHC) for preparing the list of invitees<br />
from their association. Although planning had already begun, it was jointly decided with<br />
MWRI to cancel the event.<br />
• At the request of USAID, Dr. Wadie met with ACDI VOCA on June 27 to discuss<br />
common interests and the possibility of ACDI VOCA continuing the Task 1.3 activities<br />
upon completion of IWRM <strong>II</strong>. No decisions were taken as this would require a modification<br />
of ACDI VOCAs contract.<br />
Task 1.3 PMP Indicators and Targets<br />
Task<br />
Indicator Units Baseline Year 1 Year 2 Year 3<br />
Target Actual Target Actual Target Actual<br />
1.3 Improvements in Water Productivity and Efficiency<br />
1.3.a<br />
Number of farmers<br />
receiving training on<br />
High-Value Crops and<br />
water-saving technology<br />
Number 0 100 0 300 502 500 1,125<br />
12 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />
Dr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) is<br />
the IRG coordinator for this task. Mr. Russell Misheloff, Senior Economist provided STTA. Eng.<br />
Sami Yacoub (Organization/ Institutional Development Specialist) provided STTA support and<br />
follow-up to the Global Development Alliance: Environmental Services for Improving Water<br />
Quality Management in Egypt (GDA).<br />
The following activities were carried out during the first quarter of year, prior to the Mid-Term<br />
Evaluation results:<br />
• A meeting was held with the Holding Company for Water & Waste Water (HCWW) Legal<br />
Committee chaired by Mr. Osama Shalaby to discuss the possiblity of a 1,000 feddan pilot<br />
wastewater reuse concession scheme. Dr. Wadie attended the meeting and briefed the<br />
Committee on the concept and its benefits. HCWW sent a portion of the meeting minutes<br />
indicating approval of going ahead with the concept. This task was de-scoped before the<br />
project could respond.<br />
• The USAID Mid-term Evaluation Team recommended that the project cease all further<br />
activity related to Task 1.4 and the project has complied.<br />
Task 1.4 PMP Indicators and Targets<br />
Task Indicator Units Baseline Year 1 Year 2 Year 3<br />
Target Actual Target Actual Target Actual<br />
1.4 Wastewater Reuse<br />
1.4.a<br />
1.4.b<br />
Feasibility plan submitted<br />
for approval<br />
Number of partnership<br />
agreements signed<br />
0/1 0 1 0 1 1 1 1<br />
Number 0 0 0 0 0 2 0<br />
TASK 2.1: REGIONAL <strong>WATER</strong> <strong>MANAGEMENT</strong><br />
ORGANIZATIONS (RWMO)<br />
Activity on this task was on hold at the beginning of the year. In compliance with a USAID Mid-<br />
Term Evaluation recommendation and concurrence of MWRI, the project ceased all further activity<br />
under this task.<br />
TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />
<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />
Eng. Nabil Eng. Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator<br />
for this task. Eng. Maher Khodary (LTTA, Senior Water Resources Management Specialist, Regional<br />
Advisor) is responsible for managing the task for the four Directorates and 26 IWMDs covered by<br />
the Zagazig Regional Office. Eng. El-Sayed Nagi (LTTA, Senior Water Resources Management<br />
Specialist, Regional Advisor) who was replaced by Eng. Ibraheem Farag in November is responsible<br />
for managing the task for the four Directorates and 19 IWMDs covered by the Mansoura Regional<br />
Office. Eng. Ayman Shedid and Eng. Soha Mostafa who was replaced by Eng. Tamer Gomaa<br />
provided technical assistance support to the Zagazig IWRM <strong>II</strong> Regional Office during Year 3. Eng.<br />
Elbayoumi Ali Ez Eldeen who was replaced by Eng. Mohamed Elbakry and Eng. Akmal Badie<br />
Henein provided technical assistance support to the Mansoura IWRM <strong>II</strong> Regional Office during Year<br />
3. Activities carried out during Year 3 include:<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 13
• Business Plan and Integrated Preventive Maintenance data sheets have been completed by all<br />
IWMDs. Review/revision of data was completed for all 45 IWMDs by the project.<br />
Compiling the data was completed for all IWMDs.<br />
• IRG staff visited Faraskour and Deyarb Negm IWMDs on 11 January and Toukh and Kafr<br />
Shoukr IWMDs on January16 for follow up and support as needed.<br />
• To provide follow-up support to <strong>LIFE</strong>/IWRM I, IRG staff, the Head of the Central<br />
Directorate for Maintenance (the head of the IWRM I & <strong>II</strong> M&E committee) and the Head<br />
of the Irrigation Sector Technical Office attended East & West Qena General Directorate’s<br />
monthly coordination meeting. They visited Armant, Esna, and Qena IWMDs and attended<br />
the Esna BCWUA’s summer seasonal meeting (January 25-27). Visits to Qous IWMD (E.<br />
Qena General Directorate) and Naga Hammadi IWMD (W. Qena General Directorate) were<br />
conducted and attended by Eng. Nabil Fawzi. IRG staff also attended West Sharkia and New<br />
Zefta General Directorate’s quarterly coordination meetings held during April & May<br />
respectively. The meetings were attended by the Irrigation and Drainage Undersecretaries,<br />
the General Directors, District Managers and Regional Advisor. IRG staff stopped making<br />
follow-up visits to the five IWRM I supported directorates at mid-year as directed by MWRI.<br />
• ADSL lines for internet access have been installed in all eight Directorate offices and 27 of<br />
45 IWMDs. A list of the 18 IWMDs lacking ADSL service was sent to the Project<br />
Coordinator for information and action. The continuation of this service requires payment of<br />
overdue telephone invoices and some of the districts do not have budget for this.<br />
• Directorate IT teams continued to make regular visits to their respective IWMDs to provide<br />
computer maintenance support.<br />
• Basic Management Skills training was conducted, 8 events.<br />
• IRG staff in ROs completed quarterly visits to the each of the 45 IWMDs two times (90<br />
trips) to evaluate their performance and provide technical support and advice.<br />
• Quarterly maintenance meetings were conducted and attended by project staff (5 events)<br />
• Advanced Computer Skills training course was completed. (7/7 events)<br />
• Directorate Under Secretary monthly meetings were held (60 events) attended by MWRI and<br />
MALR staffs. Dr. Khaled Toubar (MWRI Project Coordinator) and Eng. Nabil Fawzi<br />
attended some of these meetings.<br />
Task 2.2 PMP Indicators and Targets<br />
Year 1 Year 2 Year 3<br />
Task Indicator Units<br />
Baseline<br />
Target Actual Target Actual Target Actual<br />
2.2 Formation and Development of Integrated Water Management Districts (IWMDs)<br />
2.2.a Number of IWMDs established<br />
with fully staffed senior positions<br />
Number 0 45 45 45 45 45 45<br />
2.1.b Number of IWMDs with<br />
completed integrated<br />
Number 0 0 0 45 45 45 45<br />
maintenance plans<br />
2.2.c Number of IWMDs with a training<br />
room established and equipped<br />
Number 0 20 0 45 45 45 45<br />
2.2.d Number of general directorates<br />
with a computer training center Number 0 8 8 8 8 8 8<br />
established and equipped<br />
2.2.e Number of IWRM I IWMDs<br />
participating in coordination<br />
meetings<br />
Number 27 27 27 27 27 27 27<br />
14 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />
SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>RESOURCE</strong><br />
<strong>MANAGEMENT</strong><br />
Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator for this<br />
Task. Eng. Ayman Shedid and Eng. Soha Mostafa who was replaced by Eng. Tamer Gomaa<br />
provided technical assistance support to the Zagazig IWRM <strong>II</strong> Regional Office during Year 3. Eng.<br />
Elbayoumi Ali Ez Eldeen who was replaced by Eng. Mohamed Elbakry and Eng. Akmal Badie<br />
Henein provided technical assistance support to the Mansoura IWRM <strong>II</strong> Regional Office during Year<br />
3. Dr. Tom S. Sheng (CADI), Water Resources Information Specialist, provided expatriate STTA<br />
support. Activities carried out during Year 3 include:<br />
• Maintenance support for the data loggers installed at 11 telemetry sites continued.<br />
Installation of eight additional data loggers procured in 2010 was completed. Procurement of<br />
additional eight data loggers was completed and inspected. Inspection surveys for<br />
installation of the eight data loggers were conducted and 4/8 were installed. A total of 27<br />
data loggers have been procured for MWRI by the project to date. Procurement of additional<br />
data loggers will take place in Year 4.<br />
• Under the MISD activity bi-weekly crop data for each branch canal is being collected by<br />
MALR and transferred to all 45 IWMDs.<br />
• Calibrations were completed at all sites during the year and review of the results is ongoing.<br />
Water Flow measurements continued at the 104 inflow/outflow sites to confirm and<br />
improve the calibration results.<br />
• Water Quality monitoring is ongoing at 289 monitoring sites. All IWMDs are collecting data<br />
and entering it into the data base. Some districts report that they utilize the results to shift or<br />
blend sources when quality is poor.<br />
• Water levels are being entered in the Water Level database in all 45 IWMDs. The eight<br />
Directorates are consolidating the data at the Directorate level. Only 37 of 45 IWMDs were<br />
calculating the water volume from the WL data base at the end of the year. In some cases,<br />
calibration equations have not been entered into the data base and in others the calculation<br />
of volume gives results that are not reasonable. The latter case is being investigated by the<br />
project and district staff.<br />
• Review and consolidation of the canal and drain network digital maps is on-going, 36 of 45<br />
IWMDs completed their maps consisting of 11 layers and are under review. The remaining<br />
IWMDs are all working to complete their maps.<br />
• Ground Water Monitoring Training course was completed (7/7 events). At request of the<br />
head of the Irrigation Department instructions to the Dakahlia undersecretary, the 13<br />
IWMDs in E. & W. Dakahlia included the unlicensed well data in the GW inventory.<br />
• The Digital Map Branch Canal Area Survey Training Course was completed (7/7 events).<br />
• The Ground Water Data Base training course was completed, 7 events.<br />
• Water Level & Complaints Follow up training was completed.<br />
• Complaints are being entered in the complaints databases in all 45 IWMDs. The directorates<br />
are consolidating the data.<br />
• Eng. Osama Mahmoud and Eng Mohamed Hassan from MWRI’s Information Center (MIC)<br />
visited the directorates and all IWMDs to follow up on resolving software problems with the<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 15
water level and complaints databases, and to provide refresher training on the data bases<br />
during the 8 – 22 August period however analysis and use of the data in decision making is<br />
not being done..<br />
• Water Recourses Inventory training course was completed, 7 events.<br />
• Ground Water Monitoring Follow up training course was completed, 5 events.<br />
• Ground Water Database (Directorate Version) was completed, 5 events.<br />
• Water Quality Monitoring follow up training course is ongoing, 4/7 event completed.<br />
• Water Distribution Team coordination meetings held, 17 events, attended by the General<br />
Directorate’s Water Distribution teams in addition to representatives from the<br />
undersecretary’s technical offices. Eng. Nabil Fawzi attended the meetings; Dr. Khaled<br />
Toubar (project coordinator) attended some of the meetings.<br />
Task 2.3 PMP Indicators and Targets<br />
Year 1 Year 2 Year 3<br />
Task Indicator Units Baseline Target Actual Target Actual Target Actual<br />
2.3 Establishment of information Management Systems for Sustainable Water Resources Management<br />
2.3.a Number of IWMDs with<br />
calibrations for all<br />
authorized inflow and<br />
Number 0 0 0 45 0 45 45<br />
outflow structures<br />
2.3.b Number of IWMDs with<br />
MISD installed and Number 0 0 0 45 0 45<br />
45<br />
operational<br />
2.3.c Number of IWMDs with<br />
completed and<br />
approved water<br />
Number 0 0 0 0 0 45 0<br />
resource management<br />
plan<br />
2.3.d Number of IWMDs with<br />
water resource<br />
information systems<br />
Number 0 0 0 45 0 45 45<br />
installed and operational<br />
2.3.e Number of branch<br />
canals with flows Number 0 0 0 0 1 2 1<br />
monitored by IWMD<br />
1. All systems the project is responsible for have been installed. The ADSL service that MWRI is<br />
responsible for is lacking at 18 of the 45 districts.<br />
TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />
Dahlia Hamdy (LTTA, Training Specialist) is the coordinator for this Task. Activities carried out<br />
during Year 3 include:<br />
• A total of 21 persons have participated in the M.S. degree program (seven at American<br />
University Cairo (AUC) and 14 at local universities) as shown in the table below.<br />
• Two participants have completed their master degree program at local universities bringing<br />
the present total enrollment in the local university program to 12 persons.<br />
• In the AUC M.S. Degree program, seven persons are currently enrolled: Environmental<br />
Engineering (two persons), Master of Engineering (four persons), and Intensive English (one<br />
person).<br />
16 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
• Financial and logistical support for M.S. Degree Program participants continued throughout<br />
the year.<br />
• TrailNet data was updated on a quarterly basis during the year.<br />
• A Study Tour to USA for nine MWRI Engineers selected from the IWRM areas of both<br />
IWRM I & IWRM <strong>II</strong> of the project was completed January 11-19, 2011. The project assisted<br />
USAID and their TA Contractor GETF with arrangements for the study tour. A reentry<br />
meeting was held at USAID on April 12 for the nine MWRI engineers who participated in<br />
the Study Tour.<br />
The USAID Mid-Term Evaluation recommended that no new participants be considered and that<br />
the remainder of this task be devoted to supporting the participants in place in the winter of 2011.<br />
The project is complying with that recommendation.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 17
Task 2.4 - Capacity Building of MWRI Personnel –<br />
Graduate Degree Training Status of Participants<br />
Name<br />
American University of Cairo:<br />
Position University Department Field of Study<br />
Required<br />
Degree<br />
Status<br />
Expected<br />
Graduation<br />
Mohamed Ibrahim El Hamrawy<br />
Assist. Director of<br />
Works ‐ Salhiya<br />
Irrigation Directorate<br />
American<br />
University in<br />
Cairo<br />
Department of<br />
Construction and Environmental<br />
Architectural System Design<br />
Engineering<br />
Master of<br />
Engineering<br />
Full‐Time Student<br />
Currently OVERALL<br />
GPA 3.3<br />
Courses in Progress<br />
Spring 2012<br />
1<br />
2<br />
Said Riyad Said<br />
Research Assist. ‐<br />
Water Mangement<br />
Research Institute‐<br />
National Water<br />
Research Center<br />
American<br />
University in<br />
Cairo<br />
Department of<br />
Construction and Environmental<br />
Architectural Engineering<br />
Engineering<br />
Master of<br />
Science<br />
Full‐Time Student<br />
Satisfactory<br />
Progress<br />
Currently OVERALL<br />
GPA 3.48<br />
Spring 2012<br />
Yasser Abdel Qader Aly<br />
3<br />
Civil Engineer ‐ Nile<br />
Protection Sector<br />
American<br />
University in<br />
Cairo<br />
Department of<br />
Construction and Environmental<br />
Architectural System Design<br />
Engineering<br />
Master of<br />
Engineering<br />
Full‐Time Student<br />
Satisfactory<br />
Progress<br />
Currently OVERALL<br />
GPA 3.663<br />
Spring 2012<br />
Amr Mohamed Fareed<br />
4<br />
Civil Eng. at the<br />
Irrigation Dept. ‐<br />
Technical Office ‐<br />
MWRI<br />
American<br />
University in<br />
Cairo<br />
Department of<br />
Construction and Environmental<br />
Architectural System Design<br />
Engineering<br />
Master of<br />
Engineering<br />
Part‐Time Student<br />
Currently OVERALL<br />
GPA 3.175<br />
Spring 2012<br />
5<br />
6<br />
Nabil Nassif Faragalla<br />
Ashraf El Shorbagy<br />
Amira Galal<br />
7<br />
Egyptian Institutions:<br />
Water Distribution<br />
Eng. ‐ Tanta<br />
Civil Engineer ‐ Main<br />
Information Center‐<br />
MWRI Cairo<br />
Civil Eng. ‐ Planning<br />
Sector ‐ MWRI<br />
1 Amina Yehia Zaghloul Civil Eng. ‐ Egyptian<br />
Public Authority for<br />
Civil Eng. ‐ Egyptian<br />
Osama Mohamed Awaida Public Authority for<br />
2<br />
Drainage Projects<br />
3 Throya Hasseeb Zaki Chemical Eng. ‐ Central<br />
Laboratory for<br />
l<br />
4 Anwar Amin Ibrahim Director of Work ‐<br />
General Directorate<br />
f I i ti<br />
5 Magdy El Shahat Civil Eng. ‐ Zagazig<br />
Integrated Water<br />
Researcher Assist. ‐<br />
Nile Research Institute ‐<br />
Heba Mohamed Abdel Aziz feb20<br />
National Water<br />
Research Center<br />
6<br />
7<br />
Wael Mohamed Ahmed<br />
Researcher Assist. ‐<br />
Nile Research Institute ‐<br />
National Water<br />
Research Center<br />
8 Mohamed Aly Hamed Researcher Assist. ‐<br />
Nile Research Institute ‐<br />
Researcher Assist. ‐<br />
Nile Research Institute ‐<br />
Ahmed Said Mohamed May 2012<br />
National Water<br />
Research Center<br />
9<br />
Researcher Assist. ‐<br />
Nile Research Institute ‐<br />
Shaimaa El Sherbeeny may 201<br />
National Water<br />
Research Center<br />
10<br />
11<br />
Maha Mohamed El Ameen june<br />
Researcher Assist. ‐<br />
Nile Research Institute ‐<br />
National Water<br />
Research Center<br />
Researcher Assist. ‐<br />
Nile Research Institute ‐<br />
Marwa Mamdouh Ahmed june20<br />
National Water<br />
Research Center<br />
12<br />
Integrated Water<br />
Soha Mostafa<br />
Resources<br />
13<br />
Management Unit ‐<br />
14<br />
Eman Abdel Aziz Abdel Lateef<br />
Assistant Manager‐<br />
Civil Eng. ‐ Central<br />
Directorate for<br />
Maintenance<br />
American<br />
University in<br />
Cairo<br />
American<br />
University in<br />
Cairo<br />
American<br />
University in<br />
Cairo<br />
Cairo<br />
University<br />
Cairo<br />
University<br />
Cairo<br />
University<br />
Menoufia<br />
University<br />
Zagazig<br />
University<br />
Ain Shams<br />
University<br />
Shoubra<br />
University<br />
Ain Shams<br />
University<br />
Azhar<br />
University<br />
Ain Shams<br />
University<br />
Ain Shams<br />
University<br />
Ain Shams<br />
University<br />
Zagazig<br />
University<br />
Shoubra<br />
University<br />
Department of<br />
Construction and Environmental<br />
Architectural System Design<br />
Engineering<br />
Department of<br />
Construction and Environmental<br />
Architectural System Design<br />
Engineering<br />
Department of<br />
Construction and Environmental<br />
Architectural Engineering<br />
Engineering<br />
Engineering<br />
Engineering<br />
Chemical<br />
Engineering<br />
Irrigation &<br />
Hydraulics<br />
Engineering<br />
Hydraulics<br />
Hydraulics<br />
Hydraulics<br />
Hydraulics<br />
Hydraulics<br />
Hydraulics<br />
Water<br />
Engineering &<br />
Water Structure<br />
Civil Engineering<br />
Master of<br />
Engineering<br />
Master of<br />
Science<br />
Master of<br />
Science<br />
Integrated Water M.Sc.of<br />
Resources Science<br />
Integrated Water<br />
Resources<br />
Management<br />
Chemical<br />
Engineering<br />
Irrigation &<br />
Hydraulic<br />
M.Sc.of<br />
Science<br />
M.Sc.of<br />
Science<br />
M.Sc.of<br />
Science<br />
E i i<br />
Climate Exchange M.Sc.of<br />
Science<br />
Hydraulic<br />
Engineering<br />
Hydraulic<br />
Engineering<br />
Hydraulic<br />
Engineering<br />
Hydraulic<br />
Engineering<br />
Hydraulic<br />
Engineering<br />
Hydraulic<br />
Engineering<br />
Hydraulic<br />
Engineering<br />
Water<br />
Engineering &<br />
Water Structure<br />
M.Sc.of<br />
Science in<br />
Civil<br />
Engineering<br />
M.Sc.of<br />
Science in<br />
Civil<br />
Engineering<br />
M.Sc.of<br />
Science<br />
M.Sc.of<br />
Science in<br />
Civil<br />
Engineering<br />
M.Sc.of<br />
Science in<br />
Civil<br />
Engineering<br />
M.Sc.of<br />
Science in<br />
Civil<br />
Engineering<br />
M.Sc.of<br />
Science in<br />
Civil<br />
Engineering<br />
M.Sc.of<br />
Science<br />
M.Sc.of<br />
Integrated Water Science in<br />
Management Civil<br />
Engineering<br />
Part‐Time Student<br />
Currently OVERALL<br />
GPA 3.00<br />
Part‐Time Student<br />
Currently OVERALL<br />
GPA 3.75<br />
Intensive English<br />
Language Courses<br />
Summer 2012<br />
Summer 2012<br />
Summer 2012<br />
on‐going Spring 2012<br />
on‐going Spring 2012<br />
on‐going Spring 2012<br />
on‐going Fall 2012<br />
on‐going Fall 2012<br />
Working on thesis Fall 2011<br />
Completed and<br />
submit his thesis<br />
Completed and<br />
submit his thesis<br />
Spring 2011<br />
Summer 2010<br />
Working on thesis Spring 2012<br />
Working on thesis Fall 2011<br />
Working on thesis Spring 2012<br />
Working on thesis Spring 2012<br />
on‐going Spring 2012<br />
on‐going Fall 2012<br />
18 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
Task 2.4 PMP Indicators and Targets<br />
Task Indicator Units Baseline Year 1 Year 2 Year 3<br />
2.4 Capacity Building of MWRI Personnel<br />
Target Actual Target Actual Target Actual<br />
2.4.a Candidates selected Number 0 20 20 50 36 50 36<br />
2.4.b<br />
2.4.c<br />
Candidates accepted by<br />
American University Cairo<br />
and local universities<br />
Candidates graduated with<br />
M.S. degrees<br />
Number 0 20 15 50 20 50 32<br />
Number 0 0 0 0 0 0 2<br />
MONITORING AND EVALUATION<br />
Dr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) is<br />
the coordinator for this Task. Dr. Mark Svendsen (IRG), Monitoring and Evaluation specialist,<br />
provides Expat STTA support. Activities carried out during Year 3 include:<br />
• The checklist for evaluating IWMD performance prepared and utilization of the checklist<br />
started.<br />
• Dr. Svendsen visited the project from July13-19 to provide STTA support to the project.<br />
• An addendum to the project PMP setting out a new set of indicators to measure the capacity<br />
and performance of BCWUAs and IWMDs was prepared by Dr. Svendsen and submitted to<br />
USAID.<br />
• Dr. Svendsen, Dr. Wadie, and Andrew Tczap met twice with the USAID COTR and Ms.<br />
Amani Selim, USAID Senior M&E Specialist, to discuss the PMP indicators in relation to the<br />
recommendations of the Mid-Term Evaluation. The new indicators related to organizational<br />
performance and the plan to monitor the indicators was presented, discussed, and approved<br />
at these meetings.<br />
• Dr. Abd El Motaleb, MWRI Coordinator, attended a debriefing by Dr. Svendsen. He<br />
supported the M&E activities, and requested that IWRM <strong>II</strong> draft a letter to be addressed to<br />
all IWMDs asking for support in obtaining requested data. Dr. Motaleb encouraged the<br />
project to continue introducing the concept of managing water resources based on volume<br />
instead of water level.<br />
• The M&E team discussed possible collaboration between IWRM <strong>II</strong> and CDIAS on M&E<br />
activities related to BCWUAs with Eng. Nagwa El Khashab, Chairperson of CDIAS. No<br />
decision was reached and the concept is under consideration.<br />
• IWRM <strong>II</strong> started to collect information on crop area, productivity, and farm gate prices in<br />
each district from the MALR Information Center for the summer 2009 and winter<br />
2009/2010 seasons. Work on utilization of the checklist for evaluating IWMD performance<br />
continued.<br />
• A purchase order with EL Zanaty Associates was signed for conducting a field survey of<br />
farmers and for focus group meetings with BCWUA boards. These will cover the IWRM <strong>II</strong><br />
area and the two IWRM I supported directorates in Lower Egypt. The survey was designed<br />
to be a follow-on to the baseline survey previously completed. The draft report of the study<br />
was submitted in mid-December and is presently under review.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 19
EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND PARTICIPATION<br />
Cheryl Groff (Senior Strategic Communication Specialist) was the IRG coordinator for this Task.<br />
She was supported by Mr. Abdel Bary on a short-term consulting basis when needed. Ms. Groff<br />
completed her assignment on June 30 and Mr. Bary will continue to provide short-term consulting<br />
services to the project as needed in Year 4. To the extent possible she worked in collaboration with<br />
the MWRI Water Communication Unit (WCU). Activities carried out during Year 2 include:<br />
• Give-away promotional items with the USAID Hand-in-Hand logo were produced and<br />
distributed.<br />
• Updating of the IWRM <strong>II</strong> website (http://iwrm2eg.org) continued during the year.<br />
• A Stakeholder Assessment was conducted to assess awareness product needs and<br />
effectiveness of the communications program conducted to date. Results were used to<br />
prepare the communications work plan for Year 4.<br />
• An eight-page newspaper supplement to celebrate World Environment Day was designed,<br />
produced and included in every issue of Al Ahram newspaper issued on June 8.<br />
• Continued preparation of awareness materials to support Task 1.3. A 12-page newspaper<br />
targeted to BCWUAs members, IWMD staff, and local population, and a 15- minute video<br />
for farmers was completed in the year. Production of a guide for water conservation<br />
technologies oriented to IWMD staff for use with BCWUA members started and will be<br />
completed in early 2012. Design of a poster on water conservation technologies targeted to<br />
farmers was initiated with completion planned for early 2012.<br />
• The IWRM East Delta map produced and distributed to all Directorates, Under Secretaries,<br />
and IWMDs in Year 2 was updated.<br />
• Periodic field visits to IWMDs and BCWUAs continued throughout the year to observe<br />
training, discuss communication needs, encourage IWMD staff, and initiate gathering of<br />
success stories for further dissemination.<br />
• 10-week (2 session/week) training for five WCU staff on the video editing program, Final<br />
Cut Pro, was completed in January 2011.<br />
TRAINING<br />
Dahlia Hamdy (LTTA, Training Specialist) is coordinator for this component. She was assisted by<br />
Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist), Dr. Wadie Fahim<br />
Mankarious (LTTA Senior Organization/Institutional Development Specialist) and the IWRM <strong>II</strong><br />
Regional Office staff. Activities carried out during Year 3 include:<br />
• Updated and supported the IWRM <strong>II</strong> Training Work Plan for Year 3.<br />
• Organized all training courses and prepared provider POs as required.<br />
• Organized and sponsored the Y4 Annual Workplan Workshop held on November 16-18,<br />
2011 at the Movenpick El Sokhna Resort.<br />
• Updated TraiNet on a quarterly basis.<br />
• Assisted in arrangements for a Study Tour to the United States sponsored and arranged by<br />
USAID for nine persons representing IWM Directorates and Districts from both phases of<br />
the project, IWRM I and IWRM <strong>II</strong>. The study tour was successfully conducted from 11-19<br />
January 2011.<br />
• Prepared Training Work Plan for Year 4.<br />
20 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
The following table shows details on the number of courses and participants who have been trained<br />
during the life-of-project, excluding seasonal and monthly meetings.<br />
Year Courses Events Training Participants Male Female<br />
Days<br />
1 12 88 268 2643 1897 746<br />
2 27 117 227 3024 2556 468<br />
3 18 118 163 4112 3180 932<br />
Total 57 380 658 9779 7633 2146<br />
Training conducted during Year 3 is listed below:<br />
Dur.<br />
(days) /<br />
Event<br />
No. of<br />
Part.<br />
No. of<br />
Females<br />
Code Course Title Task Event<br />
Date<br />
Task # 1.1 FORMATION AND DEVELOPMENT OF BRANCH CANAL <strong>WATER</strong> USER ASSOCIATIONS<br />
1 BCWUA's Activation Follow-Up & Dev.of IMP 1.1 7 1 Q1 267 109<br />
2 BCWUA's Chairperson Activation Workshop 1.1 7 1 Q1 772 93<br />
3 BCWUA's Women Board Members Orientation 1.1 7 1 Q2 255 181<br />
4 Participatory Water Management Phase I 1.1 7 2 Q3 260 52<br />
5 BCWUAs PWM Implementation Phase <strong>II</strong> 1.1 7 1 Q4 251 95<br />
Task # 1.3 IMPROVEMENTS IN <strong>WATER</strong> PRODUCTIVITY AND EFFICIENCY<br />
6 Staff building capacity for HVCs (High Value Crops)<br />
1.3 8 1 Q2/3/4 270 30<br />
7<br />
Dissemination of information on High Value Crops &<br />
Water Conservation Technologies<br />
1.3 15 1 Q2/3/4 832 35<br />
Irrigation System Workshop 1.3 1 1 Q4 23 3<br />
8<br />
Task # 2.2 FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong> <strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />
9 Basic Management Skills 2.2 8 2 Q1/2 279 76<br />
10 Advanced Computer Skills 2.2 7 2 Q4 88 19<br />
Task # 2.3 ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong> SYSTEMS FOR SUSTAINABLE <strong>WATER</strong><br />
11 Digital Map BC Area Survey 2.3 7 3 Q1 109 48<br />
12 Ground Water Database 2.3 7 2 Q2 103 52<br />
13 Water Level & Complaints Database Follow-Up 2.3 7 1 Q2 105 61<br />
14 Water Resources Inventory 2.3 7 1 Q4 160 12<br />
15 Ground Water Monitoring Follow-Up 2.3 5 1 Q4 106 19<br />
16 Ground Water Database (Directorate Version) 2.3 5 1 Q4 106 19<br />
17 Water Quality Monitoring 2.3 4 1 Q4 66 18<br />
Cross Cutting Task<br />
18 Field Survey Data Collectors M&E 2 2 Q4 60 10<br />
19 IWRM <strong>II</strong> Y4 Annual WP Workshop<br />
Cross<br />
Cutting 1 2 Q4 52 13<br />
PROCUREMENT<br />
Mrs. Amany Mahmoud (Office and Personnel Manager) is the coordinator for this activity. She is<br />
assisted by Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist), Eng. Safaa<br />
Khodary (IT Specialist) and the Regional Office staff. Firras Traish, Procurement/Financial<br />
Specialist, is supporting the project as IRG HO backstop.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 21
Practically all of the required commodities for IWMDs and Directorates were procured at the end of<br />
Year 2 at less than the budget allocated to this activity. Discussions were held early in Year 3<br />
regarding how to use the remaining budget but no consensus was reached. Therefore procurement<br />
during Year 3 consisted of purchasing a few items and planning for completing the procurement in<br />
Year 4. Activities carried out during the Year 3 include:<br />
• Procurement in accordance with the procurement plan continued.<br />
• Eight additional data loggers (8) and modems (6) were procured, delivered, and installation<br />
was completed for four of them at the end of the year.<br />
• One air conditioner was procured for the Qualubiya Directorate Meeting Room.<br />
• Books on high value crops were procured from MALR for distribution to DCWUAs.<br />
• Equipment repairs and purchase of consumables was carried out for IWMDs and<br />
Directorates.<br />
• Computer maintenance tool kits were procured for all 45 IWMDs and eight Directorates.<br />
• Give-away with the USAID Hand-in-Hand logo promotional items were designed, produced<br />
and distributed.<br />
Status of the procurement is shown Annex F: Procurement Status Report.<br />
22 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
3. ACTIVITIES PLANNED FOR<br />
NEXT QUARTER<br />
TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />
CANAL <strong>WATER</strong> USER ASSOCIATIONS<br />
The following activities are planned for the next quarter:<br />
• Monitor and provide support IWRM I BCWUAs.<br />
• Assist/support CDIAS to conduct BCWUA women board member strengthening – Training<br />
of Trainers (TOT).<br />
• Collect IWMD/General Directorate and BCWUAs documentation and archive the results in<br />
a database. Install the database at the local level and in Cairo.<br />
• Participate in summer seasonal meetings and BCWUAs chairpersons’ workshops.<br />
• Conduct Water Advisory Team coordination meetings.<br />
TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />
DRAIN MAINTENANCE<br />
No activities.<br />
TASK 1.3: IMPROVEMENTS IN <strong>WATER</strong> PRODUCTIVITY AND<br />
EFFICIENCY<br />
The following activities are planned for the next quarter:<br />
• Continue providing TA and monitoring the activity in the two areas where the pilot activity<br />
was conducted.<br />
• Jointly with the communications staff, prepare the awareness material on water-saving<br />
technologies for dissemination to the MWRI staff, MALR Staff and BCWUAs.<br />
TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />
No activities.<br />
TASK 2.1: REGIONAL <strong>WATER</strong> <strong>MANAGEMENT</strong><br />
ORGANIZATIONS<br />
No activities.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 23
TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />
<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />
The following activities are planned for next quarter:<br />
• Continue follow-up meetings with IWMDs to check on status and provide support.<br />
• Participate in monthly Directorate meetings.<br />
• Participate in monthly water advisory meetings.<br />
• Participate in monthly maintenance meetings.<br />
• Continue supporting the district and directorate office equipment Operation and<br />
Maintenance (O&M) program.<br />
• Conduct Administration of Contract training course (7 events).<br />
• Conduct Drainage Works training course (7 events).<br />
• Participate in January & June IWRM I evaluation meetings in five General Directorates.<br />
TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />
SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>RESOURCE</strong>S<br />
<strong>MANAGEMENT</strong><br />
The following activities are planned for next quarter:<br />
• Dr. Tom Sheng, Computer Assisted Development Inc., Expat Senior Water Resources<br />
Management Information Systems Specialist will carry out an assignment to assist with Year<br />
4 implementation activities.<br />
• Continue developing water resource databases and support consolidation of the databases at<br />
the Directorate level.<br />
• Complete ongoing Water Quality Monitoring follow-up training course (3 events).<br />
• Conduct Digital Mapping refresher training (8 events).<br />
• Complete installation of additional four data loggers. Finalize selecting the additional new<br />
nine sites and finalize the procurement and installation stages of the nine new data loggers<br />
for the new sites.<br />
• Complete calculating the water volume from the Water Level data base in the eight IWMDs<br />
that are not doing so in 2011.<br />
• Complete collecting the Water Resources Inventory data sheets from all IWMDs.<br />
• Conduct Water Budget and IWRM Plan training course.<br />
• Complete preparing and revising the digital map 11 layers in the remaining nine IWMDs and<br />
review all layers prepared by the other 36 IWMDs.<br />
• Selection of one pilot branch canal in each of the seven target remaining Directorates to test<br />
different flow measurement techniques, structures, and types of equipment. Assess the<br />
results and prepare guidelines.<br />
24 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
• Attend monthly water distribution meetings.<br />
TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />
The following activities are planned for next quarter:<br />
• Monitor progress of the trainees.<br />
• Provide financial and logistical support for trainees.<br />
MONITORING AND EVALUATION<br />
The following activities are planned for the next quarter:<br />
• Complete analysis of the farmer survey data and finalize the survey report.<br />
• Assemble relevant secondary M&E data from all project IWMDs.<br />
• Continue monitoring district performance profiles prepared by IWMDs.<br />
• Continue collection of secondary MALR agricultural data for E. Nile Delta available for 2009<br />
& 2010.<br />
• Complete collection of crop water requirement data from MISD database for year 2010 &<br />
2011.<br />
• Back calculate water delivery data from water level data at calibrated inflow/outflow<br />
equations for 2009 if possible.<br />
EDUCATION, COMMUNICATION, PUBLIC AWARENESS, AND PARTICIPATION<br />
The following activities are planned for the next quarter:<br />
• Support all training courses as needed.<br />
• Finalize high-value, low-water crop communication materials.<br />
• Collect, compile, and produce Success Stories.<br />
TRAINING<br />
The following training courses are planned for next quarter:<br />
ID Course Title Task Events Venue<br />
1.1.4.1 BCWUAs Women Board Members Strengthening TOT 1.1 7 Each Directorate<br />
2.2.4.1 Administration of Contract 2.2 7 Each Directorate<br />
2.2.4.2 Drainage Works 2.2 7 Each Directorate<br />
2.3.4.1 Water Budget / IWRM Plan 2.3 7 Each Directorate<br />
2.3.4.2 Information-based Water Management 2.3 7 Each Directorate<br />
2.3.4.3 Data Logger Maintenance 2.3 5 Each Directorate<br />
PROCUREMENT<br />
As stated previously there is budget available for additional procurement. MWRI was requested to<br />
submit a prioritized list of items they require for IWRM I and IWRM <strong>II</strong> districts/directorates. The<br />
list was not received as of writing this report although several items have been identified. Therefore,<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 25
the Year 4 procurement activities will not be finalized until early in Year 4. The preliminary<br />
procurement activities for next quarter include:<br />
• Continue procurement process. Purchase, deliver, and transfer all equipment to IWMDs and<br />
IWM Directorates in accordance with the procurement plan.<br />
• Procure, deliver, and support installation for 16 new data loggers.<br />
• Procure licensed version of AutoCad Map software for all districts in IWRM <strong>II</strong>.<br />
• Procure replacement computers and accessories for IWRM I.<br />
• Other as defined by MWRI and approved by USAID.<br />
26 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
4. PROBLEMS AND ISSUES<br />
GENERAL<br />
Several issues require attention by the project and MWRI, as follows:<br />
1. It appears that some MWRI field staff believe that implementation of IWRM does not<br />
have the support of MWRI top management. As a result, some MWRI field (a minority)<br />
staff are not following through on activities that are critical to IWRM, which causes delays<br />
and substandard outputs.<br />
2. Full integration is not taking place in some areas. EPADP still retains responsibility for<br />
larger drains and retains some staff and equipment. Drainage equipment that has been<br />
transferred to the districts, especially the sub-surface drainage flushing machines, are totally<br />
unusable in some cases and the districts do not have budget to repair them. Also, some<br />
staff transferred from EPADP to the IWMDs would prefer to remain under EPADP and<br />
since t not all drainage responsibilities have been transferred to the districts, they hold some<br />
hope of transferring back to EPADP. This results in sub-standard performance of the<br />
IWMD drainage staff in some cases.<br />
3. Some of the newly formed IWMDs do not have adequate human and financial resources to<br />
function properly.<br />
4. Staff reassignments and other factors require ongoing refresher training and re-training in<br />
some cases. The project will focus on this issue in the remaining life-of-project but a longterm<br />
plan should be developed by MWRI.<br />
The major issue that adversely impacted implementation progress revolves around the Ministry’s<br />
Integrated Water Management Unit (Unit) that effectively contributed to the success of IWRM I.<br />
Originally, the Unit was expected to take the lead and play a major role on behalf of MWRI in<br />
implementing IWRM <strong>II</strong>. However, the project started work on January 25, 2009 but the<br />
Implementation Letter funding the Unit was not signed by USAID until August of 2009. This led to<br />
restricted input from the Unit during that eight-month period. Additionally, there was a change in<br />
the Director of the Unit in March 2009, which resulted in a learning curve for the new Director. The<br />
Unit made beneficial contributions to implementation from August 2009 until April 2010 when the<br />
USAID funding was terminated. MWRI disbanded the Unit in September 2010 and its staff were<br />
reassigned to other sectors in the Ministry. At IRG’s request, several of the IWMU staff were placed<br />
on official leave without pay and subsequently hired by IWRM <strong>II</strong>, to continue the work of the former<br />
IWMU. Though this move allowed the project to continue implementing technical aspects of the<br />
project, the critically important MWRI/IRG linkage provided by the full-time IWMU Director<br />
has not been effectively compensated for to date. MWRI addressed this by assigning a part-time<br />
Project Coordinator to re-establish that linkage but the workload associated with project<br />
coordination is great and a part-time coordinator with limited part-time support cannot be as<br />
effective as the Unit was. Additionally, there have been three different project coordinators in 2011<br />
which has led to some loss of efficiency. The situation stabilized in August 2011 and project<br />
performance has improved since then.<br />
TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />
CANAL <strong>WATER</strong> USER ASSOCIATIONS<br />
No problems or issues to report.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 27
TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />
DRAIN MAINTENANCE<br />
No problems or issues to report.<br />
TASK 1.3: IMPROVEMENTS IN <strong>WATER</strong> PRODUCTIVITY AND<br />
EFFICIENCY<br />
The contract objectives have been met and there are no issues to report. However, it is important to<br />
note that the projects’ responsibility under this task was disseminating information on the<br />
cultivation of HVCs and the benefits/use of WCTs. IWRM <strong>II</strong> went beyond their contractual<br />
mandate and established limited pilot demonstration areas that proved the benefits of growing<br />
HVCs. This success has resulted in many requests to the project from farmer organizations within<br />
and outside of the pilot areas for support in switching to HVCs and implementing modern irrigation.<br />
Although it is beneficial to MWRI when farmers switch to lower water consuming crops, facilitating<br />
that is not in the Ministry’s mandate. If there is to be success in increasing water efficiency on a<br />
national scale through increasing HVCs acreage and modifying irrigation practices, continued<br />
efforts by MALR are needed to raise farmers’ awareness and to support them in transitioning to<br />
HVCs and adoption of WCTs.<br />
TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />
None.<br />
TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />
<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />
All 45 IWMDs have been formed, are operational; all are fully staffed at senior level. That said, there<br />
are issues. Among them, timely and adequate availability of financial resources is of particular<br />
importance. The new IWMDs have greater responsibilities than the irrigation districts they replaced.<br />
Therefore, their needs in terms of budget, facilities, and human resources are greater than before. To<br />
date, MWRI financial and technical support has not been provided in a timely manner nor have they<br />
been adequate to ensure that the newly created integrated directorates and districts can function as<br />
intended. Among other things, this has adversely affected maintenance of equipment provided by<br />
the project and maintenance/repair of MWRI’s equipment needed for canal and drains upkeep and<br />
maintenance of the sub-surface drainage network. This is an issue that must be given serious<br />
consideration when preparing the project sustainability plan.<br />
TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong> SYSTEMS<br />
FOR SUSTAINABLE <strong>WATER</strong><br />
The MISD data is not being transmitted from MALR to the IWMDs in a timely manner and the<br />
quality of the data delivered to the IWMDs on a bi-weekly bases is suspect in general. The MISD<br />
system was developed, tested, and successfully implemented during the Agricultural Policy Reform<br />
Program (APRP) project (1997-2002) and became government policy at that time. It also functioned<br />
well during IWRM I. Alternatives such as remote sensing are not considered practical and since<br />
MISD is a proven system, it is recommended that MWRI work with MALR to solve the problems<br />
that have been experienced during IWRM <strong>II</strong>.<br />
Preparation of digital maps is behind schedule and some of the completed maps have not been<br />
quality checked to date. Our Information Systems Specialist, Dr. Tom Sheng reviewed a limited<br />
sample of the completed maps during his last visit and found that they need further work and should<br />
28 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
not be considered final. The project cannot utilize resources from the private sector to perform<br />
quality assurance on the maps due to restrictions on sharing data with IRG. Therefore, we have been<br />
discussing the possibility of using the Ministry Information Center for this. Workload and other<br />
considerations have made MICs response inadequate. The project will continue to search for a way<br />
to perform the needed quality assurance effort but no solution exists as of the writing of this report.<br />
TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />
The project will not meet the objectives of this Task due to issues that arose in the early stages of the<br />
project that were never overcome. Out of 50 MWRI personnel programmed for enrollment in the<br />
M.S. Program, only 36 were identified by MWRI to participate. Only 20 of the 36 were accepted by<br />
universities and have been enrolled in M.S. programs. Two of the 20 participants have graduated to<br />
date and the project will continue to support the remaining 18 that are still pursuing their degrees.<br />
MONITORING AND EVALUATION<br />
Data collection has been slower than expected due to delays in installing the relevant data bases. In<br />
some cases the accuracy of data in-hand is suspect (MISD, cropped area) and in other cases the data<br />
must be back-calculated. The project is focusing on improving the quantity and quality of the M&E<br />
data and reasonable results are expected when the final M&E report is issued.<br />
EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND PARTICIPATION<br />
No problems or issues to report.<br />
TRAINING<br />
Because of summer water shortages and the need to have district staff in the field full time, MWRI<br />
requested all June, July and August 2011 training be postponed until September. In previous years,<br />
training was suspended for one month in summer and proceeded at a reduced pace in the other<br />
summer months. This postponement this year delayed implementation of certain components of the<br />
training program. IWRM <strong>II</strong> and MWRI are aware of this situation and accelerated the training<br />
program starting in September and the original program is close to being back on schedule. New<br />
training courses have been identified and will be conducted in Year 4 without detriment to the<br />
project schedule and outputs.<br />
PROCUREMENT<br />
Practically all the required commodities were procured in Years 1 & 2. Cost containment principles<br />
were put in place and the total cost to date has been significantly less than budgeted. It has been<br />
agreed to procure additional equipment for IWRM <strong>II</strong> directorates/districts with the remaining<br />
budget and also to procure replacement equipment for the IWRM I districts and directorates. This<br />
will required accelerated procurement to have everything purchased, delivered and installed prior<br />
to contract completion but no problem is foreseen in that regard.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 29
ANNEX A:MONITORING AND<br />
EVALUATION PLAN UPDATE<br />
Year 3<br />
(January – December 2011)<br />
30 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
TABLE OF CONTENTS<br />
PERFORMANCE MONITORING PLAN (PMP) .......................................................... 32<br />
AMENDMENT OF THE PMP ........................................................................................ 32<br />
PURPOSE ........................................................................................................................ 33<br />
IMPLEMENTATION INDICATORS ............................................................................. 33<br />
Table 1 - IWRM <strong>II</strong> Implementation Indicators, Water Users ..................................... 34<br />
Table 2 - IWRM <strong>II</strong> Implementation Indicators, Water Suppliers ............................... 35<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 31
PERFORMANCE MONITORING PLAN (PMP)<br />
The original Performance Monitoring Plan 1 (PMP)<br />
of the project was produced in July 2009 to guide<br />
the M&E program for the project. Its purpose<br />
was (a) to provide feedback to project managers<br />
during project implementation and (b) to provide a<br />
comprehensive and coherent information base<br />
which can be used to assess project outcomes.<br />
Definitions of some basic terms used in this report<br />
are shown in the box at right. More detail can be<br />
found in the PMP.<br />
The original PMP employed two types of<br />
indicators. Implementation (Process) indicators<br />
monitor the progress of the project. They deal<br />
with the pace of activities undertaken by the<br />
project. Outcome (Results) indicators assess the<br />
cumulative effects of project activities on the<br />
project’s objectives.<br />
M&E DEFINITIONS<br />
A goal is a broad statement of what a program<br />
would like to accomplish. It portrays a positive<br />
future condition.<br />
Objectives are specific, measurable, appropriate,<br />
realistic, and time-bound statements describing<br />
what the project hopes to accomplish.<br />
Indicators are objectively measurable gauges of<br />
progress toward achieving an objective or<br />
measuring the impact of a specific intervention.<br />
Targets are specific values of indicators that the<br />
program wishes to achieve through its actions.<br />
A baseline provides a starting point from which<br />
to measure progress.<br />
AMENDMENT OF THE PMP<br />
In early 2011, USAID conducted a Mid-term Evaluation of the IWRM <strong>II</strong> project. The final report of<br />
this evaluation, dated May 2011, contained a number of conclusions and recommendations that<br />
affected the original project’s performance monitoring and evaluation (M&E) activities. In response<br />
to the recommendations made in the evaluation report the project developed an addendum to the<br />
PMP to add a new class of indicators; Organizational indicators..<br />
The amended PMP now includes three classes of indicators. The first comprises implementation<br />
indicators, which report progress in implementing project tasks. The second comprises outcome<br />
indicators, which measure the degree of<br />
achievement of overall project objectives. These<br />
outcome indicators reflect the combined effects<br />
of the individual project tasks. The third class of<br />
indicators, here termed organizational indicators,<br />
measures changes in the capacity of two key<br />
organizations being developed and strengthened<br />
under the project – Branch Canal Water User<br />
Associations (BCWUAs) and Integrated Water<br />
Management Districts (IWMDs).<br />
The organizational indicators for BCWUAs are:<br />
• Governance processes<br />
• Accountability and participation<br />
• Operational performance<br />
o Water distribution<br />
o Maintenance<br />
o Conflict resolution<br />
INDICATOR CLASSES<br />
• Implementation indicators measure the inputs<br />
provided by the project to accomplish desired<br />
change<br />
• Organizational indicators measure the capacity<br />
and performance of the organizations which<br />
are key actors in the desired change process<br />
• Outcome indicators measure the combined<br />
results of project inputs and interventions<br />
relative to overall project objectives<br />
1 IRG. 2009. Performance Monitoring Plan, Report no. 6. Cairo: MWRI, IWRM <strong>II</strong> project.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 32
The organizational indicators for IWMDs are<br />
• General management<br />
• Communication<br />
• Water distribution<br />
• Maintenance<br />
A farmers satisfaction survey and focus group meetings will be used to collect information to<br />
populate the BCWUA organizational indicators. A formal survey of BCWUA members is being<br />
conducted in the fourth quarter of 2011. At the same time, focus-group interviews are being held<br />
with the Boards of the sample BCWUAs to obtain their perspective on BCWUA capacity and<br />
performance. Follow-up focus-group interviews with the Boards of the sample BCWUAs will be<br />
conducted in the second quarter of 2012 to assess changes resulting from additional capacity building<br />
support provided by the project during the first half of 2012, if desired. The survey is being<br />
administered in a sample of BCWUAs in a sample of IWMDs in all eight Directorates covered by the<br />
project. In addition, it covers two Phase I Directorates which are contiguous with the East Delta<br />
Phase <strong>II</strong> project area, West Sharkia in the center of the East Delta and New Zifta just across the<br />
Damietta Branch of the Nile in the Middle Delta 2 . Including these two Phase I Directorates has the<br />
distinct advantage of projecting Phase <strong>II</strong> BCWUAs about 5 years into the future to see what their<br />
status is likely to be at that point. It will also allow an assessment of the strengths and weaknesses of<br />
the Phase I BCWUAs to see where additional training might be needed and where changes in the<br />
authority granted to them might be needed.<br />
Information to populate the IWMD capability indicators will come from three sources. First,<br />
extensive records are presently kept of various aspects of IWMD progress and performance for<br />
internal project management purposes. These records will be mined as a primary source of data for<br />
the capability indicators. In addition, project regional offices will conduct interviews with District<br />
managers to gather additional information. Finally, information for some of the performance-based<br />
indicators would be drawn from the client satisfaction surveys.<br />
PURPOSE<br />
The purpose of this annex is to report on Implementation Indicators though Year 3 of the project.<br />
Output Indicators require analysis of a variety of data collected from several sources which is<br />
underway. These indicators will be reported on in the final M&E report. Organizational Indicators<br />
will be assessed subjectively based on the results of the second farmer survey that is presently<br />
underway and the final focus group discussion that will take place in April 2012. These will also be<br />
reported on in the final M&E report.<br />
IMPLEMENTATION INDICATORS<br />
Implementation indicators are used to monitor the execution of project activities. They monitor the<br />
inputs supplied by the project to achieve desired change. Because they are related directly to project<br />
inputs, they can be keyed to the project tasks. Implementation indicators and their present status,<br />
organized by project task, are shown in Tables 2, and 3. However, Tasks 1.2, 1.4, 2.1 were<br />
terminated in mid-Year 3 and Task 1.4 was cut back. The tables show the progress achieved up to<br />
the point these tasks were terminated.<br />
2 Each of these two Phase I Directorates comprises 5 IWMDs.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 33
Creation of the implementation indicators is simple and straightforward. Most are simply numbers of<br />
occurrences (e.g. “number of IWMDs with training centers established an equipped) which are<br />
summed across Districts and reported against targets.<br />
Target values have been established for the four years of the project for these indicators, together<br />
with a set of baseline values that represent pre-project conditions. In general, baseline values of the<br />
indicators used in this project are zero. Targets presented in the original PMP have been adjusted to<br />
reflect the recommendations of the USAID mid-term evaluation and new thinking based on<br />
experience in the first two years of implementation.<br />
IWRM <strong>II</strong> M&E Indicators<br />
Table 3 - IWRM <strong>II</strong> Implementation Indicators, Water Users<br />
Cumulative Targets and Accomplishments<br />
Task Indicator Units Baseline Year 1 Year 2 Year 3 Year 4<br />
1.1<br />
Target Actual Target Actual Target Actual Target Actual<br />
Formation and Development of Branch Canal Water User Associations (BCWUAs)<br />
1.1.a Number of IWMDs with staffed<br />
Water Advisory Teams<br />
Number 0 45 45 45 45 45 45 45<br />
1.1.b Number of GDs with staffed Water<br />
Advisory Teams<br />
Number 0 8 8 8 8 8 8 8<br />
1.1.c Share of planned BCWUAs<br />
established by Ministerial decree<br />
Percent 0 50 0 100 100 100 100 100<br />
1.1.d Share of BCWUAs with<br />
maintenance priorities and action Percent 0 0 0 50 0 100 100 100<br />
plans<br />
1.1.e Share of BCWUAs monitoring and<br />
reporting on Branch Canal water Percent 0 0 0 0 0 25 25 100<br />
supply<br />
1.2 Sustainable Local Financing for Canal and Drain Maintenance<br />
1.2.a Decree prepared and submitted<br />
for approval<br />
0/1 0 1 1 1 1<br />
1.2.b BCWUA cost sharing system<br />
guidelines submitted for approval<br />
0/1 0 1 0 1 0<br />
1.2.c Cost sharing system guidelines<br />
Number 0 0 0 0 0<br />
implemented on Branch Canals<br />
1.3 Improvements in Water Productivity and Efficiency<br />
1.3.a Number of farmers receiving<br />
training on High-Value Crops and Number 0 100 0 300 502 500 1125 800<br />
1.4<br />
water saving technology<br />
Wastwater Reuse<br />
1.4.a Feasibility plan submitted for<br />
approval<br />
0/1 0 1 0 1 1<br />
1.4.b Number of partnership<br />
agreements signed<br />
Number 0 0 0 0 0<br />
34 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
Table 4 - IWRM <strong>II</strong> Implementation Indicators, Water Suppliers<br />
IWRM <strong>II</strong> M&E Indicators<br />
Task Indicator<br />
Cumulative Targets and Accomplishments<br />
Baseline<br />
Year 1 Year 2 Year 3 Year 4<br />
Units<br />
Target Actual Target Actual Target Actual Target Actual<br />
2.1 Regional Water Management Organizations<br />
2.1.a Business plan submitted to MWRI<br />
for approval<br />
0/1 0 0 0 1 0<br />
2.1.b Business plan implemented 0/1 0 0 0 0 0<br />
2.2 Formation and Development of Integrated Water Management Districts (IWMDs)<br />
2.2.a Number of IWMDs established<br />
with fully staffed senior positions<br />
Number 0 45 45 45 45 45 45 45<br />
2.1.b Number of IWMDs with completed<br />
integrated maintenance plans<br />
Number 0 0 0 45 45 45 45 45<br />
2.2.c Number of IWMDs with a training<br />
room established and equipped<br />
Number 0 20 0 45 45 45 45 45<br />
2.2.d Number of General Directorates<br />
with a computer training center Number 0 8 4 8 8 8 8 8<br />
established and equipped<br />
2.2.e Number of IWRM I IWMDs<br />
participating in coordination Number 27 27 27 27 27 27 27 27<br />
meetings<br />
2.3<br />
2.3.a<br />
Establishment of information Management Systems for Sustainable Water Resources Management<br />
Number of IWMDs with<br />
calibrations for all authorized Number 0 0 0 45 0 45 45 45<br />
inflow and outflow structures<br />
2.3.b Number of IWMDs with MISD<br />
installed and operational<br />
Number 0 0 0 45 0 45 45 45<br />
2.3.c Number of IWMDs with completed<br />
and approved water resource Number 0 0 0 0 0 45 0 45<br />
management plan<br />
2.3.d Number of IWMDs with water<br />
resource information systems Number 0 0 0 45 0 45 45 45<br />
installed and operational<br />
2.3.e Number of Branch Canals with<br />
flows monitored by IWMD<br />
Number 0 0 0 0 1 4 1 8<br />
2.4 Capacity Building of MWRI Personnel<br />
2.4.a Candidates selected Number 0 20 20 50 36 50 36<br />
2.4.b Candidates accepted by American<br />
University Cairo and local<br />
Number 0 20 15 50 20 50 21<br />
universities<br />
2.4.c Candidates graduated with M.S.<br />
degrees<br />
Number 0 0 0 0 2<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 35
ANNEX B: ANNUAL FINANCIAL<br />
STATUS REPORT<br />
IWRM <strong>II</strong> - ANNUAL REPORT<br />
(OCTOBER-DECEMBER 2011)<br />
Contract No. EPP-I-00-04-00024-00 Task Order No. 06<br />
36 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
INTRODUCTION<br />
The tables following this page present a summary of the status of the project budgets based on actual<br />
invoices through October 28 with estimates for expenditures in November and December. It should<br />
be noted that IRG has submitted a proposed budget realignment to USAID/Egypt for approval.<br />
The budget realignment has not been approved by USAID to date and therefore this report<br />
continues to utilize the original budget breakdown which results in some items appearing to be<br />
overspent to a large degree. Once the realignment is agreed upon and approved, future financial<br />
reports will be based on the new reallocation of budget line items with no change in the total budget<br />
and the actual status of each line item will be more accurately reflected.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 37
USD BUDGET<br />
Budget Line Item Budgeted Obligated Current<br />
Claim<br />
(Oct.-Dec.)<br />
Claims to<br />
Date<br />
(Dec. 30)<br />
Projected<br />
Expenses for<br />
Next Quarter<br />
(Jan.-March)<br />
Remaining<br />
Budget<br />
Balance<br />
% Budget<br />
Claimed<br />
Salaries 1,121,498 39,224 898,948 38,991 222,550 80<br />
Overhead and<br />
Fringes<br />
345,848 12,975 353,362 11,998 (7,514) 102<br />
Consultant Labor 267,212 25,384 109,054 25,384 158,158 41<br />
Other Direct Costs 676,501 45,723 468,472 45,723 208,029 69<br />
Procurement 525,000 0 227,535 0 297,465 43<br />
G&A 611,710 32,997 551,750 32,997 59,960 90<br />
Subcontractors 188,487 27,890 197,140 81,500 (8,653) 105<br />
Remaining<br />
Obligation<br />
Balance<br />
% Obligation<br />
Claimed<br />
Subcontractor<br />
Handling<br />
7,539 1,260 8,553 3,667 (1,014) 113<br />
Subtotal 3,743,795 185,453 2,814,814 240,260 928,981 75<br />
Fixed Fee 187,190 9,273 140,741 12,013 46,449 75<br />
Adjustments 0 0 0 0 0 N/A<br />
Total Cost Plus Fixed 3,930,985 3,930,985 194,726 2,955,555 252,273 975,430 75 975,430 75<br />
Fee<br />
Source: IRG Invoices # 506101- 33; estimate of 34 & 35<br />
Note: Budget reallocation is presently in preparation and budget figures will change upon USAID approval of the reallocation.<br />
38 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
LE BUDGET<br />
Budget Line Item Budgeted Obligated Current<br />
Claim<br />
(Oct.-Dec.)<br />
Claims to<br />
Date<br />
(Dec. 30)<br />
Projected<br />
Expenses for<br />
Next<br />
Quarter<br />
(Jan.-March)<br />
Remaining<br />
Budget<br />
Balance<br />
% Budget<br />
Claimed<br />
Salaries 5,779,775 652,725 5,850,100 778,000 (70,325) 101<br />
Overhead and<br />
Fringe<br />
1,142,061 0 0 0 1,142,061 0<br />
Consultant Labor 2,554,435 0 0 0 2,554,435 0<br />
Other Direct Costs 9,445,842 997,090 8,468,027 675,000 977,815 90<br />
Procurement 7,000,000 202,000 5,514,387 575,000 1,485,613 79<br />
G&A 4,943,918 404,205 3,507,941 355,985 1,435,977 71<br />
Subcontractors 700,000 15,000 1,874,789 20,000 (1,174,789) 268<br />
Subcontract<br />
Handling<br />
0 9,765 332,513 26,775 (332,513) N/A<br />
Subtotal 31,566,031 2,280,785 25,547,757 2,430,760 6,018,271 81<br />
Fixed Fee 1,578,302 114,039 1,277,388 121,538 300,914 81<br />
Adjustments 0 0 0 0 0 N/A<br />
Total Cost Plus<br />
Fixed Fee<br />
Remaining<br />
Obligation<br />
Balance<br />
% Obligation<br />
Claimed<br />
33,144,333 33,144,333 2,394,824 26,825,145 2,552,298 6,319,188 81 6,319,188 81<br />
Source: IRG Invoices #506201-31; estimate of 32 and 33<br />
Note: Budget reallocation is presently in preparation and budget figures will change upon USAID approval of the reallocation.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 39
ANNEX C: TABLE OF REPORTS<br />
Life-of-Project Status as of December 2011<br />
Table of Reports Issued to Date<br />
No. NAME DATE<br />
1 Annual Work Plan Year 1(January – December 2009) March 2009<br />
2 Quarterly Report Year 1: 1st Quarter (January–March 2009) April 2009<br />
3 Economic Feasibility of Alternative Crops with Potential for the Reuse of<br />
Treated Wastewater in Egypt<br />
May 2009<br />
4 Communication Plan May 2009<br />
5 IWRM I BCWUA Assessment July 2009<br />
6 Performance Monitoring Plan July 2009<br />
7 Farmer Baseline Survey July 2009<br />
8 MWRI Training Needs Assessment July 2009<br />
9 Quarterly Report Year 1: 2nd Quarter (April – June 2009) July 2009<br />
10 Quarterly Report Year 1: 3rd Quarter (July – September 2009) October 2009<br />
11 Annual Work Plan Year 2 (January–December 2010) Dec. 2009<br />
12 Annual Report Year 1 (January–December 2009) Jan. 2010<br />
13 Quarterly Report Year 2: 1st Quarter (January–March 2010) April 2010<br />
14 Feasibility of Wastewater Reuse with Annexes June 2010<br />
15 Quarterly Report Year 2: 2nd Quarter (April – June 2010) July 2010<br />
16 Quarterly Report Year 2: 3rd Quarter (July –September 2010) Oct. 2010<br />
17 Annual Work Plan Year 3 (January–December 2011) (Final Dra) Dec. 2010<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
25<br />
26<br />
27<br />
Annual Report Year 2 (January–December 2010)<br />
Quarterly Report Year 3 : 1 st Quarter (Jan. – March 2011)<br />
Assessment of Communications Needs<br />
Quarterly Report Year 3 : 2 st Quarter (Apr. ‐ June 2011)<br />
Updated Communication Plan<br />
Introducing High Value/Low water consumption crops to East Delta<br />
Farmers<br />
Annual WP Year 4 ( Oct. 2011 – Sept. 2012)<br />
Quarterly Progress Report Yr 3 : 3 rd Quarter (July – Sept. 2011)<br />
Annual Work plan Workshop Report –Year 4<br />
Annual Report Year 3<br />
Jan. 2011<br />
April 2011<br />
June 2011<br />
July 2011<br />
July 2011<br />
Oct. 2011<br />
Oct. 2011<br />
Oct. 2011<br />
Dec. 2011<br />
Dec. 2011<br />
40 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
ANNEX D: TECHNICAL ASSISTANCE TABLE<br />
Life-of-Project Status as of December 2011<br />
Original<br />
(days)<br />
Approved<br />
(days)<br />
Used<br />
(days) Yr 1 Yr 2 Yr 3<br />
No. Name Position Firm Budget Task<br />
1 Jeffrey Fredericks Chief of Party (COP) IRG USD Cross-Cutting 996.0 996.0 466.5 237.5 260.0 -<br />
2 Andrew Tczap Home office Sr. Manager IRG USD Cross-Cutting 15.0 15.0 15.0 - - 15.0<br />
3 Andrew Tczap Chief of Party IRG USD 365.0 365.0 170.0 - - 170.0<br />
4 Craig Anderson Inst./Organizational Development Specialist IRG USD 22.0 22.0 22.0 - - 22.0<br />
5 Ken Swanberg Deputy Chief of Party (DCOP)/Agricultural Economist IRG USD Task 1.3, 1.4 780.0 780.0 80.0 80.0 - -<br />
6 Russ Misheloff Home Office Project Manager IRG USD Cross-Cutting 20.0 20.0 14.6 4.6 9.9 20.0<br />
7 Firras Traish Home Office Project Coordinator IRG USD Cross-Cutting 60.0 60.0 21.9 11.5 10.4 18.0<br />
8 Firras Traish Finance/Close-Out Specialist IRG USD Cross-Cutting: Admin 5.0 5.0 - - - -<br />
9 Russ Misheloff Senior Economist IRG USD Task 1.4 - - 19.1 1.0 18.1 -<br />
10 Firras Traish Procurement Specialist IRG USD Cross-Cutting: Procurement 10.0 10.0 24.0 15.0 9.0 -<br />
11 Cheryl Groff Senior Communications and Public Awareness Specialist IRG USD Task 2.4, Cross-Cutting: Public Awareness 101.0 260.0 250.0 - 250.0 130.0<br />
12 Darryl Kuhnle Communications and Public Awareness Specialist IRG USD Cross-Cutting: Public Awareness 30.0 30.0 30.0 30.0 - -<br />
13 Joan Ablett Communications and Public Awareness Specialist IRG USD Cross-Cutting: Public Awareness 9.0 9.0 8.8 8.8 - -<br />
14 Mark Svendsen Monitoring and Evaluation Specialist; IRG USD Cross-Cutting:M&E 90.0 90.0 51.9 36.9 15.0 18.0<br />
15 Jim Dempsey Institutional/Organizational Development Specialist IRG USD Task 1.4 50.0 27.0 27.0 15.4 11.6 -<br />
16 TBD Irrigation Agronomist IRG USD 70.0 - - - - -<br />
17 Stan Peabody Sociologist IRG USD Task 1.1,1.2,1.3 70.0 70.0 68.0 48.0 20.0 -<br />
18 Tom Sheng Water Resources MIS Specialist CADI USD Task 2.2,2.3 82.0 82.0 71.4 39.8 31.6 24.0<br />
19 Nabil Fawzi Senior Water Resource Management Specialist IRG EGP Task 1.1,1.2,2.1,2.2,2.3;Cross-Cutting: Procurement, Training 996.0 996.0 758.3 238.3 260.0 260.0<br />
20 Maher Khodary Senior Water Resources Management Specialist (Zagazig) IRG EGP Task 1.1,1.2,2.1,2.2,2.3 996.0 996.0 758.0 238.0 260.0 260.0<br />
21 Wadie Mankarious Senior Organization/Institutional Development Specialist IRG EGP Task 1.3, 1.4;Cross-Cutting: Procurement, Public Awareness 996.0 996.0 758.3 238.3 260.0 260.0<br />
22 Amany Mahmoud Office Manager - Cairo IRG EGP Cross-Cutting: Admin, Procurment 996.0 996.0 758.3 238.3 260.0 260.0<br />
23 Alaa Hafez Accountant Cairo IRG EGP Admin 195.0 195.0 195.0 195.0 - -<br />
24 Iman Choucri Accountant Cairo IRG EGP Admin 562.7 562.7 238.3 - 238.3 -<br />
25 Dahlia Hamdy Training Specialist - Cairo IRG EGP Cross-Cutting:Training 996.0 996.0 758.3 238.3 260.0 260.0<br />
26 Sherihan Radi Accountant Cairo IRG EGP Admin 216.0 216.0 216.0 - - 216.0<br />
27 Ramy Galy Regional Officer - Zagazig IRG EGP Admin 996.0 996.0 758.3 238.3 260.0 260.0<br />
28 Waleed Al-Refai Regional Officer - Mansoura IRG EGP Admin 996.0 996.0 628.3 108.3 260.0 260.0<br />
29 Tamer Gomaa Management Information Systems Specialist - Zagazig IRG EGP 140.0 140.0 39.0 - - 39.0<br />
30 Aymen Shedid Water Resources Management Specialist - Zagazig IRG EGP 366.0 366.0 239.0 - - 239.0<br />
31 Mohamed Hany El Bakry Water Resources Management Specialist - Mansura IRG EGP 140.0 140.0 30.0 - - 30.0<br />
32 Akmal Badie Management Information Systems Specialist - Mansura IRG EGP 367.0 367.0 241.0 - - 241.0<br />
33 Moamen El Sharkawy Organization/Institutional Development Specialist IRG EGP Task 1.1,1.2 362.0 362.0 331.0 - 90.0 241.0<br />
34 Amira Abdel Hady Organization/Institutional Development Specialist IRG EGP Task 1.1,1.2 362.0 362.0 331.0 - 90.0 241.0<br />
35 Abdel Bary Taher Communication and Public Awareness Specialist IRG EGP Public Awareness 57.0 57.0 57.0 - 57.0<br />
36 El Bayoumi Aly Water Resources Management Specialist IRG EGP 130.0 130.0 130.0 - - 130.0<br />
37 Ahmed El Beheiry On Farm Irrigation Specialist IRG EGP Task 1.3 45.0 45.0 33.0 - - 33.0<br />
38 Nabil Nassif Water Resources Management Specialist IRG EGP Task 2.3 110.0 110.0 27.0 - - 27.0<br />
39 Walid Yehia Sallam Agricultural Economist IRG EGP Task 1.3 195.0 195.0 121.5 - 75.0 46.5<br />
40 Mohamed Abdel Wahab Crops Agricultural Specialist IRG EGP Task 1.3 78.0 78.0 35.0 - - 35.0<br />
41 Soha Mustafa Management Information Systems Specialist - Zagazig IRG EGP 130.0 130.0 130.0 - - 130.0<br />
42 Ibrahim Farag Mansura Regional Advisor IRG EGP 216.0 216.0 35.0 - - 35.0<br />
43 Ibrahim Elassiouti Water Resources Training Specialist IRG EGP Cross-Cutting: Training, M&E 240.0 240.0 240.0 206.0 34.0 -<br />
44 El Sayed Nagi Mansura Regional Advisor IRG EGP 619.0 619.0 619.0 132.0 264.0 223.0<br />
45 TBD Irrigation and Drainage Maintenance Specialist IRG EGP 200.0 200.0 - - - -<br />
46 TBD Soil and Water Agronomist IRG EGP 200.0 200.0 - - - -<br />
47 TBD PPP Specialist IRG EGP 70.0 70.0 - - - -<br />
48 Sami Yacoub Senior Organization/Institutional Development Specialist IRG EGP Task 1.4 60 60 60 6 24 30<br />
Total Expat 2,775 2,841 1,340 528 636 417<br />
Total Local 12,033 12,033 8,526 2,077 2,635 3,814<br />
Grand Total 14,808 14,874 9,866 2,605 3,271 4,231
ANNEX E: Year 3 Annual Training<br />
Report<br />
Overseas and In-country<br />
Year 3<br />
(Training conducted during January – December 2011)<br />
42 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
Table of Contents<br />
TASK 1.1: FORMATION AND DEVELOPMENT OF BCWUAS 44<br />
.TASK 1.3: <strong>WATER</strong> PRODUCTIVITY AND EFFICIENCY 45<br />
TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />
<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS 46<br />
TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />
SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>RESOURCE</strong>S<br />
<strong>MANAGEMENT</strong> 46<br />
TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL 48<br />
MONITORING AND EVALUATION 48<br />
CROSS CUTTING TASK 48<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 43
TASK 1.1: FORMATION AND DEVELOPMENT OF BCWUAS<br />
Code Course Title Task Type Dur. Start Date End Date Directorate No. of Part.<br />
Task # 1.1<br />
No. of<br />
Females<br />
1.1.3.1.1 BCWUAs Activation Follow-Up & Dev. Of IMP 1.1 Workshop 1 13-Feb-11 13-Feb-11 Qualubia 41 15<br />
1.1.3.1.2 BCWUAs Activation Follow-Up & Dev. Of IMP 1.1 Workshop 1 14-Feb-11 14-Feb-11 E.Sharkia 29 9<br />
1.1.3.1.3 BCWUAs Activation Follow-Up & Dev. Of IMP 1.1 Workshop 1 16-Feb-11 16-Feb-11 Salhiya 36 18<br />
1.1.3.1.4 BCWUAs Activation Follow-Up & Dev. Of IMP 1.1 Workshop 1 17-Feb-11 17-Feb-11 Ismailia 26 9<br />
1.1.3.1.5 BCWUAs Activation Follow-Up & Dev. Of IMP 1.1 Workshop 1 20-Feb-11 20-Feb-11 S.Dakahlia 30 18<br />
1.1.3.1.6 BCWUAs Activation Follow-Up & Dev. Of IMP 1.1 Workshop 2 21-Feb-11 21-Feb-11 Damietta & El Salam 38 14<br />
1.1.3.1.7 BCWUAs Activation Follow-Up & Dev. Of IMP 1.1 Workshop 3 22-Feb-11 22-Feb-11 E.Dakahlia 43 9<br />
1.1.3.3.1 BCWUAs Chairperson Activation 1.1 Workshop 1 30-Mar-11 30-Mar-11 Qualubia 62 13<br />
1.1.3.3.2 BCWUAs Chairperson Activation 1.1 Workshop 1 31-Mar-11 31-Mar-11 Qualubia 62 10<br />
1.1.3.3.3 BCWUAs Chairperson Activation 1.1 Workshop 1 3-Apr-11 3-Apr-11 E.Sharkia 101 4<br />
1.1.3.3.4 BCWUAs Chairperson Activation 1.1 Workshop 1 4-Apr-11 4-Apr-11 Salhiya 93 11<br />
1.1.3.3.5 BCWUAs Chairperson Activation 1.1 Workshop 1 5-Apr-11 5-Apr-11 Ismailia 28 9<br />
1.1.3.3.6 BCWUAs Chairperson Activation 1.1 Workshop 1 10-Apr-11 10-Apr-11 S.Dakahliya 117 16<br />
1.1.3.3.7 BCWUAs Chairperson Activation 1.1 Workshop 1 11-Apr-11 11-Apr-11 Damietta&El Salam 124 15<br />
1.1.3.3.8 BCWUAs Chairperson Activation 1.1 Workshop 1 12-Apr-11 12-Apr-11 E.Dakahliya 101 7<br />
1.1.3.3.9 BCWUAs Chairperson Activation 1.1 Workshop 1 13-Apr-11 13-Apr-11 E.Dakahliya 84 8<br />
1.1.3.4.1 BCWUA's Women Board Members 1.1 Workshop 1 23-May-11 23-May-11 Qualubia 43 34<br />
1.1.3.4.2 BCWUA's Women Board Members 1.1 Workshop 1 24-May-11 24-May-11 Sharkia 29 16<br />
1.1.3.4.3 BCWUA's Women Board Members 1.1 Workshop 1 25-May-11 25-May-11 Salhiya 33 21<br />
1.1.3.4.4 BCWUA's Women Board Members 1.1 Workshop 1 26-May-11 26-May-11 Ismailia 24 16<br />
1.1.3.4.5 BCWUA's Women Board Members 1.1 Workshop 1 29-May-11 29-May-11 S. Dakahlia 32 27<br />
1.1.3.4.6 BCWUA's Women Board Members 1.1 Workshop 1 30-May-11 30-May-11 Damietta& El Salam 40 27<br />
1.1.3.4.7 BCWUA's Women Board Members 1.1 Workshop 1 31-May-11 31-May-11 E.&S.Dakahlia 54 41<br />
1.1.3.5.1 Participatory Water Management Phase I 1.1 Workshop 2 7-Sep-11 8-Sep-11 Qualubia 42 13<br />
1.1.3.5.2 Participatory Water Management Phase I 1.1 Workshop 2 12-Sep-11 13-Sep-11 S.Dakahlia 29 10<br />
1.1.3.5.3 Participatory Water Management Phase I 1.1 Workshop 2 14-Sep-11 15-Sep-11 E.Dakhlia 44 11<br />
1.1.3.5.4 Participatory Water Management Phase I 1.1 Workshop 2 18-Sep-11 19-Sep-11 E.Sharkia 30 10<br />
1.1.3.5.5 Participatory Water Management Phase I 1.1 Workshop 2 20-Sep-11 21-Sep-11 Salhiya 41 13<br />
1.1.3.5.6 Participatory Water Management Phase I 1.1 Workshop 2 28-Sep-11 29-Sep-11 Damietta & El Salam 38 8<br />
1.1.3.5.7 Participatory Water Management Phase I 1.1 Workshop 2 28-Sep-11 29-Sep-11 Ismailia 32 11<br />
1.1.3.7.1 Participatory Water Management Implementation Phase <strong>II</strong> 1.1 Workshop 1 21-Nov-11 21-Nov-11 Qualubia 44 13<br />
1.1.3.7.2 Participatory Water Management Implementation Phase <strong>II</strong> 1.1 Workshop 1 22-Nov-11 22-Nov-11 E.Sharkia 29 10<br />
1.1.3.7.3 Participatory Water Management Implementation Phase <strong>II</strong> 1.1 Workshop 1 23-Nov-11 23-Nov-11 Salhiya 41 11<br />
1.1.3.7.4 Participatory Water Management Implementation Phase <strong>II</strong> 1.1 Workshop 1 24-Nov-11 24-Nov-11 Ismailia 34 10<br />
1.1.3.7.5 Participatory Water Management Implementation Phase <strong>II</strong> 1.1 Workshop 1 29-Nov-11 29-Nov-11 Damietta & El Salam 38 13<br />
1.1.3.7.6 Participatory Water Management Implementation Phase <strong>II</strong> 1.1 Workshop 1 30-Nov-11 30-Nov-11 S.Dakahlia 29 8<br />
1.1.3.7.7 Participatory Water Management Implementation Phase <strong>II</strong> 1.1 Workshop 1 1-Dec-11 1-Dec-11 E.Dakahlia 44 11<br />
1.1.3.6.27 Water Advisory Meeting 1.1 Meeting 1 16-Jan-11 16-Jan-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 15 10<br />
1.1.3.6.28 Water Advisory Meeting 1.1 Meeting 1 19-Jan-11 19-Jan-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 14 7<br />
1.1.3.6.29 Water Advisory Meeting 1.1 Meeting 1 8-Mar-11 8-Mar-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 18 10<br />
1.1.3.6.30 Water Advisory Meeting 1.1 Meeting 1 9-Mar-11 9-Mar-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 14 7<br />
1.1.3.6.31 Water Advisory Meeting 1.1 Meeting 1 24-Apr-11 24-Apr-11 Sharkia + Salhiya 14 5<br />
1.1.3.6.32 Water Advisory Meeting 1.1 Meeting 1 26-Apr-11 26-Apr-11 Ismailia & Qualubia 18 7<br />
1.1.3.6.33 Water Advisory Meeting 1.1 Meeting 1 27-Apr-11 27-Apr-11 Damietta&El Salam 11 4<br />
1.1.3.6.34 Water Advisory Meeting 1.1 Meeting 1 28-Apr-11 28-Apr-11 E.&S.Dakahlia 16 9<br />
1.1.3.6.35 Water Advisory Meeting 1.1 Meeting 1 15-May-11 15-May-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 11 6<br />
1.1.3.6.36 Water Advisory Meeting 1.1 Meeting 1 16-May-11 16-May-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 7 2<br />
1.1.3.6.37 Water Advisory Meeting 1.1 Meeting 1 27-Jun-11 27-Jun-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 15 9<br />
1.1.3.6.38 Water Advisory Meeting 1.1 Meeting 1 30-Jun-11 30-Jun-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 14 8<br />
1.1.3.6.39 Water Advisory Meeting 1.1 Meeting 2 15-Aug-11 15-Aug-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 15 9<br />
1.1.3.6.40 Water Advisory Meeting 1.1 Meeting 1 16-Aug-11 16-Aug-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 14 7<br />
1.1.3.6.41 Water Advisory Meeting 1.1 Meeting 1 3-Oct-11 3-Oct-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 15 9<br />
1.1.3.6.42 Water Advisory Meeting 1.1 Meeting 1 25-Sep-11 25-Sep-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 14 7<br />
1.1.3.6.43 Water Advisory Meeting 1.1 Meeting 1 3-Oct-11 3-Oct-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 14 9<br />
1.1.3.6.44 Water Advisory Meeting 1.1 Meeting 1 31-Oct-11 31-Oct-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 14 7<br />
1.1.3.6.45 Water Advisory Meeting 1.1 Meeting 1 12-Dec-11 12-Dec-11<br />
Sharkia, Salhiya,<br />
Ismailia & Qualubia 14 9<br />
1.1.3.6.46 Water Advisory Meeting 1.1 Meeting 1 13-Dec-11 13-Dec-11<br />
Damietta&El Salam,<br />
E.&S.Dakahlia 14 7<br />
44 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
TASK 1.3: <strong>WATER</strong> PRODUCTIVITY AND EFFICIENCY<br />
Code Course Title Task Type Dur. Start Date End Date Directorate No. of Part. Females<br />
Task # 1.3<br />
1.3.3.1.1 Staff Building Capacity for HVCs 1.3 Workshop 1 6-Apr-11 6-Apr-11 E.Sharkia 13 1<br />
1.3.3.1.2 Staff Building Capacity for HVCs 1.3 Workshop 1 13-Apr-11 13-Apr-11 E.Sharkia 11 2<br />
1.3.3.1.3 Staff Building Capacity for HVCs 1.3 Workshop 1 27-Apr-11 27-Apr-11 Qualubia 48 7<br />
1.3.3.1.4 Staff Building Capacity for HVCs 1.3 Workshop 1 31-May 31-May S.Dakahlia 30 6<br />
1.3.3.1.5 Staff Building Capacity for HVCs 1.3 Workshop 1 7-Sep 7-Sep Damietta & El Salam 42 6<br />
1.3.3.1.6 Staff Building Capacity for HVCs 1.3 Workshop 1 21-Sep 21-Sep E.Dakahlia 49 7<br />
1.3.3.1.7 Staff Building Capacity for HVCs 1.3 Workshop 1 11-Dec 11-Dec Ismailia 31 4<br />
1.3.3.1.8 Staff Building Capacity for HVCs 1.3 Workshop 1 12-Dec 12-Dec Salhiya 35 3<br />
1.3.3.2.1 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 7-Apr-11 7-Apr-11 E.Sharkia 40 0<br />
1.3.3.2.2 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 14-Apr-11 14-Apr-11 E.Sharkia 37 1<br />
1.3.3.2.3 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 26-Apr-11 26-Apr-11 E.Sharkia 55 0<br />
1.3.3.2.4 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 28-Apr-11 28-Apr-11 Benha 37 4<br />
1.3.3.2.5 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 11-May-11 11-May-11 Benha 56 7<br />
1.3.3.2.6 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 12-May-11 12-May-11 Benha 18 3<br />
1.3.3.2.7 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 1-Jun-11 1-Jun-11 S.Dakahlia 74 1<br />
1.3.3.2.8 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 2-Jun-11 2-Jun-11 S.Dakahlia 109 5<br />
1.3.3.2.9 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 8-Sep-11 8-Sep-11 Damietta & El Salam 46 1<br />
1.3.3.2.10 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 22-Sep-11 22-Sep-11 E.Dakhalia 52 3<br />
1.3.3.2.11 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 28-Sep-11 28-Sep-11 El Salam 64 4<br />
1.3.3.2.12 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 29-Sep-11 29-Sep-11 El Salam 56 4<br />
1.3.3.2.13 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 18-Oct-11 18-Oct-11 E.Dakahlia 60 2<br />
1.3.3.2.14 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 19-Oct-11 19-Oct-11 E.Dakahlia 71 3<br />
1.3.3.2.15 Dissemination of Inforamtion on HVCs 1.3 Workshop 1 20-Oct-11 20-Oct-11 E.Dakahlia 57 3<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 45
TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />
<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />
Code Course Title Task Type Dur. Start Date End Date Directorate No. of Part.<br />
No. of<br />
Females<br />
Task # 2.2<br />
2.2.2.80 Directorate M.Meeting 2.2 Meeting 1 24-Jan-11 24-Jan-11 Qualubia 11 0<br />
2.2.2.81 Directorate M.Meeting 2.2 Meeting 1 26-Jan-11 26-Jan-11 Ismailia 9 2<br />
2.2.2.82 Directorate M.Meeting 2.2 Meeting 1 27-Jan-11 27-Jan-11 Sharkia*Salhiya 17 2<br />
2.2.2.83 Directorate M.Meeting 2.2 Meeting 1 26-Jan-11 26-Jan-11 Damietta & El Salam 10 1<br />
2.2.2.84 Directorate M.Meeting 2.2 Meeting 1 27-Jan-11 27-Jan-11 E.&S. Dakahlia 17 3<br />
2.2.2.85 Directorate M.Meeting 2.2 Meeting 1 22-Feb-11 22-Feb-11 Sharkia*Salhiya 18 2<br />
2.2.2.86 Directorate M.Meeting 2.2 Meeting 1 23-Feb-11 23-Feb-11 Ismailia 9 2<br />
2.2.2.87 Directorate M.Meeting 2.2 Meeting 1 24-Feb-11 24-Feb-11 Qualubia 11 0<br />
2.2.2.88 Directorate M.Meeting 2.2 Meeting 1 27-Feb-11 27-Feb-11 Damietta & El Salam 9 1<br />
2.2.2.89 Directorate M.Meeting 2.2 Meeting 1 28-Feb-11 28-Feb-11 E.&S. Dakahlia 17 2<br />
2.2.2.90 Directorate M.Meeting 2.2 Meeting 1 13-Mar-11 13-Mar-11 Damietta & El Salam 22 3<br />
2.2.2.91 Directorate M.Meeting 2.2 Meeting 1 14-Mar-11 14-Mar-11 E.&S. Dakahlia 34 2<br />
2.2.2.92 Directorate M.Meeting 2.2 Meeting 1 15-Mar-11 15-Mar-11 Sharkia*Salhiya 35 2<br />
2.2.2.93 Directorate M.Meeting 2.2 Meeting 1 16-Mar-11 16-Mar-11 Ismailia 24 2<br />
2.2.2.94 Directorate M.Meeting 2.2 Meeting 1 17-Mar-11 17-Mar-11 Qualubia 21 0<br />
2.2.2.95 Directorate M.Meeting 2.2 Meeting 1 17-Apr-11 17-Apr-11 Qualubia 11 0<br />
2.2.2.96 Directorate M.Meeting 2.2 Meeting 1 21-Apr-11 21-Apr-11 ismailia 9 1<br />
2.2.2.97 Directorate M.Meeting 2.2 Meeting 1 21-Apr-11 21-Apr-11 E.&S. Dakahlia 15 2<br />
2.2.2.98 Directorate M.Meeting 2.2 Meeting 1 24-Apr-11 24-Apr-11 Sharkia*Salhiya 19 2<br />
2.2.2.99 Directorate M.Meeting 2.2 Meeting 1 24-Apr-11 24-Apr-11 Damietta & El Salam 10 1<br />
2.2.2.100 Directorate M.Meeting 2.2 Meeting 1 18-May-11 18-May-11 E.&S. Dakahlia 16 1<br />
2.2.2.101 Directorate M.Meeting 2.2 Meeting 1 15-May-11 15-May-11 Damietta & El Salam 10 1<br />
2.2.2.102 Directorate M.Meeting 2.2 Meeting 1 17-May-11 17-May-11 Qualubia 12 0<br />
2.2.2.103 Directorate M.Meeting 2.2 Meeting 1 18-May-11 18-May-11 Ismailia 9 2<br />
2.2.2.104 Directorate M.Meeting 2.2 Meeting 1 19-May-11 19-May-11 Sharkia*Salhiya 18 2<br />
2.2.2.105 Directorate M.Meeting 2.2 Meeting 1 20-Jun-11 20-Jun-11 Qualubia 11 0<br />
2.2.2.106 Directorate M.Meeting 2.2 Meeting 1 21-Jun-11 21-Jun-11 Ismailia 9 1<br />
2.2.2.107 Directorate M.Meeting 2.2 Meeting 1 22-Jun-11 22-Jun-11 Sharkia*Salhiya 18 2<br />
2.2.2.108 Directorate M.Meeting 2.2 Meeting 1 21-Jun-11 21-Jun-11 Damietta & El Salam 10 1<br />
2.2.2.109 Directorate M.Meeting 2.2 Meeting 1 22-Jun-11 22-Jun-11 E.&S. Dakahlia 16 1<br />
2.2.2.110 Directorate M.Meeting 2.2 Meeting 1 6-Jul-11 6-Jul-11 Damietta & El Salam 10 2<br />
2.2.2.111 Directorate M.Meeting 2.2 Meeting 1 7-Jul-11 7-Jul-11 E.&S. Dakahlia 16 3<br />
2.2.2.112 Directorate M.Meeting 2.2 Meeting 1 20-Jul-11 20-Jul-11 Ismailia 9 2<br />
2.2.2.113 Directorate M.Meeting 2.2 Meeting 1 21-Jul-11 21-Jul-11 Sharkia*Salhiya 17 1<br />
2.2.2.114 Directorate M.Meeting 2.2 Meeting 1 25-Jul-11 25-Jul-11 Qualubia 12 0<br />
2.2.2.115 Directorate M.Meeting 2.2 Meeting 1 7-Aug-11 7-Aug-11 Damietta & El Salam 10 2<br />
2.2.2.116 Directorate M.Meeting 2.2 Meeting 1 8-Aug-11 8-Aug-11 E.&S. Dakahlia 17 3<br />
2.2.2.117 Directorate M.Meeting 2.2 Meeting 1 17-Aug-11 17-Aug-11 Sharkia*Salhiya 17 1<br />
2.2.2.118 Directorate M.Meeting 2.2 Meeting 1 21-Aug-11 21-Aug-11 Qualubia 11 0<br />
2.2.2.119 Directorate M.Meeting 2.2 Meeting 1 27-Sep-11 27-Sep-11 Ismailia 9 2<br />
2.2.2.120 Directorate M.Meeting 2.2 Meeting 1 19-Sep-11 19-Sep-11 Damietta & El Salam 10 1<br />
2.2.2.121 Directorate M.Meeting 2.2 Meeting 1 20-Sep-11 20-Sep-11 E.&S. Dakahlia 17 3<br />
2.2.2.122 Directorate M.Meeting 2.2 Meeting 1 22-Sep-11 22-Sep-11 Qualubia 11 0<br />
2.2.2.123 Directorate M.Meeting 2.2 Meeting 1 26-Sep-11 26-Sep-11 Sharkia*Salhiya 17 1<br />
2.2.2.124 Directorate M.Meeting 2.2 Meeting 1 27-Sep-11 27-Sep-11 Ismailia 9 2<br />
2.2.2.125 Directorate M.Meeting 2.2 Meeting 1 26-Oct-11 26-Oct-11 Ismailia 11 2<br />
2.2.2.126 Directorate M.Meeting 2.2 Meeting 1 23-Oct-11 23-Oct-11 Sharkia*Salhiya 20 2<br />
2.2.2.127 Directorate M.Meeting 2.2 Meeting 1 25-Oct-11 25-Oct-11 Qualubia 13 1<br />
2.2.2.128 Directorate M.Meeting 2.2 Meeting 1 26-Oct-11 26-Oct-11 Damietta & El Salam 12 3<br />
2.2.2.129 Directorate M.Meeting 2.2 Meeting 1 27-Oct-11 27-Oct-11 E.&S. Dakahlia 19 4<br />
2.2.2.130 Directorate M.Meeting 2.2 Meeting 1 21-Nov-11 21-Nov-11 Damietta & El Salam 12 3<br />
2.2.2.131 Directorate M.Meeting 2.2 Meeting 1 22-Nov-11 22-Nov-11 E.&S. Dakahlia 19 4<br />
2.2.2.132 Directorate M.Meeting 2.2 Meeting 1 20-Nov-11 20-Nov-11 Sharkia*Salhiya 20 2<br />
2.2.2.133 Directorate M.Meeting 2.2 Meeting 1<br />
2.2.2.134 Directorate M.Meeting 2.2 Meeting 1<br />
2.2.3.3.1 Maintenance Meeting 2.2 Meeting 1 10-Apr-11 10-Apr-11 Qualubia 9 5<br />
2.2.3.3.2 Maintenance Meeting 2.2 Meeting 1 11-Apr-11 11-Apr-11 E.Sharkia +Salhiya 14 8<br />
2.2.3.3.3 Maintenance Meeting 2.2 Meeting 1 12-Apr-11 12-Apr-11 Ismailia 8 3<br />
2.2.3.3.4 Maintenance Meeting 2.2 Meeting 1 3-May-11 3-May-11 E.&S.Dakahlia 14 7<br />
2.2.3.3.5 Maintenance Meeting 2.2 Meeting 1 4-May-11 4-May-11 Damietta&El Salam 8 4<br />
2.2.3.5.1 Basic Management Skills 2.2 Class 2 12-Mar-11 13-Mar-11 S.Dakahlia 28 14<br />
2.2.3.5.2 Basic Management Skills 2.2 Class 2 16-Mar-11 17-Mar-11 E.Dakahlia 24 7<br />
2.2.3.5.3 Basic Management Skills 2.2 Class 2 19-Mar-11 20-Mar-11 E.Dakahlia 23 8<br />
2.2.3.5.4 Basic Management Skills 2.2 Class 2 23-Mar-11 24-Mar-11 E.Sharkia 31 7<br />
2.2.3.5.5 Basic Management Skills 2.2 Class 2 26-Mar-11 27-Mar-11 Salhiya 41 13<br />
2.2.3.5.6 Basic Management Skills 2.2 Class 2 28-Mar-11 29-Mar-11 Ismailia 37 14<br />
2.2.3.5.7 Basic Management Skills 2.2 Class 2 4-Apr-11 5-Apr-11 Damiertta & El Salam 37 13<br />
2.2.3.5.8 Basic Management Skills 2.2 Class 2 6-Apr-11 7-Apr-11 Qualubia 47 20<br />
2.2.3.3.1 Advanced Computer Skills 2.2 Class 2 15-Oct-11 16-Oct-11 E.Sharkia 11 8<br />
2.2.3.3.2 Advanced Computer Skills 2.2 Class 2 17-Oct-11 18-Oct-11 Salhiya 11 7<br />
2.2.3.3.3 Advanced Computer Skills 2.2 Class 2 19-Oct-11 20-Oct-11 S.Dakahlia 10 4<br />
2.2.3.3.4 Advanced Computer Skills 2.2 Class 2 22-Oct-11 23-Oct-11 E.Dakahlia 18 10<br />
2.2.3.3.5 Advanced Computer Skills 2.2 Class 2 26-Oct-11 27-Oct-11 Qualubia 12 7<br />
2.2.3.3.6 Advanced Computer Skills 2.2 Class 2 29-Oct-11 30-Oct-11 Ismailia 14 6<br />
2.2.3.3.7 Advanced Computer Skills 2.2 Class 2 12-Nov-11 13-Nov-11 Damiertta & El Salam 16 8<br />
46 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />
SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>RESOURCE</strong>S<br />
<strong>MANAGEMENT</strong><br />
Code Course Title Task Type Dur. Start Date End Date Directorate No. of Part.<br />
No. of<br />
Females<br />
Task # 2.3<br />
2.3.3.4.1 DigiTAL Map BC Area Survey 2.3 Class 3 6-Feb-11 8-Feb-11 E.Dakahlia 18 6<br />
2.3.3.4.2 DigiTAL Map BC Area Survey 2.3 Class 3 13-Feb-11 15-Feb-11 S.Dakahlia 12 6<br />
2.3.3.4.3 DigiTAL Map BC Area Survey 2.3 Class 3 20-Feb-11 22-Feb-11 E.Sharkia 12 4<br />
2.3.3.4.4 DigiTAL Map BC Area Survey 2.3 Class 3 27-Feb-11 1-Mar-11 Salhiya 16 7<br />
2.3.3.4.5 DigiTAL Map BC Area Survey 2.3 Class 3 6-Mar-11 8-Mar-11 Damiertta & El Salam 17 11<br />
2.3.3.4.6 DigiTAL Map BC Area Survey 2.3 Class 3 13-Mar-11 15-Mar-11 Qualubia 20 7<br />
2.3.3.4.7 DigiTAL Map BC Area Survey 2.3 Class 3 20-Mar-11 22-Mar-11 Ismailia 14 7<br />
2.3.3.3.1 Ground Water Database 2.3 Class 2 28-Mar-11 29-Mar-11 Damietta & El Salam 16 11<br />
2.3.3.3.2 Ground Water Database 2.3 Class 2 9-Apr-11 10-Apr-11 Salhiya 15 6<br />
2.3.3.3.3 Ground Water Database 2.3 Class 2 18-Apr-11 19-Apr-11 E.Dakahlia 17 7<br />
2.3.3.3.4 Ground Water Database 2.3 Class 2 26-Apr-11 27-Apr-11 S.Dakahlia 12 7<br />
2.3.3.3.5 Ground Water Database 2.3 Class 2 2-May-11 3-May-11 Ismailia 13 8<br />
2.3.3.3.6 Ground Water Database 2.3 Class 2 7-May-11 10-May-11 Qualubia 18 9<br />
2.3.3.3.7 Ground Water Database 2.3 Class 2 16-May-11 17-May-11 Sharkia 12 5<br />
2.3.3.2.1 Follow-Up of Water Level & Complaints DB 2.3 Class 1 4-Apr-11 4-Apr-11 S.Dakahliya 12 8<br />
2.3.3.2.2 Follow-Up of Water Level & Complaints DB 2.3 Class 1 5-Apr-11 6-Apr-11 E.Dakahliya 17 8<br />
2.3.3.2.3 Follow-Up of Water Level & Complaints DB 2.3 Class 1 7-Apr-11 7-Apr-11 Damietta&El Salam 14 9<br />
2.3.3.2.4 Follow-Up of Water Level & Complaints DB 2.3 Class 1 11-Apr-11 12-Apr-11 Qualubia 18 11<br />
2.3.3.2.5 Follow-Up of Water Level & Complaints DB 2.3 Class 1 13-Apr-11 13-Apr-11 E.Sharkia 12 6<br />
2.3.3.2.6 Follow-Up of Water Level & Complaints DB 2.3 Class 1 17-Apr-11 18-Apr-11 Salhiya 18 9<br />
2.3.3.2.7 Follow-Up of Water Level & Complaints DB 2.3 Class 1 21-Apr-11 21-Apr-11 Ismailia 14 10<br />
2.3.2.13.6 Ground Water Monitoring 2.3 Class 2 5-Mar-11 6-Mar-11 S.Dakahlia 18 5<br />
2.3.2.13.7 Ground Water Monitoring 2.3 Class 2 9-Mar-11 10-Mar-11 E.Dakahlia 26 4<br />
2.3.3.7.1 Water Resources Inventory 2.3 Class 1 16-Oct-11 16-Oct-11 Ismailia 15 6<br />
2.3.3.7.2 Water Resources Inventory 2.3 Class 1 20-Oct-11 20-Oct-11 E.Sharkia 13 3<br />
2.3.3.7.3 Water Resources Inventory 2.3 Class 1 22-Oct-11 22-Oct-11 Salhiya 15 4<br />
2.3.3.7.4 Water Resources Inventory 2.3 Class 1 23-Oct-11 23-Oct-11 Qualubia 17 5<br />
2.3.3.7.5 Water Resources Inventory 2.3 Class 1 27-Oct-11 27-Oct-11 Damietta &El Salam 15 4<br />
2.3.3.7.6 Water Resources Inventory 2.3 Class 1 29-Oct-11 29-Oct-11 E.Dakahlia 27 9<br />
2.3.3.7.7 Water Resources Inventory 2.3 Class 1 30-Oct-11 30-Oct-11 S.Dakahlia 18 8<br />
2.3.3.15.1 Water Quality Monitoring Follow-Up 2.3 Class 1 20-Nov-11 20-Nov-11 Damietta & El Salam 16 6<br />
2.3.3.7.2 Water Quality Monitoring Follow-Up 2.3 Class 1 11-Dec-11 11-Dec-11 S.Dakahlia 12 3<br />
2.3.3.7.3 Water Quality Monitoring Follow-Up 2.3 Class 1 18-Dec-11 18-Dec-11 E.Dakahlia 12 3<br />
2.3.3.7.4 Water Quality Monitoring Follow-Up 2.3 Class 1 25-Dec-11 25-Dec-11 E.Dakahlia 12 2<br />
2.3.3.17.1 Ground Water Database (Directorate Version) 2.3 Class 1 15-Oct-11 15-Oct-11 Ismailia 11 4<br />
2.3.3.17.2 Ground Water Database (Directorate Version) 2.3 Class 1 22-Oct-11 22-Oct-11 Qualubia 17 9<br />
2.3.3.17.3 Ground Water Database (Directorate Version) 2.3 Class 1 29-Oct-11 29-Oct-11 Sharkia +Salhiya 31 11<br />
2.3.3.17.4 Ground Water Database (Directorate Version) 2.3 Class 1 20-Dec-11 20-Dec-11 E. & S.Dakahlia 26 5<br />
2.3.3.17.5 Ground Water Database (Directorate Version) 2.3 Class 1 25-Dec-11 25-Dec-11 Damietta & El Salam 16 4<br />
2.3.3.18.1 Ground Water Monitoring Follow-Up 2.3 Class 1 20-Oct-11 20-Oct-11 Qualubia 16 7<br />
2.3.3.18.2 Ground Water Monitoring Follow-Up 2.3 Class 1 22-Oct-11 22-Oct-11 Sharkia +Salhiya 27 8<br />
2.3.3.18.3 Ground Water Monitoring Follow-Up 2.3 Class 1 20-Dec-11 20-Dec-11 Ismailia 14 4<br />
2.3.3.18.4 Ground Water Monitoring Follow-Up 2.3 Class 1 25-Dec-11 25-Dec-11 E. & S.Dakahlia 26 10<br />
2.3.3.18.5 Ground Water Monitoring Follow-Up 2.3 Class 1 27-Dec-11 27-Dec-11 Damietta & El Salam 16 6<br />
2.3.3.14.1 Water Distribution Meeting 2.3 Meeting 1 23-Jan-11 23-Jan-11<br />
2.3.3.14.2 Water Distribution Meeting 2.3 Meeting 1 24-Jan-11 24-Jan-11<br />
2.3.3.14.3 Water Distribution Meeting 2.3 Meeting 1 8-Mar-11 8-Mar-11<br />
2.3.3.14.4 Water Distribution Meeting 2.3 Meeting 1 10-Mar-11 10-Mar-11<br />
2.3.3.14.5 Water Distribution Meeting 2.3 Meeting 1 19-Mar-11 19-Mar-11<br />
2.3.3.14.6 Water Distribution Meeting 2.3 Meeting 1 20-Mar-11 20-Mar-11<br />
2.3.3.14.7 Water Distribution Meeting 2.3 Meeting 1 20-Apr-11 20-Apr-11<br />
2.3.3.14.8 Water Distribution Meeting 2.3 Meeting 1 21-Apr-11 21-Apr-11<br />
2.3.3.14.9 Water Distribution Meeting 2.3 Meeting 1 19-Jun-11 19-Jun-11<br />
2.3.3.14.10 Water Distribution Meeting 2.3 Meeting 1 20-Jun-11 20-Jun-11<br />
2.3.3.14.11 Water Distribution Meeting 2.3 Meeting 1 10-Jul-11 10-Jul-11<br />
2.3.3.14.12 Water Distribution Meeting 2.3 Meeting 1 11-Jul-11 11-Jul-11<br />
2.3.3.14.13 Water Distribution Meeting 2.3 Meeting 1 23-Aug-11 23-Aug-11<br />
2.3.3.14.14 Water Distribution Meeting 2.3 Meeting 1 24-Aug-11 24-Aug-11<br />
2.3.3.14.15 Water Distribution Meeting 2.3 Meeting 1 12-Sep-11 12-Sep-11<br />
2.3.3.14.16 Water Distribution Meeting 2.3 Meeting 1 13-Sep-11 13-Sep-11<br />
2.3.3.14.17 Water Distribution Meeting 2.3 Meeting 1 10-Oct-11 10-Oct-11<br />
2.3.3.14.18 Water Distribution Meeting 2.3 Meeting 1 11-Oct-11 11-Oct-11<br />
2.3.3.14.19 Water Distribution Meeting 2.3 Meeting 1 29-Nov-11 29-Nov-11<br />
2.3.3.14.20 Water Distribution Meeting 2.3 Meeting 1 1-Dec-11 1-Dec-11<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 5 2<br />
Damietta & Salam<br />
S.&E.Dakahliya 4 3<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 6 0<br />
Damietta & Salam<br />
S.&E.Dakahliya 5 1<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 5 2<br />
Damietta & Salam<br />
S.&E.Dakahliya 4 3<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 5 2<br />
Damietta & Salam<br />
S.&E.Dakahliya 4 3<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 6 2<br />
Damietta & Salam<br />
S.&E.Dakahliya 6 4<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 6 0<br />
Damietta & Salam<br />
S.&E.Dakahliya 6 4<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 6 1<br />
Damietta & Salam<br />
S.&E.Dakahliya 6 4<br />
Damietta & Salam<br />
S.&E.Dakahliya 5 1<br />
Damietta & Salam<br />
S.&E.Dakahliya 6 5<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 4 1<br />
Damietta & Salam<br />
S.&E.Dakahliya 6 4<br />
E.Sharkiya, Ismailia,<br />
Salhiya & Qualubiya 4 1<br />
Damietta & Salam<br />
S.&E.Dakahliya 6 4<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 47
TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />
ID Course Title Type Target Dur. No. of No. of Venue<br />
2.4.1 M.S. in Environmental Engineering Graduate Degree MWRI Staff 2 Years 7 0 AUC<br />
2.4.2 M.S. in Environmental Engineering Graduate Degree MWRI Staff 2 Years 14 8 Egyptian Universities<br />
2.4.3 Overseas Study Tour to USA MWRI Staff MWRI Staff 10 days 9 2 USA<br />
MONITORING AND EVALUATION<br />
Code Course Title Task Type Dur. Start Date End Date Directorate No. of Part.<br />
No. of<br />
Females<br />
M&E<br />
0.3.3.1 Field Survey Data Collectors M&E Class & Field 1 8-Oct-11 9-Oct-11 Zagazig 30 4<br />
0.3.3.2 Field Survey Data Collectors M&E Class & Field 1 15-Oct-11 16-Oct-11 Mansoura 30 3<br />
CROSS CUTTING TASK<br />
Code Course Title Task Type Dur. Start Date End Date Directorate No. of Part.<br />
No. of<br />
Females<br />
Cross Cutting<br />
0.1.3.1 USAID Field Trip Visit C.C Field Trip 1 24-May-11 24-May-11 Port Said 50 0<br />
0.1.3.2 USAID Field Trip Visit C.C Field Trip 1 25-May-11 25-May-11 Dekerness 50 0<br />
0.1.3.3 USAID Field Trip Visit C.C Field Trip 1 29-Sep-11 29-Sep-11 Mataria District 10 0<br />
48 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
ANNEX F: <strong>LIFE</strong>-OF-PROJECT<br />
PROCUREMENT REPORT<br />
Status as of December 2011<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 49
I<br />
Project Office Setup/Equipment (Cairo and Regional Offices)<br />
Item Description Quantity Actual Qty<br />
Office Set-Up and Equipment (Cairo and Regional Offices)<br />
Estimated<br />
Unit Cost<br />
(EGP)<br />
Total (EGP)<br />
Actual Cost<br />
(EGP)<br />
US/ Local<br />
Cairo Office Set-up<br />
Minor refurbishment including plumbing fixtures and partitions,<br />
blinds. Equipment including phone switchboard, filing cabinets;<br />
paper shredders, shelves, boards, chairs, etc.<br />
1 shredder, 1<br />
safe, 4 filing<br />
cabinets,<br />
1 Chairs, etc. 50,000 50,000 10,400 Local<br />
Minor refurbishment including plumbing fixtures and partitions,<br />
Regional Offices Set-Up blinds. Furniture including desks, chairs, tables. Equipment<br />
including phone switchboard, fax, filing cabinets; shelving<br />
2 2 25,000 50,000 20,817 Local<br />
Telephone System Cairo Off System for 18 extensions 1 15,000 15,000<br />
Photocopier - Cairo Office Network photocopier 1 1 56,900 56,900 56,900 Local<br />
Photocopier - Reg. Office Small Office Copier 2 2 20,000 40,000 36,318 Local<br />
Subtotal 166,900 211,900 124,435<br />
Computer Equipment New and Upgrades (Cairo and Regional Offices)<br />
Desktop computer (local) 5 6 4,300 25,800 25,800 Local<br />
Uninterrupted Power Supply 5 4 440 1,760 2,200 local<br />
Notebook Computer (local) 5 9 4,500 29,944 40,527 Local<br />
Small scanner 3 2 1,000 2,000 800 Local<br />
A3/A4 Network printer 1 2 15,000 30,000 3,000 Local<br />
Color Laser jet printer 1 1 20,000 20,000 2,700 Local<br />
Stand-alone printer 4 3 2,500 7,500 5,060 local<br />
Color ink-jet printer 4 2 3,500 7,000 2,250 Local<br />
USB Flash Memory Stick 6 4 185 740<br />
External Hard Drive 6 10 860 8,600 9,965 Local<br />
Subtotal 52,285 0 92,302<br />
Training Equipment 0<br />
Data Projector 1 2 13,750 27,500 22,550<br />
Projector Screen 2 1 550 550 550<br />
Digital Camera, small 3 2 1,000 2,000 2,032<br />
TV Monitor, Receiver 3 1 3,650 3,650 3,650<br />
Subtotal 18,950 0 28,782<br />
Vehicles Purchase 0<br />
Two vehicles Cairo Purchase 3 2 169,950 339,900 315,700 Local<br />
One vehicle Zagazig Purchase 1 1 145,750 145,750 145,750 Local<br />
One vehicle Mansoura Purchase 1 1 145,750 145,750 145,750 Local<br />
Subtotal 461,450 631,400 607,200<br />
Total 699,585 843,300 852,719<br />
50 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)
Procurement for IWRM <strong>II</strong> Field Sites and MWRI Other Support Offices<br />
Total<br />
Total Cost<br />
No.<br />
Item<br />
Total Qty Actual LE USD US/ Local Status<br />
1-1.1 Standard Computer 130 130 369595 0 local Yr 1<br />
1-1.2 Standard Computer 0 20 70615 0 local Yr 2<br />
1-2.1 Database Computer 66 66 189230 0 local Yr 1<br />
1-2.2 Database Computer 9 1 3070 0 local Yr 2<br />
1-2.2 Computer (Apple) 3 3 44139 0 local Yr 2<br />
1-2.3 Database Computer 5 23375 0 local Yr 3<br />
1-3.1 Laptop 11 12 77420 0 local Yr 1<br />
1-3.2 Laptop 4 4 20000 0 local Yr 2<br />
1-3.2 Laptop (Apple) 1 1 17495 0 local Yr 2<br />
1-3.3 Laptop 1 5775 0 local Yr 3<br />
1-3.3 Laptop (Apple) 1 1 20000 0 local Yr 2<br />
1-5.1 Ink Color Printer (A3) 63 64 78473 0 local Yr 1<br />
1-5.2 Ink Color Printer (A3) 2 2 3400 0 local Yr 2<br />
1-5.3 Ink Color Printer (A3) 1 1250 0 local Yr 3<br />
1-6 Desk Jet Printer 12 10 14545 0 local Yr 1<br />
1-8.1 Laser Printer (A4) 62 65 100602 0 local Yr 1<br />
1-8.2 Laser Printer (A4) 3 3 100602 0 local Yr 2<br />
1-8.3 Laser Printer (A4) 3 4875 0 local Yr 3<br />
1-8.3 Laser Printer (Color) 1 35000 0 local Yr 3<br />
1-9 Scanner (A4) 58 59 25168 0 local Yr 1<br />
1-10.2 Scanner (A3) 1 1 9400 0 local Yr 2<br />
1-10.3 Scanner (A3) 1 500 0 local Yr 3<br />
1-11.1 USB Hard Drive 70 76 33759 0 local Yr 1<br />
1-11.2 USB Hard Drive 3 3 1500 0 local Yr 2<br />
1-12.1 Smart UPS 188 188 22278 0 local Yr 1<br />
1-12.2 Smart UPS 3 3 8700 0 local Yr 2<br />
1-13.1 Table (computer) 178 222 33180 0 local Yr 1<br />
1-13.2 Table (computer) 16 13 1820 0 local Yr 2<br />
1-14.1 Chair 183 282 54680 0 local Yr 1<br />
1-15.2 USB Flash Drive (16 MB) 4 4 1000 0 local Yr 2<br />
2-1.1 Air-conditioning (3 HP) 60 60 226800 0 local Yr 1<br />
2-1.2 Air-conditioning (3 HP) 21 21 226800 0 local Yr 2<br />
2-3.1 Photocopier 59 60 588000 0 local Yr 1<br />
2-3.3 Photocopier 2 6000 0 local Yr 3<br />
2-4.1 Fax Machine 60 59 80778 0 local Yr 1<br />
2-4.3 Fax Machine 1 1835 0 local Yr 3<br />
2-7.2 Table 1 1 675 0 local Yr 2<br />
2-8.2 Chair 4 4 4000 0 local Yr 2<br />
2-9.1 O&M Expendables 58 58 14500 local Yr 1<br />
2-9.2 O&M Expendables 58 58 174000 local Yr 2<br />
2-9.3 O&M Expendables 58 174000 0 local Yr 3<br />
3-1 Flip Chart and Stand 58 58 27258 0 local Yr 1<br />
3-2.2 TV 9 9 32850 0 local Yr 2<br />
3-4 Laptop 4 4 20000 0 local Yr 2<br />
3-6.1 Furniture 62 62 130200 0 local Yr 2<br />
3-6.2 Furniture 1 1 1150 0 local Yr 2<br />
3-7 White Board 58 59 6726 0 local Yr 2<br />
3-8.1 Digital Camera (>=5 MB) 65 66 0 5114 US Yr 2<br />
3-8.3 Digital Camera (>=5 MB) 5 4000 0 local Yr 2<br />
3-9 Sony 950 HD Camera 1 1 0 8930 US Yr 1<br />
3-10 Cannon Digital w lens 1 6798 US Yr 1<br />
3-11.2 LCD Monitor (Sony) 1 1 16500 8930 US Yr 2<br />
3-11.3 Video Sound Equip 1 0 3500 US Yr 3<br />
3-12.3 English Language Book 53 38160 0 local Yr 3<br />
3-13.1 Data Show and screen 20 21 107100 0 local Yr 1<br />
3-13.2 Data Show and screen 1 1 5000 0 local Yr 2<br />
4-1/2 Wireless Router (4 ports)/DSL Modem 58 58 24190 0 local Yr 1<br />
5-1 GPS 110 120 0 21014 US Yr 1<br />
5-2 GIS Computer 4 4 16500 0 local Yr 1<br />
5-3.2 Satellite Images 1 1 11400 0 local Yr 2<br />
5-3.3 Satellite Images 1 0 130000 local Yr 3<br />
5-4.3 Arc View Software 10 150000 0 local Yr 3<br />
6-1.1 Fiber Glass Boat 53 53 180200 0 local Yr 1<br />
6-1.2 Fiber Glass Boat 4 4 13600 0 local Yr 2<br />
6-2 Winch + Tagline (Depth Meter) 61 61 290970 0 local Yr 1<br />
6-3 Winch + Tagline (Bank to Bank) 61 61 157380 0 local Yr 1<br />
6-4 Stop Watch 61 61 15860 0 local Yr 1<br />
6-4.1 Sounding weights local made 25 Lbs 61 61 28060 0 Yr 1<br />
6-5.1 Current Meter & LCD Digital 61 61 0 84180 US Yr 1<br />
6-9.1 Data Logger Modem (Samba) 10 10 13273 0 local Yr 1<br />
6-12.1 Data Logger Modem (air link) 18 18 59994 0 local Yr 1<br />
6-10.1 Data Logger 10 10 133992 0 local Yr 1<br />
6-10.2 Data Logger 8 8 109600 0 local Yr 2<br />
6-11 Data Logger Camera 2 1 20311 0 Local Yr 1<br />
6-8.2 GW Measure Tape 53 60 26500 0 Yr 2<br />
6-9.2 Data Logger Modem (Air Link) 8 7 26425 0 local Yr 2<br />
6-6.3 LCD Digital Meter 10 25000 0 local Yr 3<br />
6-5.3 Current Meter & LCD Digital 18 0 29214 US Yr 3<br />
6-9.3 Data Logger Modem 8 30200 0 local Yr 3<br />
6-10.3 Data Logger 8 109600 0 local Yr 3<br />
6-13.3 Survey hand Level 2 10000 0 local Yr 3<br />
7-2 PH Conductivity Do TM 55 55 0 90750 US Yr 1<br />
8-1 Standard Computer 48 48 136466 0 local Yr 1<br />
8-2 Laptop 19 20 51000 0 local Yr 1<br />
8-4 All-in-one B&W Laser Printer (A4) 8 8 24720 0 local Yr 1<br />
8-5 USB Hard Drive 8 8 4000 0 Yr 1<br />
8-6 Smart UPS 48 47 55601 0 Yr 1<br />
8-7 Table 48 6 9600 0 Yr 1<br />
8-8.1 Chair 48 99 54680 0 Yr 1<br />
8-8.2 Chair 630 891 63341 0 Yr 2<br />
9 GDA Yr 2<br />
9-1.2 Shredder 2 2 20000 0 local Yr 2<br />
Shipping Costs 7536<br />
Total Cost EGP 5,130,241 $ 395,965<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 51
I<br />
U.S. Agency for International Development<br />
1300 Pennsylvania Avenue, NW<br />
Washington, DC 20523<br />
Tel: (202) 712-0000<br />
Fax: (202) 216-3524<br />
www.usaid.gov<br />
2 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)