INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
USAID requested a presentation on the draft Year 3 Work Plan and the project staff made the<br />
presentation on May 17.<br />
A staff meeting, including Regional Office staff, was held on May 18. Prof. Dr. Mohamed Abdel<br />
Motaleb, Head of MWRI Planning Sector, and IWRM <strong>II</strong> Project Coordinator attended part-time and<br />
discussed his expectations regarding the working relationships going forward.<br />
A Steering Committee meeting was held on 19 May. The entire committee was in attendance except<br />
for USAID, whose member was notified of the meeting with one day’s notice and had a previous<br />
commitment. The Committee approved the Year 3 Work Plan contingent on some minor<br />
modifications being made. The modifications were made and the final Work Plan was distributed.<br />
During the period May 24 – 26, Eng. Wafaa Faltaous, USAID (COTR) visited Port Said, Dekerness<br />
and East Elbohirat IWMDs and attended BCWUA meetings and the Branch Canal Water User<br />
Association (BCWUA)’s Women Board Members Orientation for Ismailia GD & IWMDs. Andrew<br />
Tczap, IRG Chief of Party, joined for the first day at Port Said, Eng. Nabil Fawzi attended the entire<br />
trip and Mr. Mohamed Anas, Economist, Ministry of International Cooperation; Department of<br />
Cooperation joined the trip on May 26.<br />
A monthly coordinating meeting was held on June 6, with John Pasch and Wafaa Faltaous of<br />
USAID, Dr. Motaleb, Eng. Mohamed El Fetyani and Eng. Nabila Bahaa of MWRI, and Andrew<br />
Tczap of IRG in attendance.<br />
USAID and IRG met on June 9 to discuss the proposed $4.9 million in-kind grants to BCWUAs.<br />
John Irons (USAID), John Pasch (USAID), Eng. Wafaa (USAID), Eng Andrew Tczap (IRG), Eng.<br />
Nabil Fawzi (IRG), and Dr. Wadie (IRG) attended this meeting. Several more meetings related to the<br />
proposed grant program were held, several with MWRI and USAID decided to abandon the<br />
proposed grants program in early August.<br />
MWRI/IRG met on June 9 to discuss the need and benefit of adding geographic information<br />
system (GIS) training to the project activities. Eng. Andrew Tczap (IRG), Eng. Nabil (IRG), Eng.<br />
Hesham Shebab (MWRI/ID), and Eng. Tarek Saied (MWRI/PS) attended. Engrs. Hesham and<br />
Tarek followed up the meeting by canvassing districts and directorates to assess capabilities and<br />
requirements. The final conclusion was that GIS was not appropriate at the district level at this time.<br />
MWRI (Central Directorate of Irrigation Advisory Service or CDIAS)/IRG met on June 14 & 22 to<br />
discuss the potential for cooperation between Livelihoods and Income from the Environment<br />
(<strong>LIFE</strong>) IWRM <strong>II</strong> project and MWRI Central Directorate of Irrigation Advisory Service (CDIAS).<br />
Eng. Andrew Tczap (IRG), Eng. Nabil Fawzi (IRG), Dr. Moamen (IRG), and Eng. Atef Elkashef<br />
(CDIAS) attended.<br />
MWRI/CDIAS and IRG personnel met on July 3 and 7 to continue investigating the potential for<br />
cooperation. Eng. Tczap (IRG), Eng. Nabil (IRG), Eng. Mohamed Elfetyani (Planning Sector), Dr.<br />
Moamen (IRG), and Eng. Atef Elkashef (CDIAS) attended these meetings. Eng. Atef suggested a<br />
training needs assessment (TNA) be conducted by CDIAS staff in the IWRM <strong>II</strong> area and the project<br />
offered their support. CDIAS began by visiting a sample of IWRM districts (50%) to conduct a<br />
TNA. Project staff from the regional offices attended most of these sessions. The CDIAS visits<br />
were completed on August 4.<br />
CDIAS and IRG met on August 10 and 17 to discuss the findings of TNA for the IWRM <strong>II</strong> Water<br />
Advisory Teams and the potential for cooperation between the IWRM <strong>II</strong> project and CDIAS. Eng.<br />
Tczap (IRG), Eng. Nabil (IRG), Eng. Mohamed Elfetyani (Planning Sector), Dr. Moamen (IRG),<br />
Eng. Nagwa (who replaced Eng. Atef Elkashef), Eng. Ahmed and Eng. Ezzat (CDIAS) attended<br />
both meetings. Eng. Wafaa (USAID) attended the August 17 th meeting. The main conclusion<br />
reached by the TNA was that refresher training was needed in some districts and would be beneficial<br />
in all districts.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 3