TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />

<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />

The following activities are planned for next quarter:<br />

• Continue follow-up meetings with IWMDs to check on status and provide support.<br />

• Participate in monthly Directorate meetings.<br />

• Participate in monthly water advisory meetings.<br />

• Participate in monthly maintenance meetings.<br />

• Continue supporting the district and directorate office equipment Operation and<br />

Maintenance (O&M) program.<br />

• Conduct Administration of Contract training course (7 events).<br />

• Conduct Drainage Works training course (7 events).<br />

• Participate in January & June IWRM I evaluation meetings in five General Directorates.<br />

TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />

SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>RESOURCE</strong>S<br />

<strong>MANAGEMENT</strong><br />

The following activities are planned for next quarter:<br />

• Dr. Tom Sheng, Computer Assisted Development Inc., Expat Senior Water Resources<br />

Management Information Systems Specialist will carry out an assignment to assist with Year<br />

4 implementation activities.<br />

• Continue developing water resource databases and support consolidation of the databases at<br />

the Directorate level.<br />

• Complete ongoing Water Quality Monitoring follow-up training course (3 events).<br />

• Conduct Digital Mapping refresher training (8 events).<br />

• Complete installation of additional four data loggers. Finalize selecting the additional new<br />

nine sites and finalize the procurement and installation stages of the nine new data loggers<br />

for the new sites.<br />

• Complete calculating the water volume from the Water Level data base in the eight IWMDs<br />

that are not doing so in 2011.<br />

• Complete collecting the Water Resources Inventory data sheets from all IWMDs.<br />

• Conduct Water Budget and IWRM Plan training course.<br />

• Complete preparing and revising the digital map 11 layers in the remaining nine IWMDs and<br />

review all layers prepared by the other 36 IWMDs.<br />

• Selection of one pilot branch canal in each of the seven target remaining Directorates to test<br />

different flow measurement techniques, structures, and types of equipment. Assess the<br />

results and prepare guidelines.<br />

24 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)